Development of commercial and service activities (Q3921750): Difference between revisions

From EU Knowledge Graph
Jump to navigation Jump to search
(‎Changed an Item: add summary)
(‎Changed an Item: Adding English translations)
Property / summary
 
DETAILED PROFESSIONAL CONTENT 1. Capacity expansion, competitiveness — 100 nm2 new high-built warehouses and 250 nm2 outdoor storage are created during the development of the site. — the refurbishment and “introduction” of the current disused warehouse building will result in an additional 40nm2 warehouse capacity — by increasing the energy efficiency of the current operating shop, heating will be reduced by 40 % and electricity demand will be reduced by 40 %. — on the one hand, the purchase of new equipment (forklift, handlifting) is essential for the movement of the new product portfolio (construction materials on pallets weighing about 1.5 tons) and, on the other hand, they also make the current stock more efficient — the preparation and operation of the web site and web store means eliminating our competitive disadvantage. — the decision support system allows for error-free handling of immediate decision situations by linking functional subsystems 2. Preparatory activity, 2.1. permit plans for the construction of new warehouses have been completed, construction authorisation is ongoing 2.2. price calculations on construction and warehouse development, and quotations have been completed 2.3. preliminary negotiations were held on the preparation of the new product portfolio, we contacted the manufacturers and distributors of the products, we received product quotations 3. Project implementation steps, detailed description of project elements: 3.1. Heating modernisation of the existing building 3.1.1. New gas boiler, purchase of radiators, chimney design 3.1.2. Construction of heating pipe system 3.1.3 dismantling of current convectors 3.2. Replacement of doors and windows 3.2.1. 5 pcs 3 wing windows, 3X Up to heat. Value 1,4 K, 4 mm thick 3.2.2 1 pcs front door with 7 wings, up to 9X. 1,4 K, 4 mm thick 3.3. Roof thermal insulation 3.3.1. Above the ceiling in the attic space heat insulation duvet fixation, to minimise upflowing heat loss 3.4. Refurbishment and installation of a disused warehouse 3.4.1. Flooring, walls, floor insulation 3.4.2. Replacement of doors and windows, design of new windows 3.4.3. Preparation of suspended ceilings 3.4.4. Heating and lighting system design 3.4.5. Bathroom design 3.4.6. Establishment of a gateway to a shop 3.4.7. Replacement of roof 3.5. Construction and fitting-out of new warehouse buildings 3.5.1. Building plan documentation on the basis of 105nm2 state-of-the-art, high-built saddle roof warehouse 3.6. Development of information technology, 3.6.1. Acquisition of computer equipment, 2 computers + servers, printers, routers, barcode readers 3.6.2. Building an internal network 3.6.3. web site, web-shop construction 3.6.4. Design of control and decision support redeployment, interconnection of subsystems 3.7. Purchase and installation of warehouse machinery and equipment 3.7.1. Gas forklift 3.7.2 Hand lifting machinery 2 pcs 3.7.3. Purchase and fixing of warehouse shelves (English)
Property / summary: DETAILED PROFESSIONAL CONTENT 1. Capacity expansion, competitiveness — 100 nm2 new high-built warehouses and 250 nm2 outdoor storage are created during the development of the site. — the refurbishment and “introduction” of the current disused warehouse building will result in an additional 40nm2 warehouse capacity — by increasing the energy efficiency of the current operating shop, heating will be reduced by 40 % and electricity demand will be reduced by 40 %. — on the one hand, the purchase of new equipment (forklift, handlifting) is essential for the movement of the new product portfolio (construction materials on pallets weighing about 1.5 tons) and, on the other hand, they also make the current stock more efficient — the preparation and operation of the web site and web store means eliminating our competitive disadvantage. — the decision support system allows for error-free handling of immediate decision situations by linking functional subsystems 2. Preparatory activity, 2.1. permit plans for the construction of new warehouses have been completed, construction authorisation is ongoing 2.2. price calculations on construction and warehouse development, and quotations have been completed 2.3. preliminary negotiations were held on the preparation of the new product portfolio, we contacted the manufacturers and distributors of the products, we received product quotations 3. Project implementation steps, detailed description of project elements: 3.1. Heating modernisation of the existing building 3.1.1. New gas boiler, purchase of radiators, chimney design 3.1.2. Construction of heating pipe system 3.1.3 dismantling of current convectors 3.2. Replacement of doors and windows 3.2.1. 5 pcs 3 wing windows, 3X Up to heat. Value 1,4 K, 4 mm thick 3.2.2 1 pcs front door with 7 wings, up to 9X. 1,4 K, 4 mm thick 3.3. Roof thermal insulation 3.3.1. Above the ceiling in the attic space heat insulation duvet fixation, to minimise upflowing heat loss 3.4. Refurbishment and installation of a disused warehouse 3.4.1. Flooring, walls, floor insulation 3.4.2. Replacement of doors and windows, design of new windows 3.4.3. Preparation of suspended ceilings 3.4.4. Heating and lighting system design 3.4.5. Bathroom design 3.4.6. Establishment of a gateway to a shop 3.4.7. Replacement of roof 3.5. Construction and fitting-out of new warehouse buildings 3.5.1. Building plan documentation on the basis of 105nm2 state-of-the-art, high-built saddle roof warehouse 3.6. Development of information technology, 3.6.1. Acquisition of computer equipment, 2 computers + servers, printers, routers, barcode readers 3.6.2. Building an internal network 3.6.3. web site, web-shop construction 3.6.4. Design of control and decision support redeployment, interconnection of subsystems 3.7. Purchase and installation of warehouse machinery and equipment 3.7.1. Gas forklift 3.7.2 Hand lifting machinery 2 pcs 3.7.3. Purchase and fixing of warehouse shelves (English) / rank
 
