Energy modernisation in the Homló Sports Centre and Running Corridor building (Q3950734): Difference between revisions

From EU Knowledge Graph
Jump to navigation Jump to search
(‎Changed an Item: add summary)
(‎Changed an Item: Adding English translations)
Property / summary
 
a) the aim of the project is to upgrade 2 buildings in Komló — running corridor and sports center b) the content of the project is self-contained. — Complete facade thermal insulation of buildings owned by municipalities (2 buildings), complete replacement of doors and windows in accordance with the requirements of Decree No 7/2006 of 24 May 2006 of the Minister for National Development — Installation of a solar panel system in 2 buildings Optional, not supported independently: — Replacement of fossil fuel-based heat generating equipment: heating modernisation and biomass boiler system Compulsory non-eligible action. — accessibility: project-proportional accessibility for 2 buildings — asbestos removal: not relevant — publicity: based on the Beneficiary’s information obligations — training: technical handover-take-over will be a prerequisite for training by an energetic expert. — local protection: not relevant c) Point 3.4.1.1 (1) Buildings forming an independent energy system (complex investment) 2) The project is based on an energy-oriented survey and calculation. 3) Buildings have the following function: h) Public, non-professional sports facilities 4) NR 5) The design values comply with the current TNM Decree and the requirements of the Call, there is a valid energy certificate in accordance with Government Decree 6) NR 7) 176/2008 (VI.30.) 8) Building energy screening is attached. 9) Building energy screening 266/2013. 10) NR 11-15) monumental or local protection: Nr 16) NR 17) Proportional accessibility of the project is done 18) NR 19) Publicity is provided on the basis of the “Information obligations of beneficiaries” 20) met 21) Project Plan is attached 22) for the total investment the cost of the technical inspector of the BMR -4 % above 23) NR 24) is planned 25) the project will reduce the national GHG emissions in absolute terms (235.08 CO2 reduction) 26) the condition is met 27) the energy certificate will be prepared even after implementation. 28) the additional costs resulting from changes in the legislative environment shall be borne by the developer. 29) invertren measurement can be achieved 30) weather tracking regulations will be built where relevant 31) weekly time programming will be ensured 32) connection to the system will be possible 33-35) the conditions will be met — costs planned for training are planned 36) the equipment to be procured will be met until the maintenance period 37) the assets to be procured are at least A+ energy grade 38) NR 39-50) the technical content corresponds to these points. 51-63) NR Call 3.4.1.2 (1) we comply with environmental and equal opportunities legislation applicable to the project, preserve the protected natural and cultural values in the area covered by the project, (2) the Municipality expresses a sense of opportunity: does not mediate segregation, reduces existing prejudices for groups 3) the project has no foreseeable climate risk 4) NR 5) we attached a negative statement 6) in the design we took into account the principles of universal design 7) project proportional accessibility takes place 8) Infocommunication accessibility happens 9) HEP is attached 10) Local Equal Opportunities Plan is attached d) Content assessment criteria 1.1 The project fits the National Energy Strategy 2030 and Hungary II. 1.2 The investment contributes to the reduction of primary energy consumption and GHG emissions 1.3 The buildings concerned are 100 % municipally owned 1.4 the buildings concerned do not contain scattered asbestos, the project-proportional accessibility is part of the project 2.2 The running corridor is met 2.3 the design of interventions technology adopts a neutral approach 3.2 The buildings concerned have an initial energy certificate presenting an energy certificate. Building energy screening is attached 3.3 The subject of the grant application and the subject of the grant application does not fall under the specified exclusion grounds 3.4 The applicant undertakes to comply with the requirements set out in points 3.4 and 3.6 of the Call 4.1 The timetable for implementation and the presentation of the pre- and post-development status are realistic 4.2-3 relevant declarations are attached 5.1 local protection, monuments: non-relevant running corridor 7.1: nearly zero level, sports center: cost-optimised target 10.1-8 the conditions met 11.1 is met for both buildings e) area-specific criteria 1.1. The project fits into the following objectives of the Integrated Territorial Programme of Baranya County: 5. Sustainable use of strategic resources, 6. Improving accessibility and mobility, 7. Becoming a major region node 1.2. 235.08 t CO2 emission reduction/year 2.1 NR 3.2 62.5 kWp installation of solar panel 4.1 3-5 people with fewer opportunities (English)
