Energy renovation of the building of the Mayor’s office (Q3950425): Difference between revisions

From EU Knowledge Graph
Jump to navigation Jump to search
(‎Changed an Item: add summary)
(‎Changed an Item: Adding English translations)
Property / summary
 
The purpose of the present project is to operate the Mayor’s Office in Egyházasgerge in an energy-efficient and efficient way, to reduce operating costs and greenhouse gas emissions through the renovation and development of the building for energy efficiency, using renewable energy sources, which have arisen from both the local government and the inhabitants of the municipality. Through the energy development of the building, the municipality can ensure in the long term access to economical and high-quality public education that meets the current standards in all respects for the inhabitants of the village of Egyházasgerge. The project will be implemented by the Municipality of Churchesgerge as the Main Applicant in a consortium with the Nógrád County Local Government Office. On the basis of the consortium agreement between the two organisations, the project management tasks are carried out by the Nógrád County Local Government Office. The energy development of the one-storey building hosting the mayor’s office in 3185 Churchesgerge Main Road 30 is justified. The building was built in 1986. The thermal insulation of the facade and closing slab and partial replacement of facade doors are planned. Designed for building condensation gas boiler, radiator heating, thermostatic radiator valves design. Once the project has been completed, the energy modernisation of the facility will result in a reduction of the operating and maintenance costs, which will not only save costs for the keeper, but also benefit from a reduced use of energy carriers from an environmental point of view. Total cost of the project: 14 749 700 HUF Implementation period: 16 months 3.1.1 Self-eligible activities (a) Energy efficiency-oriented development of municipal buildings, modernisation of their external boundaries 3.1.2 Optional activities that are not self-eligible (a) Installation of heat pump systems and linking to heat transmission systems 3.1.3 Non-self-eligible, mandatory activities (a) Accessibility b) Accessibility c) Providing publicity d) Developing training material, holding training e) Preserving historic or locally protected value (English)
Property / summary: The purpose of the present project is to operate the Mayor’s Office in Egyházasgerge in an energy-efficient and efficient way, to reduce operating costs and greenhouse gas emissions through the renovation and development of the building for energy efficiency, using renewable energy sources, which have arisen from both the local government and the inhabitants of the municipality. Through the energy development of the building, the municipality can ensure in the long term access to economical and high-quality public education that meets the current standards in all respects for the inhabitants of the village of Egyházasgerge. The project will be implemented by the Municipality of Churchesgerge as the Main Applicant in a consortium with the Nógrád County Local Government Office. On the basis of the consortium agreement between the two organisations, the project management tasks are carried out by the Nógrád County Local Government Office. The energy development of the one-storey building hosting the mayor’s office in 3185 Churchesgerge Main Road 30 is justified. The building was built in 1986. The thermal insulation of the facade and closing slab and partial replacement of facade doors are planned. Designed for building condensation gas boiler, radiator heating, thermostatic radiator valves design. Once the project has been completed, the energy modernisation of the facility will result in a reduction of the operating and maintenance costs, which will not only save costs for the keeper, but also benefit from a reduced use of energy carriers from an environmental point of view. Total cost of the project: 14 749 700 HUF Implementation period: 16 months 3.1.1 Self-eligible activities (a) Energy efficiency-oriented development of municipal buildings, modernisation of their external boundaries 3.1.2 Optional activities that are not self-eligible (a) Installation of heat pump systems and linking to heat transmission systems 3.1.3 Non-self-eligible, mandatory activities (a) Accessibility b) Accessibility c) Providing publicity d) Developing training material, holding training e) Preserving historic or locally protected value (English) / rank
 
Normal rank
Property / summary: The purpose of the present project is to operate the Mayor’s Office in Egyházasgerge in an energy-efficient and efficient way, to reduce operating costs and greenhouse gas emissions through the renovation and development of the building for energy efficiency, using renewable energy sources, which have arisen from both the local government and the inhabitants of the municipality. Through the energy development of the building, the municipality can ensure in the long term access to economical and high-quality public education that meets the current standards in all respects for the inhabitants of the village of Egyházasgerge. The project will be implemented by the Municipality of Churchesgerge as the Main Applicant in a consortium with the Nógrád County Local Government Office. On the basis of the consortium agreement between the two organisations, the project management tasks are carried out by the Nógrád County Local Government Office. The energy development of the one-storey building hosting the mayor’s office in 3185 Churchesgerge Main Road 30 is justified. The building was built in 1986. The thermal insulation of the facade and closing slab and partial replacement of facade doors are planned. Designed for building condensation gas boiler, radiator heating, thermostatic radiator valves design. Once the project has been completed, the energy modernisation of the facility will result in a reduction of the operating and maintenance costs, which will not only save costs for the keeper, but also benefit from a reduced use of energy carriers from an environmental point of view. Total cost of the project: 14 749 700 HUF Implementation period: 16 months 3.1.1 Self-eligible activities (a) Energy efficiency-oriented development of municipal buildings, modernisation of their external boundaries 3.1.2 Optional activities that are not self-eligible (a) Installation of heat pump systems and linking to heat transmission systems 3.1.3 Non-self-eligible, mandatory activities (a) Accessibility b) Accessibility c) Providing publicity d) Developing training material, holding training e) Preserving historic or locally protected value (English) / qualifier
 
point in time: 9 February 2022
Timestamp+2022-02-09T00:00:00Z
Timezone+00:00
CalendarGregorian
Precision1 day
Before0
After0

