St. Borbála Home Building Energy Renovation in Komló (Q3949925): Difference between revisions

From EU Knowledge Graph
Jump to navigation Jump to search
(‎Changed an Item: add summary)
(‎Changed an Item: Adding English translations)
Property / summary
 
the objective of the project: Building energy modernisation of the Szent Borbála Home in Komló. b) the content of the project: Self-eligible activities: — Complete facade thermal insulation, flat roof thermal insulation and complete replacement of doors and windows are prepared in accordance with the requirements of Decree No 7/2006 of 24 May 2006 of the Minister for National Development — Photovoltaic system is established independently, optional activities: — Modernisation of heating and HMV systems related to fossil fuel-based heat generation equipment: replacement of radiators is not self-eligible, mandatory activities: — accessibility: project-proportional accessibility (accessible parking, ramp, toilet and windows) — asbestos removal: by removing wave shale — Publication: based on the Beneficiary’s information obligations — development of training materials and training: technical handover-take-over will be a prerequisite for training by an energetic expert. — preservation of locally protected values: not relevant (c) compliance with the conditions set out in point 3.2 of the call: 1) we comply with the environmental and equal opportunities legislation applicable to the project, we preserve the protected natural and cultural values in the area covered by the project, 2) The Municipality expresses a sense of opportunity: does not mediate segregation, reduces existing prejudices for groups, and does not exclude any social group of the project 3) Building forming an independent energy system 4) The project is based on an energy-centred survey and calculation 5) The project does not have a foreseeable climate risk 6) g) Home 7) Proportionalisation is not required 8) The planning values comply with the professional-technical regulations and the relevant requirements of the call, as laid down in the current Decree of the Minister for Transport, there is the initial energy certificate 9) non-relevant 10) the energy certificate under Government Decree 176/2008 (VI.30.) is being prepared 11) complex project (the building to be developed is considered as a building complex) 12) building energy screening carried out 13) lighting modernisation is not made 14-18) is not relevant, as no local protected or monument building is to be developed 19-23) see above 24) the Project Plan is attached 25) is not relevant, that -4 %<BMR<+ 4 % 26) non-relevant 27) technical inspector costs have been planned among the eligible costs of the project 28) the project reduces the national GHG emissions in absolute terms 29) the condition is met 30) an energy certificate will be prepared even after implementation. 31) the additional costs resulting from changes in the legislative environment shall be borne by the developer. 32) invertren measurement (available 33) weather tracking regulations will be included 34) weekly time programming will be ensured 35) connection to the system will be possible 36-38) the conditions will be met — the cost to be used for training is planned 39-41) the applicant obtains a statement of support from the county’s government no later than entering the maintenance period, that the project is in line with the objectives of the SEAP/SECAP strategy, the assets to be procured are at least A+ energy graded and lighting modernisation is not relevant. 42-53) the technical content contained in the investment corresponds to these points of the call. 54-64) not relevant (d) fulfilment of substantive assessment criteria: — The project fits the National Energy Strategy 2030 and Hungary II. The National Energy Efficiency Action Plan. — the investment contributes to the reduction of primary energy consumption and GHG emissions — the building concerned is 100 % owned by the municipality — the construction work in the project is subject to public procurement, and compliance with the relevant legal requirements will be ensured during its implementation — the project is not carried out in settlements below 10,000 people — the financial internal rate of return (BMR) for the entire investment is between -4 % and 4 %. — the specific limits have been complied with in all its activities. — The energy demand of a building before development exceeds 150 kWh/m2a. — The applicant undertakes to achieve the ‘nearly zero’ level defined in the Decree of the Minister for National Development. 1.1. The project is in line with Action 4 of Priority 5 of the Baranya County Regional Development Programme (generation and supply based on the use of local energy sources). The territorial focus of the measure is the whole territory of the county. 1.2. 5 points (decrease of CO2 over 30 t/year) 2.1 after non-relevant 3.1 development, the building will be rated BB 3.2 solar panel installation will be realised 4.1 undertakes to involve more than 5 disadvantaged residents in the project (English)