Property / summary: a) the aim of the project is to upgrade 2 buildings in Komló — running corridor and sports center b) the content of the project is self-contained. — Complete facade thermal insulation of buildings owned by municipalities (2 buildings), complete replacement of doors and windows in accordance with the requirements of Decree No 7/2006 of 24 May 2006 of the Minister for National Development — Installation of a solar panel system in 2 buildings Optional, not supported independently: — Replacement of fossil fuel-based heat generating equipment: heating modernisation and biomass boiler system Compulsory non-eligible action. — accessibility: project-proportional accessibility for 2 buildings — asbestos removal: not relevant — publicity: based on the Beneficiary’s information obligations — training: technical handover-take-over will be a prerequisite for training by an energetic expert. — local protection: not relevant c) Point 3.4.1.1 (1) Buildings forming an independent energy system (complex investment) 2) The project is based on an energy-oriented survey and calculation. 3) Buildings have the following function: h) Public, non-professional sports facilities 4) NR 5) The design values comply with the current TNM Decree and the requirements of the Call, there is a valid energy certificate in accordance with Government Decree 6) NR 7) 176/2008 (VI.30.) 8) Building energy screening is attached. 9) Building energy screening 266/2013. 10) NR 11-15) monumental or local protection: Nr 16) NR 17) Proportional accessibility of the project is done 18) NR 19) Publicity is provided on the basis of the “Information obligations of beneficiaries” 20) met 21) Project Plan is attached 22) for the total investment the cost of the technical inspector of the BMR -4 % above 23) NR 24) is planned 25) the project will reduce the national GHG emissions in absolute terms (235.08 CO2 reduction) 26) the condition is met 27) the energy certificate will be prepared even after implementation. 28) the additional costs resulting from changes in the legislative environment shall be borne by the developer. 29) invertren measurement can be achieved 30) weather tracking regulations will be built where relevant 31) weekly time programming will be ensured 32) connection to the system will be possible 33-35) the conditions will be met — costs planned for training are planned 36) the equipment to be procured will be met until the maintenance period 37) the assets to be procured are at least A+ energy grade 38) NR 39-50) the technical content corresponds to these points. 51-63) NR Call 3.4.1.2 (1) we comply with environmental and equal opportunities legislation applicable to the project, preserve the protected natural and cultural values in the area covered by the project, (2) the Municipality expresses a sense of opportunity: does not mediate segregation, reduces existing prejudices for groups 3) the project has no foreseeable climate risk 4) NR 5) we attached a negative statement 6) in the design we took into account the principles of universal design 7) project proportional accessibility takes place 8) Infocommunication accessibility happens 9) HEP is attached 10) Local Equal Opportunities Plan is attached d) Content assessment criteria 1.1 The project fits the National Energy Strategy 2030 and Hungary II. 1.2 The investment contributes to the reduction of primary energy consumption and GHG emissions 1.3 The buildings concerned are 100 % municipally owned 1.4 the buildings concerned do not contain scattered asbestos, the project-proportional accessibility is part of the project 2.2 The running corridor is met 2.3 the design of interventions technology adopts a neutral approach 3.2 The buildings concerned have an initial energy certificate presenting an energy certificate. Building energy screening is attached 3.3 The subject of the grant application and the subject of the grant application does not fall under the specified exclusion grounds 3.4 The applicant undertakes to comply with the requirements set out in points 3.4 and 3.6 of the Call 4.1 The timetable for implementation and the presentation of the pre- and post-development status are realistic 4.2-3 relevant declarations are attached 5.1 local protection, monuments: non-relevant running corridor 7.1: nearly zero level, sports center: cost-optimised target 10.1-8 the conditions met 11.1 is met for both buildings e) area-specific criteria 1.1. The project fits into the following objectives of the Integrated Territorial Programme of Baranya County: 5. Sustainable use of strategic resources, 6. Improving accessibility and mobility, 7. Becoming a major region node 1.2. 235.08 t CO2 emission reduction/year 2.1 NR 3.2 62.5 kWp installation of solar panel 4.1 3-5 people with fewer opportunities (English) / rank
 