Revision as of 12:08, 9 February 2022

Project Q3950425 in Hungary
Language Label Description Also known as
English
Energy renovation of the building of the Mayor’s office
Project Q3950425 in Hungary

    Statements

    0 references
    14,749,700 forint
    0 references
    40,786.02 Euro
    0.00276521 Euro
    6 December 2021
    0 references
    47,435.479 Euro
    0.0027336256 Euro
    15 December 2021
    0 references
    17,352,588.235 forint
    0 references
    84.99998 percent
    0 references
    1 March 2017
    0 references
    4 February 2020
    0 references
    EGYHÁZASGERGE KÖZSÉG ÖNKORMÁNYZATA
    0 references
    Q3978395 (Deleted Item)
    0 references

    48°11'25.12"N, 19°39'38.05"E
    0 references
    Jelen projekt célja a Egyházasgergei polgármesteri hivatal energiahatékony és takarékos működtetése, a működési költségek és az üvegházhatású gázok kibocsátásának csökkentése az épület energiahatékonyságot célzó felújítása és fejlesztése által, megújuló energiaforrás használatával, mely szükséglet és igény mind a helyi önkormányzat, mind a település lakossága részéről felmerült. Az épület energetikai fejlesztésével az önkormányzat hosszú távon tudja biztosítani a gazdaságos és a jelenlegi előírásoknak minden tekintetben megfelelő, jó minőségű közoktatáshoz való hozzáférést Egyházasgerge település lakosai részére. A projektet Egyházasgerge Község Önkormányzata, mint Főpályázó a Nógrád Megyei Önkormányzati Hivatallal konzorciumban valósítja meg. A két szervezet közötti konzorciumi megállapodás alapján a projekt projektmenedzsment feladatait a Nógrád Megyei Önkormányzati Hivatal végzi. A 3185 Egyházasgerge Fő út 30 sz. alatt található az Egyházasgergei polgármesteri hivatalnak helyt adó egyszintes épület energetikai fejlesztése indokolt. Az épület1986-ban épült. Tervezés tárgyát képezi a homlokzati valamint zárófödém hőszigetelése, valamint a homlokzati nyílászárók részleges cseréje. Tervezett az épület kondenzációs gázkazán, radiátoros fűtés, termosztatikus radiátor szelepek kialakítása. A projekt megvalósulását követően a létesítmény energetikai korszerűsítése az üzemeltetési, fenntartási költségek csökkenését fogja eredményezni, amely nemcsak a fenntartónak jelent költségmegtakarítást, de a lecsökkenő energiahordozó felhasználás környezetvédelmi szempontból is előnyös. A projekt összköltsége: 14.749.700 Ft Megvalósítási időtartam: 16 hónap 3.1.1 Önállóan támogatható tevékenységek a) Önkormányzati tulajdonú épületek energiahatékonyság-központú fejlesztése, külső határoló szerkezeteik korszerűsítése által 3.1.2 Önállóan nem támogatható, választható tevékenységek a) Hőszivattyú rendszerek telepítése és hőközlő rendszerre kötése 3.1.3 Önállóan nem támogatható, kötelezően megvalósítandó tevékenységek a) Akadálymentesítés b) Azbesztmentesítés c) Nyilvánosság biztosítása d) Képzési anyag kidolgozása, képzés tartása e) Műemléki vagy a helyi védettséget megalapozó érték megőrzése (Hungarian)
    0 references
    The purpose of the present project is to operate the Mayor’s Office in Egyházasgerge in an energy-efficient and efficient way, to reduce operating costs and greenhouse gas emissions through the renovation and development of the building for energy efficiency, using renewable energy sources, which have arisen from both the local government and the inhabitants of the municipality. Through the energy development of the building, the municipality can ensure in the long term access to economical and high-quality public education that meets the current standards in all respects for the inhabitants of the village of Egyházasgerge. The project will be implemented by the Municipality of Churchesgerge as the Main Applicant in a consortium with the Nógrád County Local Government Office. On the basis of the consortium agreement between the two organisations, the project management tasks are carried out by the Nógrád County Local Government Office. The energy development of the one-storey building hosting the mayor’s office in 3185 Churchesgerge Main Road 30 is justified. The building was built in 1986. The thermal insulation of the facade and closing slab and partial replacement of facade doors are planned. Designed for building condensation gas boiler, radiator heating, thermostatic radiator valves design. Once the project has been completed, the energy modernisation of the facility will result in a reduction of the operating and maintenance costs, which will not only save costs for the keeper, but also benefit from a reduced use of energy carriers from an environmental point of view. Total cost of the project: 14 749 700 HUF Implementation period: 16 months 3.1.1 Self-eligible activities (a) Energy efficiency-oriented development of municipal buildings, modernisation of their external boundaries 3.1.2 Optional activities that are not self-eligible (a) Installation of heat pump systems and linking to heat transmission systems 3.1.3 Non-self-eligible, mandatory activities (a) Accessibility b) Accessibility c) Providing publicity d) Developing training material, holding training e) Preserving historic or locally protected value (English)
    9 February 2022
    0 references
    Egyházasgerge, Nógrád
    0 references

    Identifiers

    TOP-3.2.1-15-NG1-2016-00036
    0 references