Property / summary: the objective of the project: Building energy modernisation of the Szent Borbála Home in Komló. b) the content of the project: Self-eligible activities: — Complete facade thermal insulation, flat roof thermal insulation and complete replacement of doors and windows are prepared in accordance with the requirements of Decree No 7/2006 of 24 May 2006 of the Minister for National Development — Photovoltaic system is established independently, optional activities: — Modernisation of heating and HMV systems related to fossil fuel-based heat generation equipment: replacement of radiators is not self-eligible, mandatory activities: — accessibility: project-proportional accessibility (accessible parking, ramp, toilet and windows) — asbestos removal: by removing wave shale — Publication: based on the Beneficiary’s information obligations — development of training materials and training: technical handover-take-over will be a prerequisite for training by an energetic expert. — preservation of locally protected values: not relevant (c) compliance with the conditions set out in point 3.2 of the call: 1) we comply with the environmental and equal opportunities legislation applicable to the project, we preserve the protected natural and cultural values in the area covered by the project, 2) The Municipality expresses a sense of opportunity: does not mediate segregation, reduces existing prejudices for groups, and does not exclude any social group of the project 3) Building forming an independent energy system 4) The project is based on an energy-centred survey and calculation 5) The project does not have a foreseeable climate risk 6) g) Home 7) Proportionalisation is not required 8) The planning values comply with the professional-technical regulations and the relevant requirements of the call, as laid down in the current Decree of the Minister for Transport, there is the initial energy certificate 9) non-relevant 10) the energy certificate under Government Decree 176/2008 (VI.30.) is being prepared 11) complex project (the building to be developed is considered as a building complex) 12) building energy screening carried out 13) lighting modernisation is not made 14-18) is not relevant, as no local protected or monument building is to be developed 19-23) see above 24) the Project Plan is attached 25) is not relevant, that -4 %<BMR<+ 4 % 26) non-relevant 27) technical inspector costs have been planned among the eligible costs of the project 28) the project reduces the national GHG emissions in absolute terms 29) the condition is met 30) an energy certificate will be prepared even after implementation. 31) the additional costs resulting from changes in the legislative environment shall be borne by the developer. 32) invertren measurement (available 33) weather tracking regulations will be included 34) weekly time programming will be ensured 35) connection to the system will be possible 36-38) the conditions will be met — the cost to be used for training is planned 39-41) the applicant obtains a statement of support from the county’s government no later than entering the maintenance period, that the project is in line with the objectives of the SEAP/SECAP strategy, the assets to be procured are at least A+ energy graded and lighting modernisation is not relevant. 42-53) the technical content contained in the investment corresponds to these points of the call. 54-64) not relevant (d) fulfilment of substantive assessment criteria: — The project fits the National Energy Strategy 2030 and Hungary II. The National Energy Efficiency Action Plan. — the investment contributes to the reduction of primary energy consumption and GHG emissions — the building concerned is 100 % owned by the municipality — the construction work in the project is subject to public procurement, and compliance with the relevant legal requirements will be ensured during its implementation — the project is not carried out in settlements below 10,000 people — the financial internal rate of return (BMR) for the entire investment is between -4 % and 4 %. — the specific limits have been complied with in all its activities. — The energy demand of a building before development exceeds 150 kWh/m2a. — The applicant undertakes to achieve the ‘nearly zero’ level defined in the Decree of the Minister for National Development. 1.1. The project is in line with Action 4 of Priority 5 of the Baranya County Regional Development Programme (generation and supply based on the use of local energy sources). The territorial focus of the measure is the whole territory of the county. 1.2. 5 points (decrease of CO2 over 30 t/year) 2.1 after non-relevant 3.1 development, the building will be rated BB 3.2 solar panel installation will be realised 4.1 undertakes to involve more than 5 disadvantaged residents in the project (English) / rank
 