Normal rank
Property / summary: a) the aim of the project is to upgrade 2 buildings in Komló — running corridor and sports center b) the content of the project is self-contained. — Complete facade thermal insulation of buildings owned by municipalities (2 buildings), complete replacement of doors and windows in accordance with the requirements of Decree No 7/2006 of 24 May 2006 of the Minister for National Development — Installation of a solar panel system in 2 buildings Optional, not supported independently: — Replacement of fossil fuel-based heat generating equipment: heating modernisation and biomass boiler system Compulsory non-eligible action. — accessibility: project-proportional accessibility for 2 buildings — asbestos removal: not relevant — publicity: based on the Beneficiary’s information obligations — training: technical handover-take-over will be a prerequisite for training by an energetic expert. — local protection: not relevant c) Point 3.4.1.1 (1) Buildings forming an independent energy system (complex investment) 2) The project is based on an energy-oriented survey and calculation. 3) Buildings have the following function: h) Public, non-professional sports facilities 4) NR 5) The design values comply with the current TNM Decree and the requirements of the Call, there is a valid energy certificate in accordance with Government Decree 6) NR 7) 176/2008 (VI.30.) 8) Building energy screening is attached. 9) Building energy screening 266/2013. 10) NR 11-15) monumental or local protection: Nr 16) NR 17) Proportional accessibility of the project is done 18) NR 19) Publicity is provided on the basis of the “Information obligations of beneficiaries” 20) met 21) Project Plan is attached 22) for the total investment the cost of the technical inspector of the BMR -4 % above 23) NR 24) is planned 25) the project will reduce the national GHG emissions in absolute terms (235.08 CO2 reduction) 26) the condition is met 27) the energy certificate will be prepared even after implementation. 28) the additional costs resulting from changes in the legislative environment shall be borne by the developer. 29) invertren measurement can be achieved 30) weather tracking regulations will be built where relevant 31) weekly time programming will be ensured 32) connection to the system will be possible 33-35) the conditions will be met — costs planned for training are planned 36) the equipment to be procured will be met until the maintenance period 37) the assets to be procured are at least A+ energy grade 38) NR 39-50) the technical content corresponds to these points. 51-63) NR Call 3.4.1.2 (1) we comply with environmental and equal opportunities legislation applicable to the project, preserve the protected natural and cultural values in the area covered by the project, (2) the Municipality expresses a sense of opportunity: does not mediate segregation, reduces existing prejudices for groups 3) the project has no foreseeable climate risk 4) NR 5) we attached a negative statement 6) in the design we took into account the principles of universal design 7) project proportional accessibility takes place 8) Infocommunication accessibility happens 9) HEP is attached 10) Local Equal Opportunities Plan is attached d) Content assessment criteria 1.1 The project fits the National Energy Strategy 2030 and Hungary II. 1.2 The investment contributes to the reduction of primary energy consumption and GHG emissions 1.3 The buildings concerned are 100 % municipally owned 1.4 the buildings concerned do not contain scattered asbestos, the project-proportional accessibility is part of the project 2.2 The running corridor is met 2.3 the design of interventions technology adopts a neutral approach 3.2 The buildings concerned have an initial energy certificate presenting an energy certificate. Building energy screening is attached 3.3 The subject of the grant application and the subject of the grant application does not fall under the specified exclusion grounds 3.4 The applicant undertakes to comply with the requirements set out in points 3.4 and 3.6 of the Call 4.1 The timetable for implementation and the presentation of the pre- and post-development status are realistic 4.2-3 relevant declarations are attached 5.1 local protection, monuments: non-relevant running corridor 7.1: nearly zero level, sports center: cost-optimised target 10.1-8 the conditions met 11.1 is met for both buildings e) area-specific criteria 1.1. The project fits into the following objectives of the Integrated Territorial Programme of Baranya County: 5. Sustainable use of strategic resources, 6. Improving accessibility and mobility, 7. Becoming a major region node 1.2. 235.08 t CO2 emission reduction/year 2.1 NR 3.2 62.5 kWp installation of solar panel 4.1 3-5 people with fewer opportunities (English) / qualifier
 
