Installation of solar panels at Castrum Ferreum Ltd. in Szombathely (Q3935777): Difference between revisions
Jump to navigation
Jump to search
(Changed an Item: Adding English translations) |
(Removed claim: summary (P836): Within the framework of the development, a simplified energy development will be carried out with the installation of a solar system with a power of 18 kWh. The technical parameters of the system can be described by: Installation of 60 Suntech STP 300-20/Wfh polycrystalline solar panels in 1 Fronius SYMO 20.0-3-M transformer-free three-phase network coupled with additional mounting materials The products to be installed are among the latest,...) |
||||||||||||||
Property / summary | |||||||||||||||
Property / summary: Within the framework of the development, a simplified energy development will be carried out with the installation of a solar system with a power of 18 kWh. The technical parameters of the system can be described by: Installation of 60 Suntech STP 300-20/Wfh polycrystalline solar panels in 1 Fronius SYMO 20.0-3-M transformer-free three-phase network coupled with additional mounting materials The products to be installed are among the latest, most innovative technologies, smaller than the average products available on the market. The planned 60 Suntech solar modules STP 300-20/Wfh are installed next to the building, on the ground-mounted support structure, according to the module layout. The 60 solar panels shall be connected to 4 strings each containing 15 solar cells according to the modular allocation. It shall be connected to the inverter 2 input by the parallel binding of 2 strings. The modules are connected to the fire switch and then to the inverter with a solar wire of 6 mm². From the inverter, the system is connected to the grid via the solar panel distributor. The designed inverter is made by Fronius, SYMO 20.0-3-M, 3-phase, network regenerated. The inverter complies with all relevant standards requirements. It is possible to place it inside the building, next to the main tram distributor, mounted on the wall. The planned solar panel distribution includes: DC side per string: Overvoltage protection (T1-T2) on AC side: Overvoltage protection (T1-T2), overcurrent protection, main switch The following preparatory activities were carried out in the framework of the project: The company has contacted energetics. Subsequently, construction companies were contacted in order to map the market price and the available quality. The technical content of the development was determined taking into account the tenders, technical content and prices received. In the framework of the project, costs will only be declared in connection with the installation of the solar system. The construction process includes the following activities: At the same time as the contract is concluded, the service provider’s administration (application notification) and the connection documentation are submitted. Implementation. Once reported to the supplier, the AD-VESZ meter is installed and the payroll is accounted for. Upon completion of the works, the contractor shall issue a final invoice. The company has already successfully implemented an internship application using EU funding. The company therefore has the appropriate knowledge of carrying out the administrative tasks related to the project. At the same time, the company also carried out a site development project in previous years and has relevant experience in the construction works. In the selection of the contractor, reliability, reference and professional experience are criteria. One activity will be carried out under the project — Installation of a solar system for electricity generation in the grid. The 10-year warranty (product guarantee) predicts the durability of the elements of the system, and the 25-year performance guarantee of solar panels is also a guarantee of high technical standards. A reliable system contributes to reducing primary energy consumption and increasing the use of renewable energy sources and optimising the company’s production costs. (English) / rank | |||||||||||||||
Property / summary: Within the framework of the development, a simplified energy development will be carried out with the installation of a solar system with a power of 18 kWh. The technical parameters of the system can be described by: Installation of 60 Suntech STP 300-20/Wfh polycrystalline solar panels in 1 Fronius SYMO 20.0-3-M transformer-free three-phase network coupled with additional mounting materials The products to be installed are among the latest, most innovative technologies, smaller than the average products available on the market. The planned 60 Suntech solar modules STP 300-20/Wfh are installed next to the building, on the ground-mounted support structure, according to the module layout. The 60 solar panels shall be connected to 4 strings each containing 15 solar cells according to the modular allocation. It shall be connected to the inverter 2 input by the parallel binding of 2 strings. The modules are connected to the fire switch and then to the inverter with a solar wire of 6 mm². From the inverter, the system is connected to the grid via the solar panel distributor. The designed inverter is made by Fronius, SYMO 20.0-3-M, 3-phase, network regenerated. The inverter complies with all relevant standards requirements. It is possible to place it inside the building, next to the main tram distributor, mounted on the wall. The planned solar panel distribution includes: DC side per string: Overvoltage protection (T1-T2) on AC side: Overvoltage protection (T1-T2), overcurrent protection, main switch The following preparatory activities were carried out in the framework of the project: The company has contacted