Normal rank
Property / summary: the objective of the project: Building energy modernisation of the Szent Borbála Home in Komló. b) the content of the project: Self-eligible activities: — Complete facade thermal insulation, flat roof thermal insulation and complete replacement of doors and windows are prepared in accordance with the requirements of Decree No 7/2006 of 24 May 2006 of the Minister for National Development — Photovoltaic system is established independently, optional activities: — Modernisation of heating and HMV systems related to fossil fuel-based heat generation equipment: replacement of radiators is not self-eligible, mandatory activities: — accessibility: project-proportional accessibility (accessible parking, ramp, toilet and windows) — asbestos removal: by removing wave shale — Publication: based on the Beneficiary’s information obligations — development of training materials and training: technical handover-take-over will be a prerequisite for training by an energetic expert. — preservation of locally protected values: not relevant (c) compliance with the conditions set out in point 3.2 of the call: 1) we comply with the environmental and equal opportunities legislation applicable to the project, we preserve the protected natural and cultural values in the area covered by the project, 2) The Municipality expresses a sense of opportunity: does not mediate segregation, reduces existing prejudices for groups, and does not exclude any social group of the project 3) Building forming an independent energy system 4) The project is based on an energy-centred survey and calculation 5) The project does not have a foreseeable climate risk 6) g) Home 7) Proportionalisation is not required 8) The planning values comply with the professional-technical regulations and the relevant requirements of the call, as laid down in the current Decree of the Minister for Transport, there is the initial energy certificate 9) non-relevant 10) the energy certificate under Government Decree 176/2008 (VI.30.) is being prepared 11) complex project (the building to be developed is considered as a building complex) 12) building energy screening carried out 13) lighting modernisation is not made 14-18) is not relevant, as no local protected or monument building is to be developed 19-23) see above 24) the Project Plan is attached 25) is not relevant, that -4 %<BMR<+ 4 % 26) non-relevant 27) technical inspector costs have been planned among the eligible costs of the project 28) the project reduces the national GHG emissions in absolute terms 29) the condition is met 30) an energy certificate will be prepared even after implementation. 31) the additional costs resulting from changes in the legislative environment shall be borne by the developer. 32) invertren measurement (available 33) weather tracking regulations will be included 34) weekly time programming will be ensured 35) connection to the system will be possible 36-38) the conditions will be met — the cost to be used for training is planned 39-41) the applicant obtains a statement of support from the county’s government no later than entering the maintenance period, that the project is in line with the objectives of the SEAP/SECAP strategy, the assets to be procured are at least A+ energy graded and lighting modernisation is not relevant. 42-53) the technical content contained in the investment corresponds to these points of the call. 54-64) not relevant (d) fulfilment of substantive assessment criteria: — The project fits the National Energy Strategy 2030 and Hungary II. The National Energy Efficiency Action Plan. — the investment contributes to the reduction of primary energy consumption and GHG emissions — the building concerned is 100 % owned by the municipality — the construction work in the project is subject to public procurement, and compliance with the relevant legal requirements will be ensured during its implementation — the project is not carried out in settlements below 10,000 people — the financial internal rate of return (BMR) for the entire investment is between -4 % and 4 %. — the specific limits have been complied with in all its activities. — The energy demand of a building before development exceeds 150 kWh/m2a. — The applicant undertakes to achieve the ‘nearly zero’ level defined in the Decree of the Minister for National Development. 1.1. The project is in line with Action 4 of Priority 5 of the Baranya County Regional Development Programme (generation and supply based on the use of local energy sources). The territorial focus of the measure is the whole territory of the county. 1.2. 5 points (decrease of CO2 over 30 t/year) 2.1 after non-relevant 3.1 development, the building will be rated BB 3.2 solar panel installation will be realised 4.1 undertakes to involve more than 5 disadvantaged residents in the project (English) / qualifier
 