point in time: 9 February 2022
Timestamp+2022-02-09T00:00:00Z
Timezone+00:00
CalendarGregorian
Precision1 day
Before0
After0

Revision as of 11:46, 9 February 2022

Project Q3950734 in Hungary
Language Label Description Also known as
English
Energy modernisation in the Homló Sports Centre and Running Corridor building
Project Q3950734 in Hungary

    Statements

    0 references
    0 references
    162,828,184 forint
    0 references
    450,254.12 Euro
    0.00276521 Euro
    6 December 2021
    0 references
    523,660.344 Euro
    0.0027336256 Euro
    15 December 2021
    0 references
    191,562,569.412 forint
    0 references
    84.999999 percent
    0 references
    1 July 2019
    0 references
    28 September 2021
    0 references
    KOMLÓ VÁROS ÖNKORMÁNYZAT
    0 references
    0 references

    46°11'28.21"N, 18°15'40.97"E
    0 references
    a) projekt célja 2 db épület energetikai korszerűsítése Komlón – futófolyosó és sportközpont b) a projekt tartalma Önállóan tám.tev. - Önkormányzati tulajdonú épületek (2 db épület) teljes körű homlokzati hőszigetelése, nyílászáró szerkezetek teljes cseréje a 7/2006 (V. 24.) TNM rendelet követelményeknek megfelelően - Napelemes rendszer telepítése 2épületen Választható, önállóan nem tám. tev.: - Fosszilis energiahordozó alapú hőtermelő berendezések cseréje: fűtéskorszerűsítés és biomassza kazánrendszer Kötelezően megvalósítandó, önállóan nem támogatható tev. - akadálymentesítés: projektarányos akadálymentesítés 2 db épület esetén - azbesztmentesítés: nem releváns - nyilvánosság biztosítása: a „Kedvezményezettek tájékoztatási kötelezettségei” alapján történik - képzés: a műszaki átadás-átvétel előfeltétele lesz a képzés megtartása energetikus szakértő által. - helyi védettség: nem releváns c) Felhívás 3.4.1.1 pontja 1) Önálló energetikai rendszert alkotó épületek (összetett beruházás) 2) A projekt energetikai központú felmérésen és számításon alapszik. 3) Az épületek az alábbi funkciót látják el: h) Közcélú, nem professzionális sporthoz kötődő sportlétesítmények 4) NR 5) A tervezési értékek megfelelnek a hatályos TNM rendeletnek és a Felhívás követelményeinek, létezik a kiinduló állapotot bemutató energetikai tanúsítvány 6) NR 7) 176/2008 (VI.30.) Kormányrendelet szerinti Hiteles energetikai tanúsítvány készült. 8) Épületenergetikai átvilágítást csatoljuk. 9) az épületenergetikai átvilágítást 266/2013. (VII.11.) Korm. rendelet szerinti műszaki szakértő készítette 10) NR 11-15) műemléki vagy helyi védelem: NR 16) NR 17) projektarányos akadálymentesítés történik 18) NR 19) Nyilvánosság biztosítása a „Kedvezményezettek tájékoztatási kötelezettségei” alapján történik 20) teljesül 21) Projekt Tervet csatoljuk 22) a teljes beruházásra vonatkozóan a BMR -4 % feletti 23) NR 24) szakirányú műszaki ellenőr költsége betervezésre került 25) a projekt abszolút mértékben csökkenti az országos ÜHG kibocsátást (235,08 CO2 csökkenés) 26) a feltétel teljesül 27) energetikai tanúsítvány készül a megvalósítást követően is. 28) a jogszabályi környezet változásából fakadó többletköltségeket a projektgazda állja. 29) inverteren mérés megvalósítható 30) időjárás-követő szabályozás épül be ahol releváns 31) heti időprogramozás biztosított lesz 32) rendszerhez való kapcsolódásra lehetőség lesz 33-35) a feltételek teljesülnek – képzésre fordítandó költség betervezésre került 36) a fenntartási időszakba lépésig teljesül 37) a beszerzendő eszközök legalább A+ energia besorolásúak 38) NR 39-50) a műszaki tartalom megfelel ezen pontoknak. 