Normal rank
Property / summary: DETAILED PROFESSIONAL CONTENT 1. Capacity expansion, competitiveness — 100 nm2 new high-built warehouses and 250 nm2 outdoor storage are created during the development of the site. — the refurbishment and “introduction” of the current disused warehouse building will result in an additional 40nm2 warehouse capacity — by increasing the energy efficiency of the current operating shop, heating will be reduced by 40 % and electricity demand will be reduced by 40 %. — on the one hand, the purchase of new equipment (forklift, handlifting) is essential for the movement of the new product portfolio (construction materials on pallets weighing about 1.5 tons) and, on the other hand, they also make the current stock more efficient — the preparation and operation of the web site and web store means eliminating our competitive disadvantage. — the decision support system allows for error-free handling of immediate decision situations by linking functional subsystems 2. Preparatory activity, 2.1. permit plans for the construction of new warehouses have been completed, construction authorisation is ongoing 2.2. price calculations on construction and warehouse development, and quotations have been completed 2.3. preliminary negotiations were held on the preparation of the new product portfolio, we contacted the manufacturers and distributors of the products, we received product quotations 3. Project implementation steps, detailed description of project elements: 3.1. Heating modernisation of the existing building 3.1.1. New gas boiler, purchase of radiators, chimney design 3.1.2. Construction of heating pipe system 3.1.3 dismantling of current convectors 3.2. Replacement of doors and windows 3.2.1. 5 pcs 3 wing windows, 3X Up to heat. Value 1,4 K, 4 mm thick 3.2.2 1 pcs front door with 7 wings, up to 9X. 1,4 K, 4 mm thick 3.3. Roof thermal insulation 3.3.1. Above the ceiling in the attic space heat insulation duvet fixation, to minimise upflowing heat loss 3.4. Refurbishment and installation of a disused warehouse 3.4.1. Flooring, walls, floor insulation 3.4.2. Replacement of doors and windows, design of new windows 3.4.3. Preparation of suspended ceilings 3.4.4. Heating and lighting system design 3.4.5. Bathroom design 3.4.6. Establishment of a gateway to a shop 3.4.7. Replacement of roof 3.5. Construction and fitting-out of new warehouse buildings 3.5.1. Building plan documentation on the basis of 105nm2 state-of-the-art, high-built saddle roof warehouse 3.6. Development of information technology, 3.6.1. Acquisition of computer equipment, 2 computers + servers, printers, routers, barcode readers 3.6.2. Building an internal network 3.6.3. web site, web-shop construction 3.6.4. Design of control and decision support redeployment, interconnection of subsystems 3.7. Purchase and installation of warehouse machinery and equipment 3.7.1. Gas forklift 3.7.2 Hand lifting machinery 2 pcs 3.7.3. Purchase and fixing of warehouse shelves (English) / qualifier
 