point in time: 9 February 2022
Timestamp+2022-02-09T00:00:00Z
Timezone+00:00
CalendarGregorian
Precision1 day
Before0
After0

Revision as of 11:49, 9 February 2022

Project Q3949925 in Hungary
Language Label Description Also known as
English
St. Borbála Home Building Energy Renovation in Komló
Project Q3949925 in Hungary

    Statements

    0 references
    0 references
    396,723,800 forint
    0 references
    1,097,024.62 Euro
    0.00276521 Euro
    6 December 2021
    0 references
    1,275,875.689 Euro
    0.0027336256 Euro
    15 December 2021
    0 references
    466,733,882.353 forint
    0 references
    84.999999 percent
    0 references
    25 August 2017
    0 references
    30 September 2019
    0 references
    KOMLÓ VÁROS ÖNKORMÁNYZAT
    0 references
    0 references

    46°11'28.21"N, 18°15'40.97"E
    0 references
    a) projekt célja: A komlói Szent Borbála Otthon épületenergetikai korszerűsítése. b) a projekt tartalma: Önállóan támogatható tevékenységek: - Önkormányzati tulajdonú épület teljes körű homlokzati hőszigetelés, lapostető hőszigetelése és nyílászáró szerkezetek teljes cseréje készül 7/2006 (V. 24.) TNM rendelet követelményeknek megfelelően - Fotovillamos rendszer kialakítása történik Önállóan nem támogatható, választható tevékenységek: - Fosszilis energiahordozó alapú hőtermelő berendezéshez kapcsolódó fűtési és HMV rendszerek korszerűsítése: radiátorok cseréje Önállóan nem támogatható, kötelezően megvalósítandó tevékenységek: - akadálymentesítés: projektarányos akadálymentesítés történik (akadálymentes parkoló, rámpa, illemhely és nyílászárók kialakítása) - azbesztmentesítés: hullámpala eltávolítása révén megtörténik - Nyilvánosság biztosítása: a „Kedvezményezettek tájékoztatási kötelezettségei” alapján történik - képzési anyagok kidolgozása, képzés tartása: a műszaki átadás-átvétel előfeltétele lesz a képzés megtartása energetikus szakértő által. - helyi védettséget megalapozó értékek megőrzése: nem releváns c) a felhívás 3.2 pontjában előírt feltételek teljesülése: 1) a projektre vonatkozó környezetvédelmi és esélyegyenlőségi jogszabályokat betartjuk, a projekt által érintett területen a védett természeti és kulturális értékeket megőrizzük, 2) Az Önkormányzat esélytudatosságot fejez ki: nem közvetít szegregációt, csökkenti a csoportokra vonatkozó meglévő előítéleteket, a projekt nem kirekesztő egyetlen társadalmi csoport számára sem 3) Önálló energetikai rendszert alkotó épület 4) A projekt energetikai központú felmérésen és számításon alapszik 5) a projektnek nincs előre látható klímakockázata 6) g) idősek otthona 7) Arányosítás nem szükséges 8) A tervezési értékek megfelelnek a hatályos TNM rendeletben meghatározott szakmai-műszaki szabályozásnak és a Felhívás vonatkozó követelményeinek, létezik a kiinduló állapotot bemutató energetikai tanúsítvány 9) nem releváns 10) a 176/2008 (VI.30.) Kormányrendelet szerinti energetikai tanúsítvány készül 11) összetett projekt (a fejlesztendő épület épületegyüttesnek minősül) 12) épületenergetikai átvilágítás készült 13) világítástechnikai korszerűsítés nem készül 14-18) nem releváns, mivel nem helyi védett vagy műemlék a fejlesztendő épület 19-23) lásd feljebb 24) a Projekt Terv csatolásra kerül 25) teljesül, hogy -4%<BMR<+4% 26) nem releváns 27) szakirányú műszaki ellenőr költsége betervezésre került a projekt elszámolható költségei között 28) a projekt abszolút mértékben csökkenti az országos ÜHG kibocsátást 29) a feltétel teljesül 30) energetikai tanúsítvány készül a megvalósítást követően is. 31) a jogszabályi környezet változásából fakadó többletköltségeket a projektgazda állja. 32) inverteren mérés megvalósítható 33) időjárás-követő szabályozás épül be 34) heti időprogramozás biztosított lesz 35) rendszerhez való kapcsolódásra lehetőség lesz 36-38) a feltételek teljesülnek – képzésre fordítandó költség betervezésre került 39-41) a támogatást igénylő legkésőbb a fenntartási időszakba lépésig megszerzi a megyei önkormányzat támogató nyilatkozatát arról, hogy a projekt illeszkedik a megye által összefogott SEAP/SECAP stratégia célkitűzéseinek megvalósításához, a beszerzendő eszközök legalább A+ energia besorolásúak, világításkorszerűsítés nem releváns. 42-53) a beruházásban foglalt műszaki tartalom megfelel a felhívás ezen pontjainak. 54-64) nem releváns d) tartalmi értékelési szempontok teljesülése: - A projekt illeszkedik a Nemzeti Energiastratégia 2030 és a Magyarország II. Nemzeti Energiahatékonysági Cselekvési Tervhez is. - a beruházás hozzájárul a primerenergia-fogyasztás és az ÜHG-kibocsátás csökkenéséhez - az érintett épület 100%-ig önkormányzati tulajdonban van - a projektben az építési kivitelezési tevékenység közbeszerzés köteles, a lefolytatása során biztosított lesz a vonatkozó jogszabályi előírásoknak való megfelelés - a projekt nem 10.000 fő alatti településen valósul meg - teljes beruházásra vonatkozóan a pénzügyi belső megtérülési ráta (BMR) -4 % és 4 % közé esik. - a fajlagos korlátok minden tevékenységesetén betartásra kerültek. - Az adott épület fejlesztés előtti energiaigénye meghaladja a 150 kWh/m2a értéket. - A támogatást igénylő a TNM rendelet által definiált „közel nulla” szint elérését vállalja. e) terület-specifikus értékelési szempontok: 1.1. A projekt illeszkedik a Baranya Megyei Területfejlesztési Program 5. prioritásának 4. intézkedéséhez (Helyi energiaforrások felhasználására alapozott energiatermelés- és ellátás). Az intézkedés területi fókusza a megye egész területe. 1.2. 5 pont (30t/év feletti CO2 csökkenés) 2.1 nem releváns 3.1 fejlesztés után az épület BB besorolású lesz 3.2 napelem telepítése valósul meg 4.1 támogatást igénylő vállalja több mint 5 fő hátrányos helyzetű lakos bevonását a projektbe (Hungarian)