51-63) NR Felhívás 3.4.1.2 pontja 1) a projektre vonatkozó környezetvédelmi és esélyegyenlőségi jogszabályokat betartjuk, a projekt által érintett területen a védett természeti és kulturális értékeket megőrizzük, 2) az Önkormányzat esélytudatosságot fejez ki: nem közvetít szegregációt, csökkenti a csoportokra vonatkozó meglévő előítéleteket 3) a projektnek nincs előre látható klímakockázata 4) NR 5) nemleges nyilatkozatot csatoltuk 6) a tervezésnél figyelembe vettük az egyetemes tervezés elveit 7) projektarányos akadálymentesítés történik 8) infokommunikációs akadálymentesítés történik 9) HEP-et csatoljuk 10) Helyi Esélyegyenlőségi Tervet csatoljuk d) tartalmi értékelési szempontok 1.1 A projekt illeszkedik a Nemzeti Energiastratégia 2030 és a Magyarország II. Nemzeti Energiahatékonysági Cselekvési Tervhez 1.2 a beruházás hozzájárul a primerenergia-fogyasztás és az ÜHG-kibocsátás csökkenéséhez 1.3 az érintett épületek 100%-ig önkormányzati tulajdonban vannak 1.4 az érintett épületek nem tartalmaznak szórt azbesztet, projektarányos akadálymentesítés a projekt részét képezi 2.2 A futófolyosóra teljesül 2.3 a beavatkozások tervezése technológia semleges megközelítést alkalmaz 3.2 Az érintett épületek rendelkeznek kiinduló állapotot bemutató energetikai tanúsítvánnyal. Épületenergetikai átvilágítást csatoljuk 3.3 A támogatást igénylő és a támogatási kérelem tárgya nem tartozik a meghatározott kizáró okok alá 3.4 A támogatást igénylő vállalja a Felhívás 3.4 és 3.6. pontjában meghatározott előírások teljesítését 4.1 A megvalósítás ütemterve valamint a fejlesztés előtti és utáni állapot bemutatása reális 4.2-3 releváns nyilatkozatokat csatoljuk 5.1 helyi védelem, műemlék: nem releváns 7.1. futófolyosó: közel nulla szint, sportközpont: költségoptimalizált a cél 10.1-8 a feltételek teljesülnek 11.1. teljesül mindkét épület esetén e) terület-specifikus szempontok 1.1. A projekt illeszkedik a Baranya Megyei Integrált Területi Program alábbi céljaihoz: 5. Stratégiai erőforrások fenntartható használata, 6. Elérhetőség és mobilitás javítása, 7. Nagytérségi csomóponttá válás 1.2. 235,08 t CO2 kibocsátás csökkenés/év 2.1 NR 3.2 62,5 kWp teljesítményű napelem telepítése valósul meg 4.1 3-5 fő hátrányos helyzetű lakos bevonása (Hungarian)
    0 references
    a) the aim of the project is to upgrade 2 buildings in Komló — running corridor and sports center b) the content of the project is self-contained. — Complete facade thermal insulation of buildings owned by municipalities (2 buildings), complete replacement of doors and windows in accordance with the requirements of Decree No 7/2006 of 24 May 2006 of the Minister for National Development — Installation of a solar panel system in 2 buildings Optional, not supported independently: — Replacement of fossil fuel-based heat generating equipment: heating modernisation and biomass boiler system Compulsory non-eligible action. — accessibility: project-proportional accessibility for 2 buildings — asbestos removal: not relevant — publicity: based on the Beneficiary’s information obligations — training: technical handover-take-over will be a prerequisite for training by an energetic expert. — local protection: not relevant c) Point 3.4.1.1 (1) Buildings forming an independent energy system (complex investment) 2) The project is based on an energy-oriented survey and calculation. 3) Buildings have the following function: h) Public, non-professional sports facilities 4) NR 5) The design values comply with the current TNM Decree and the requirements of the Call, there is a valid energy certificate in accordance with Government Decree 6) NR 7) 176/2008 (VI.30.) 