energetics. Subsequently, construction companies were contacted in order to map the market price and the available quality. The technical content of the development was determined taking into account the tenders, technical content and prices received. In the framework of the project, costs will only be declared in connection with the installation of the solar system. The construction process includes the following activities: At the same time as the contract is concluded, the service provider’s administration (application notification) and the connection documentation are submitted. Implementation. Once reported to the supplier, the AD-VESZ meter is installed and the payroll is accounted for. Upon completion of the works, the contractor shall issue a final invoice. The company has already successfully implemented an internship application using EU funding. The company therefore has the appropriate knowledge of carrying out the administrative tasks related to the project. At the same time, the company also carried out a site development project in previous years and has relevant experience in the construction works. In the selection of the contractor, reliability, reference and professional experience are criteria. One activity will be carried out under the project — Installation of a solar system for electricity generation in the grid. The 10-year warranty (product guarantee) predicts the durability of the elements of the system, and the 25-year performance guarantee of solar panels is also a guarantee of high technical standards. A reliable system contributes to reducing primary energy consumption and increasing the use of renewable energy sources and optimising the company’s production costs. (English) / qualifier | |||||||||||||||
|
Revision as of 21:56, 8 February 2022
Project Q3935777 in Hungary
Language | Label | Description | Also known as |
---|---|---|---|
English | Installation of solar panels at Castrum Ferreum Ltd. in Szombathely |
Project Q3935777 in Hungary |
Statements
5,500,000 forint
0 references
10,000,000.0 forint
0 references
55.0 percent
0 references
1 January 2021
0 references
30 September 2022
0 references
CASTRUM FERREUM Műszaki Szolgáltató és Kereskedelmi Korlátolt Felelősségű Társaság
0 references
A fejlesztés keretében egyszerűsített energetika fejlesztés megvalósítására kerül sor, 18 kWh teljesítményű napelemes rendszer telepítésével. A rendszer műszaki paraméterei az alábbiakkal mutathatók be: 60 darab SUNTECH STP 300-20/Wfh polikristályos napelem telepítése 1 db Fronius Symo 20.0-3-M transzformátormentes háromfázisú hálózatba tápláló inverter hozzá tartozó kiegészítő szerelési anyagokkal együtt A beépítésre kerülő termékek a legújabb, leginnovatívabb technológiák közé tartoznak, mérete kisebb a piacon elérhető átlagos termékekhez képest. A tervezett 60 db Suntech gyártmányú, STP 300-20/Wfh típusú napelem modul az épület mellé, földre telepített tartószerkezetre, a modulkiosztás szerint kerül telepítésre. A 60 db napelemet a modulkiosztás szerint 4 db, egyenként 15 db napelemet tartalmazó sztringbe kell kötni. 2-2 sztring párhuzamos kötésével az inverter 2 bemenetére kell csatlakoztatni. A modulok 6mm2 keresztmetszetű szolár vezetékkel kerülnek bekötésre a tűzeseti kapcsolóba, majd az inverterbe. Az inverterből a napelem elosztón keresztül csatlakozik a rendszer a hálózatra. A tervezett inverter Fronius gyártmányú, Symo 20.0-3-M típusú, 3 fázisú, hálózati visszatáplálású. Az inverter megfelel valamennyi vonatkozó szabványelvárásnak. Elhelyezése épületen belül, a villamos főelosztó mellett, falra szerelve lehetséges. A tervezett napelem elosztó tartalmazza: DC oldalon sztringenként: Túlfeszültség védelem (T1-T2) AC oldalon: Túlfeszültség védelem (T1-T2), túláram védelem, főkapcsoló A projekt keretében az alábbi előkészítő tevékenységek megvalósítására került sor: A vállalkozás felvette a kapcsolatot energetikussal. Ezt követően került sor kivitelező vállalkozások megkeresésére a piaci ár valamint elérhető minőségek feltérképezése tekintetében. A beérkezett ajánlatok, műszaki tartalom, árak figyelembe vételével került sor a fejlesztés műszaki tartalmának meghatározására. A projekt keretében csak a napelemes rendszer telepítésével kapcsolatban kerül költség elszámolásra. A kivitelezés menete az alábbi tevékenységeket tartalmazza: A vállalkozói szerződés megkötésével egyidőben megtörténik a szolgáltatói ügyintézés (igénybejelentés) valamint a csatlakozási dokumentáció benyújtása. Megvalósítás. A szolgáltató felé történő készre jelentés után kerül sor az AD-VESZ fogyasztásmérő felszerelésére és a szaldó elszámolásra. A kivitelezés lezárultával a vállalkozó végszámlát állít ki. A vállalkozás korábban már valósított meg sikeresen, EU támogatás felhasználásával, gyakornoki pályázatot. A vállalkozás a projekthez kapcsolódó adminisztratív feladatok elvégzését illetően így megfelelő ismeretekkel rendelkezik. Ugyanakkor a korábbi években telephely fejlesztési projektet is megvalósított a cég, releváns tapasztalattal bír a kivitelezési munkák tekintetében is. A kivitelező kiválasztásánál pedig szempont a megbízhatóság, referencia felmutatása, szakmai tapasztalat megléte. A projekt keretében egy tevékenység megvalósítására kerül sor - Napelemes rendszer telepítése hálózati villamosenergia-termelés céljából. A 10 éves jótállás (termékgarancia) előrevetíti a rendszer elemeinek tartósságát, továbbá a napelemek 25 éves teljesítménygaranciája is biztosíték a magas technikai színvonalra. A megbízható rendszer hozzájárul a primer energiafelhasználás csökkenéséhez valamint a megújuló energiaforrás-felhasználás növeléséhez, a vállalkozás termelési költségeinek optimalizálásához. (Hungarian)
0 references
Szombathely, Vas
0 references
Identifiers
GINOP-4.1.4-19-2020-02960
0 references