Laboratory development at HELL ENERGY Hungary Kft. (Q3920215): Difference between revisions

From EU Knowledge Graph
Jump to navigation Jump to search
(‎Changed an Item: add summary)
(‎Changed an Item: Adding English translations)
Property / summary
 
HELL ENERGY Magyarország Kft. acquired a production line with a capacity of 50000 pcs/hour, which is currently being installed and installed. In order to double the current capacity, not only the production capacity needs to be developed/enlarged, but also the development of the sub-assemblies performing the manufacturing related tasks, such as the quality control lab, the waste water treatment plant receiving the discharged waste water. All the devices to be procured are closely linked to the production of the new production line and are essential for this. As a result of the development, export sales will increase significantly and products can reach more than 40 countries in excellent quality. (English)
Property / summary: HELL ENERGY Magyarország Kft. acquired a production line with a capacity of 50000 pcs/hour, which is currently being installed and installed. In order to double the current capacity, not only the production capacity needs to be developed/enlarged, but also the development of the sub-assemblies performing the manufacturing related tasks, such as the quality control lab, the waste water treatment plant receiving the discharged waste water. All the devices to be procured are closely linked to the production of the new production line and are essential for this. As a result of the development, export sales will increase significantly and products can reach more than 40 countries in excellent quality. (English) / rank
 
Normal rank
Property / summary: HELL ENERGY Magyarország Kft. acquired a production line with a capacity of 50000 pcs/hour, which is currently being installed and installed. In order to double the current capacity, not only the production capacity needs to be developed/enlarged, but also the development of the sub-assemblies performing the manufacturing related tasks, such as the quality control lab, the waste water treatment plant receiving the discharged waste water. All the devices to be procured are closely linked to the production of the new production line and are essential for this. As a result of the development, export sales will increase significantly and products can reach more than 40 countries in excellent quality. (English) / qualifier
 
point in time: 8 February 2022
Timestamp+2022-02-08T00:00:00Z
Timezone+00:00
CalendarGregorian
Precision1 day
Before0
After0

Revision as of 17:16, 8 February 2022

Project Q3920215 in Hungary
Language Label Description Also known as
English
Laboratory development at HELL ENERGY Hungary Kft.
Project Q3920215 in Hungary

    Statements

    0 references
    25,162,481 forint
    0 references
    69,579.54 Euro
    0.00276521 Euro
    3 December 2021
    0 references
    188,596.189 Euro
    0.0027336256 Euro
    14 December 2021
    0 references
    68,991,228.888 forint
    0 references
    36.472426 percent
    0 references
    24 February 2016
    0 references
    27 September 2017
    0 references
    HELL ENERGY Magyarország Korlátolt Felelősségű Társaság
    0 references
    0 references

    48°12'5.47"N, 20°55'39.00"E
    0 references
    A HELL ENERGY Magyarország Kft. beszerzett egy 50000 db/óra kapacitású gyártósort, amelynek beszerelése, beüzemelése jelenleg folyamatban van. Ahhoz, hogy a jelenlegi kapacitást duplájára lehessen növelni nem csak a gyártási kapacitást kell fejleszteni/bővíteni, hanem a gyártáshoz kapcsolódó háttér feladatokat ellátó részegységek, úgymint a minőséégellenőrzést végző labor, a kibocsátott szennyvizet befogadó szennyvízkezelő fejlesztését is el kell végezni. A beszerezni kívánt eszközök mindegyike szorosan kapcsolódik az új gyártó gépsor termelésbe állításához, ahhoz elengedhetetlenül szükséges. A fejlesztés révén az export értékesítés eredményeként jelentősen nőni fog, a termékek kíváló minőségben juthatnak el a világ több mint 40 országába. (Hungarian)
    0 references
    HELL ENERGY Magyarország Kft. acquired a production line with a capacity of 50000 pcs/hour, which is currently being installed and installed. In order to double the current capacity, not only the production capacity needs to be developed/enlarged, but also the development of the sub-assemblies performing the manufacturing related tasks, such as the quality control lab, the waste water treatment plant receiving the discharged waste water. All the devices to be procured are closely linked to the production of the new production line and are essential for this. As a result of the development, export sales will increase significantly and products can reach more than 40 countries in excellent quality. (English)
    8 February 2022
    0 references
    Szikszó, Borsod-Abaúj-Zemplén
    0 references

    Identifiers

    GINOP-1.2.2-15-2016-02646
    0 references