8) Building energy screening is attached. 9) Building energy screening 266/2013. 10) NR 11-15) monumental or local protection: Nr 16) NR 17) Proportional accessibility of the project is done 18) NR 19) Publicity is provided on the basis of the “Information obligations of beneficiaries” 20) met 21) Project Plan is attached 22) for the total investment the cost of the technical inspector of the BMR -4 % above 23) NR 24) is planned 25) the project will reduce the national GHG emissions in absolute terms (235.08 CO2 reduction) 26) the condition is met 27) the energy certificate will be prepared even after implementation. 28) the additional costs resulting from changes in the legislative environment shall be borne by the developer. 29) invertren measurement can be achieved 30) weather tracking regulations will be built where relevant 31) weekly time programming will be ensured 32) connection to the system will be possible 33-35) the conditions will be met — costs planned for training are planned 36) the equipment to be procured will be met until the maintenance period 37) the assets to be procured are at least A+ energy grade 38) NR 39-50) the technical content corresponds to these points. 51-63) NR Call 3.4.1.2 (1) we comply with environmental and equal opportunities legislation applicable to the project, preserve the protected natural and cultural values in the area covered by the project, (2) the Municipality expresses a sense of opportunity: does not mediate segregation, reduces existing prejudices for groups 3) the project has no foreseeable climate risk 4) NR 5) we attached a negative statement 6) in the design we took into account the principles of universal design 7) project proportional accessibility takes place 8) Infocommunication accessibility happens 9) HEP is attached 10) Local Equal Opportunities Plan is attached d) Content assessment criteria 1.1 The project fits the National Energy Strategy 2030 and Hungary II. 1.2 The investment contributes to the reduction of primary energy consumption and GHG emissions 1.3 The buildings concerned are 100 % municipally owned 1.4 the buildings concerned do not contain scattered asbestos, the project-proportional accessibility is part of the project 2.2 The running corridor is met 2.3 the design of interventions technology adopts a neutral approach 3.2 The buildings concerned have an initial energy certificate presenting an energy certificate. Building energy screening is attached 3.3 The subject of the grant application and the subject of the grant application does not fall under the specified exclusion grounds 3.4 The applicant undertakes to comply with the requirements set out in points 3.4 and 3.6 of the Call 4.1 The timetable for implementation and the presentation of the pre- and post-development status are realistic 4.2-3 relevant declarations are attached 5.1 local protection, monuments: non-relevant running corridor 7.1: nearly zero level, sports center: cost-optimised target 10.1-8 the conditions met 11.1 is met for both buildings e) area-specific criteria 1.1. The project fits into the following objectives of the Integrated Territorial Programme of Baranya County: 5. Sustainable use of strategic resources, 6. Improving accessibility and mobility, 7. Becoming a major region node 1.2. 235.08 t CO2 emission reduction/year 2.1 NR 3.2 62.5 kWp installation of solar panel 4.1 3-5 people with fewer opportunities (English)
    9 February 2022
    0 references
    Komló, Baranya
    0 references

    Identifiers

    TOP-3.2.1-16-BA1-2018-00056
    0 references