point in time: 8 February 2022
Timestamp+2022-02-08T00:00:00Z
Timezone+00:00
CalendarGregorian
Precision1 day
Before0
After0

Revision as of 17:28, 8 February 2022

Project Q3921750 in Hungary
Language Label Description Also known as
English
Development of commercial and service activities
Project Q3921750 in Hungary

    Statements

    0 references
    0 references
    73,143.69 Euro
    0.00276521 Euro
    3 December 2021
    0 references
    26,451,405 forint
    0 references
    241,027.46 Euro
    0.0027336256 Euro
    15 December 2021
    0 references
    88,171,350.0 forint
    0 references
    29.999998 percent
    0 references
    4 March 2017
    0 references
    7 December 2018
    0 references
    ARAGON-INVEST Befektetési Korlátolt Felelősségű Társaság
    0 references
    0 references

    46°15'59.08"N, 17°5'34.58"E
    0 references
    RÉSZLETES SZAKMAI TARTALOM 1. Kapacitás bővülés, versenyképesség - a telephely fejlesztés során 100 nm2 új, magasépítésű raktár , valamint 250 nm2 kültéri tárolót alakítunk ki. - a jelenlegi használaton kívüli (romos állapotú) raktárépület felújítása és „munkába állítása” további 40nm2 raktári kapacitás bővítést eredményez - a jelenlegi működő üzlet energia hatékonyságának növelésével 40%-kal csökkenni fog a fűtés és 100%-ban az elektromos áram igény. - az új eszköz (targonca, kézi emelő) beszerzések egyrészt nélkülözhetetlenek az új termékportfólió mozgatásához, (építőanyagok kb. 1,5 tonna súlyú raklapokon) másrészt hatékonyabbá teszik a jelenlegi árukészlet mozgatását is - a web oldal, és web áruház elkészítése , működtetése az eddigi versenyhátrányunk megszüntetését jelenti. - a döntéstámogatási rendszer a funkcionális alrendszerek összekapcsolásával az azonnali döntéshelyzetek hibamentes kezelését teszi lehetővé 2. Előkészítő tevékenység , 2.1. az új raktárak építéséhez szükséges engedélyezési tervek elkészültek, az építési engedélyezés folyamatban van 2.2. az építésről és raktári fejlesztésről az árkalkulációk , és árajánlatok elkészültek 2.3. előzetes tárgyalások folytak az új termékportfólió beszerzésének előkészítéséről, a termékek gyártóit, forgalmazóit megkerestük, termék árajánlatokat kaptunk 3. Project megvalósításának lépései , project elemek részletes leírása: 3.1. Jelenleg működő üzlet-épület fűtéskorszerűsítése 3.1.1. Új gázkazán, radiátorok beszerzése, kémény kialakítása 3.1.2. Fűtéscsőrendszer kialakítása 3.1.3. jelenlegi konvektorok leszerelése 3.2. Nyílászárók cseréje 3.2.1. 5db 3 szárnyú ablak , 3X Hőszig. 1,4 K értékű , 4mm vastag 3.2.2. 1db 7 szárnyú bejárati ajtó, 9X Hőszig. 1,4 K értékű , 4mm vastag 3.3. Tetőhőszigetelés 3.3.1. A mennyezet fölé a padlástérben hőszigetelő paplan rögzítése, a felfelé áramló hővesztesék minimalizálására 3.4. Használaton kívüli raktár felújítása, üzembe helyezése 3.4.1. Padozat süllyesztése, falak , padozat szigetelése 3.4.2. Nyílászárók cseréje, új nyílászárók kialakítása 3.4.3. Álmennyezet készítése 3.4.4. Fűtés, világítási rendszer kialakítása 3.4.5. Mosdó kialakítása 3.4.6. Üzletbe történő átjáró kialakítása 3.4.7. Tető cseréje 3.5. Új raktárépületek feleépítése, berendezése 3.5.1. Építési terv dokumentáció alapján 105nm2-es korszerű, magasépítésű nyeregtetős raktár építése 3.6. Információs technológia fejlesztése, 3.6.1. Számítástechnikai eszközök beszerzése, 2 számítógép + szerver, nyomtatók, router, vonalkód leolvasók 3.6.2. Belső hálózat kiépítése 3.6.3. web-oldal, web-áruház elkészítése 3.6.4. Kontrolling-, és döntéstámogatási redszer kialakítása, alrendszerek összekötése 3.7. Raktári gépek, berendezések beszerzése, üzembe helyezése 3.7.1. Gáz üzemű villás targonca 3.7.2. Kézi emelőgép 2 db 3.7.3. Raktári polcok beszerzése, rögzítése (Hungarian)
