Property / summary
 
Within the framework of the project, the environmental impact assessment, the Natura 2000 documentation and the feasibility study of the section of the M0 motorway no. 10 and M1 motorway will be carried out. The aim of the project is to obtain a final environmental permit for the planned phase. The planned road section is about 18 km long by a 2x2 lane concrete road structure, with a total of 5.5-9.8 km of tunnels depending on the track. (English)
Property / summary: Within the framework of the project, the environmental impact assessment, the Natura 2000 documentation and the feasibility study of the section of the M0 motorway no. 10 and M1 motorway will be carried out. The aim of the project is to obtain a final environmental permit for the planned phase. The planned road section is about 18 km long by a 2x2 lane concrete road structure, with a total of 5.5-9.8 km of tunnels depending on the track. (English) / rank
 
Normal rank
Property / summary: Within the framework of the project, the environmental impact assessment, the Natura 2000 documentation and the feasibility study of the section of the M0 motorway no. 10 and M1 motorway will be carried out. The aim of the project is to obtain a final environmental permit for the planned phase. The planned road section is about 18 km long by a 2x2 lane concrete road structure, with a total of 5.5-9.8 km of tunnels depending on the track. (English) / qualifier
 
point in time: 9 February 2022
Timestamp+2022-02-09T00:00:00Z
Timezone+00:00
CalendarGregorian
Precision1 day
Before0
After0

Revision as of 09:32, 9 February 2022

Project Q3942944 in Hungary
Language Label Description Also known as
English
West sector M0, Preparation of the section between main road 10 — motorway M1
Project Q3942944 in Hungary

    Statements

    0 references
    0 references
    1,888,638.43 Euro
    0.00276521 Euro
    4 December 2021
    0 references
    683,000,000 forint
    0 references
    2,196,548.57 Euro
    0.0027336256 Euro
    15 December 2021
    0 references
    803,529,411.765 forint
    0 references
    84.999999 percent
    0 references
    10 July 2017
    0 references
    30 December 2022
    0 references
    NIF Nemzeti Infrastruktúra Fejlesztő zártkörűen működő Részvénytársaság
    0 references
    0 references

    47°27'36.07"N, 18°57'15.05"E
    0 references
    A projekt keretein belül elkészül az M0 autóút 10 sz. főút és M1 autópálya közötti szakaszának Környezeti Hatástanulmánya, Natura 2000 dokumentációja és Megvalósíthatósági Tanulmánya. A projekt célja a tervezett szakaszra jogerős környezetvédelmi engedély megszerzése. A tervezett útszakasz mintegy 18 km hosszú 2x2 forgalmi sávos beton pályaszerkezetű autóút, ezen belül –nyomvonalváltozattól függően– összesen mintegy 5,5-9,8 km alagútban vezet. (Hungarian)
    0 references
    Within the framework of the project, the environmental impact assessment, the Natura 2000 documentation and the feasibility study of the section of the M0 motorway no. 10 and M1 motorway will be carried out. The aim of the project is to obtain a final environmental permit for the planned phase. The planned road section is about 18 km long by a 2x2 lane concrete road structure, with a total of 5.5-9.8 km of tunnels depending on the track. (English)
    9 February 2022
    0 references
    Budaörs, Pest
    0 references

    Identifiers

    IKOP-1.1.0-15-2016-00024
    0 references