    0 references
    the objective of the project: Building energy modernisation of the Szent Borbála Home in Komló. b) the content of the project: Self-eligible activities: — Complete facade thermal insulation, flat roof thermal insulation and complete replacement of doors and windows are prepared in accordance with the requirements of Decree No 7/2006 of 24 May 2006 of the Minister for National Development — Photovoltaic system is established independently, optional activities: — Modernisation of heating and HMV systems related to fossil fuel-based heat generation equipment: replacement of radiators is not self-eligible, mandatory activities: — accessibility: project-proportional accessibility (accessible parking, ramp, toilet and windows) — asbestos removal: by removing wave shale — Publication: based on the Beneficiary’s information obligations — development of training materials and training: technical handover-take-over will be a prerequisite for training by an energetic expert. — preservation of locally protected values: not relevant (c) compliance with the conditions set out in point 3.2 of the call: 1) we comply with the environmental and equal opportunities legislation applicable to the project, we preserve the protected natural and cultural values in the area covered by the project, 2) The Municipality expresses a sense of opportunity: does not mediate segregation, reduces existing prejudices for groups, and does not exclude any social group of the project 3) Building forming an independent energy system 4) The project is based on an energy-centred survey and calculation 5) The project does not have a foreseeable climate risk 6) g) Home 7) Proportionalisation is not required 8) The planning values comply with the professional-technical regulations and the relevant requirements of the call, as laid down in the current Decree of the Minister for Transport, there is the initial energy certificate 9) non-relevant 10) the energy certificate under Government Decree 176/2008 (VI.30.) is being prepared 11) complex project (the building to be developed is considered as a building complex) 12) building energy screening carried out 13) lighting modernisation is not made 14-18) is not relevant, as no local protected or monument building is to be developed 19-23) see above 24) the Project Plan is attached 25) is not relevant, that -4 %<BMR<+ 4 % 26) non-relevant 27) technical inspector costs have been planned among the eligible costs of the project 28) the project reduces the national GHG emissions in absolute terms 29) the condition is met 30) an energy certificate will be prepared even after implementation. 31) the additional costs resulting from changes in the legislative environment shall be borne by the developer. 32) invertren measurement (available 33) weather tracking regulations will be included 34) weekly time programming will be ensured 35) connection to the system will be possible 36-38) the conditions will be met — the cost to be used for training is planned 39-41) the applicant obtains a statement of support from the county’s government no later than entering the maintenance period, that the project is in line with the objectives of the SEAP/SECAP strategy, the assets to be procured are at least A+ energy graded and lighting modernisation is not relevant. 42-53) the technical content contained in the investment corresponds to these points of the call. 54-64) not relevant (d) fulfilment of substantive assessment criteria: — The project fits the National Energy Strategy 2030 and Hungary II. The National Energy Efficiency Action Plan. — the investment contributes to the reduction of primary energy consumption and GHG emissions — the building concerned is 100 % owned by the municipality — the construction work in the project is subject to public procurement, and compliance with the relevant legal requirements will be ensured during its implementation — the project is not carried out in settlements below 10,000 people — the financial internal rate of return (BMR) for the entire investment is between -4 % and 4 %. — the specific limits have been complied with in all its activities. — The energy demand of a building before development exceeds 150 kWh/m2a. — The applicant undertakes to achieve the ‘nearly zero’ level defined in the Decree of the Minister for National Development. 1.1. The project is in line with Action 4 of Priority 5 of the Baranya County Regional Development Programme (generation and supply based on the use of local energy sources). The territorial focus of the measure is the whole territory of the county. 1.2. 5 points (decrease of CO2 over 30 t/year) 2.1 after non-relevant 3.1 development, the building will be rated BB 3.2 solar panel installation will be realised 4.1 undertakes to involve more than 5 disadvantaged residents in the project (English)
    9 February 2022
    0 references
    Komló, Baranya
    0 references

    Identifiers

    TOP-3.2.1-15-BA1-2016-00001
    0 references