    0 references
    DETAILED PROFESSIONAL CONTENT 1. Capacity expansion, competitiveness — 100 nm2 new high-built warehouses and 250 nm2 outdoor storage are created during the development of the site. — the refurbishment and “introduction” of the current disused warehouse building will result in an additional 40nm2 warehouse capacity — by increasing the energy efficiency of the current operating shop, heating will be reduced by 40 % and electricity demand will be reduced by 40 %. — on the one hand, the purchase of new equipment (forklift, handlifting) is essential for the movement of the new product portfolio (construction materials on pallets weighing about 1.5 tons) and, on the other hand, they also make the current stock more efficient — the preparation and operation of the web site and web store means eliminating our competitive disadvantage. — the decision support system allows for error-free handling of immediate decision situations by linking functional subsystems 2. Preparatory activity, 2.1. permit plans for the construction of new warehouses have been completed, construction authorisation is ongoing 2.2. price calculations on construction and warehouse development, and quotations have been completed 2.3. preliminary negotiations were held on the preparation of the new product portfolio, we contacted the manufacturers and distributors of the products, we received product quotations 3. Project implementation steps, detailed description of project elements: 3.1. Heating modernisation of the existing building 3.1.1. New gas boiler, purchase of radiators, chimney design 3.1.2. Construction of heating pipe system 3.1.3 dismantling of current convectors 3.2. Replacement of doors and windows 3.2.1. 5 pcs 3 wing windows, 3X Up to heat. Value 1,4 K, 4 mm thick 3.2.2 1 pcs front door with 7 wings, up to 9X. 1,4 K, 4 mm thick 3.3. Roof thermal insulation 3.3.1. Above the ceiling in the attic space heat insulation duvet fixation, to minimise upflowing heat loss 3.4. Refurbishment and installation of a disused warehouse 3.4.1. Flooring, walls, floor insulation 3.4.2. Replacement of doors and windows, design of new windows 3.4.3. Preparation of suspended ceilings 3.4.4. Heating and lighting system design 3.4.5. Bathroom design 3.4.6. Establishment of a gateway to a shop 3.4.7. Replacement of roof 3.5. Construction and fitting-out of new warehouse buildings 3.5.1. Building plan documentation on the basis of 105nm2 state-of-the-art, high-built saddle roof warehouse 3.6. Development of information technology, 3.6.1. Acquisition of computer equipment, 2 computers + servers, printers, routers, barcode readers 3.6.2. Building an internal network 3.6.3. web site, web-shop construction 3.6.4. Design of control and decision support redeployment, interconnection of subsystems 3.7. Purchase and installation of warehouse machinery and equipment 3.7.1. Gas forklift 3.7.2 Hand lifting machinery 2 pcs 3.7.3. Purchase and fixing of warehouse shelves (English)
    8 February 2022
    0 references
    Csurgó, Somogy
    0 references

    Identifiers

    GINOP-1.2.3-8-3-4-16-2017-00261
    0 references