RESTORATION OF DAMAGE AS A RESULT OF THE FLOODS IN THE AUTUMN OF 2014. SECURING FRENCH SECTIONS (Q2040830): Difference between revisions
Jump to navigation
Jump to search
(Removed claims) |
(Changed an Item: The budget was changed) |
||||||
Property / budget | |||||||
247,778.65 Euro
| |||||||
Property / budget: 247,778.65 Euro / rank | |||||||
Normal rank | |||||||
Property / EU contribution | |||||||
0.0 Euro
| |||||||
Property / EU contribution: 0.0 Euro / rank | |||||||
Normal rank | |||||||
Property / co-financing rate | |||||||
0.0 percent
| |||||||
Property / co-financing rate: 0.0 percent / rank | |||||||
Normal rank |
Revision as of 20:40, 9 February 2022
Project Q2040830 in Italy
Language | Label | Description | Also known as |
---|---|---|---|
English | RESTORATION OF DAMAGE AS A RESULT OF THE FLOODS IN THE AUTUMN OF 2014. SECURING FRENCH SECTIONS |
Project Q2040830 in Italy |
Statements
0.0 Euro
0 references
247,778.65 Euro
0 references
0.0 percent
0 references
23 April 2015
0 references
30 June 2018
0 references
31 December 2018
0 references
COMUNE DI IMPERIA
0 references
REALIZZAZIONE DI CORDOLO A SBALZO IN CALCESTRUZZO ARMATO FONDATO SU MICROPALI (Italian)
0 references
PRODUCTION OF REINFORCED CONCRETE AND MICROPILES BASED REINFORCEMENT (English)
0 references
CONSTRUCTION D’UN CORDON DE CANTILEVER EN BÉTON ARMÉ À BASE DE MICROPILES (French)
16 December 2021
0 references
CONSTRUCTIE VAN GEWAPEND BETON CANTILEVER KOORD OP BASIS VAN MICROPILES (Dutch)
23 December 2021
0 references
BAU VON STAHLBETON CANTILEVER SCHNUR AUF BASIS VON MIKROPILES (German)
24 December 2021
0 references
CONSTRUCCIÓN DE CABLES DE VOLADIZO DE HORMIGÓN ARMADO A BASE DE MICROPILES (Spanish)
25 January 2022
0 references
IMPERIA
0 references
Identifiers
D58H16000020004
0 references