Capacity-enhancing investment of Tóth-Metal Bt. (Q3917505): Difference between revisions
Jump to navigation
Jump to search
(Changed an Item: add summary) |
(Changed an Item: Adding English translations) |
||||||||||||||
Property / summary | |||||||||||||||
Acquisition of technological equipment: in consultation with the distributors and manufacturers, the equipment needed for our activities was selected, price negotiation and request for quotation. The most important steps in the implementation of the project are the acquisition of DOOSAN PUMA 2600Y CNC lathes and ConturoMatic CV120 contour measuring equipment. The management members gained proficiency in implementing developments similar to those of this project. The quality of the products produced as a result of the project improves compared to the previous products, as a result of the project our production capacity reaches the right level, the technological processes are accelerated and our costs are reduced. (English) | |||||||||||||||
Property / summary: Acquisition of technological equipment: in consultation with the distributors and manufacturers, the equipment needed for our activities was selected, price negotiation and request for quotation. The most important steps in the implementation of the project are the acquisition of DOOSAN PUMA 2600Y CNC lathes and ConturoMatic CV120 contour measuring equipment. The management members gained proficiency in implementing developments similar to those of this project. The quality of the products produced as a result of the project improves compared to the previous products, as a result of the project our production capacity reaches the right level, the technological processes are accelerated and our costs are reduced. (English) / rank | |||||||||||||||
Normal rank | |||||||||||||||
Property / summary: Acquisition of technological equipment: in consultation with the distributors and manufacturers, the equipment needed for our activities was selected, price negotiation and request for quotation. The most important steps in the implementation of the project are the acquisition of DOOSAN PUMA 2600Y CNC lathes and ConturoMatic CV120 contour measuring equipment. The management members gained proficiency in implementing developments similar to those of this project. The quality of the products produced as a result of the project improves compared to the previous products, as a result of the project our production capacity reaches the right level, the technological processes are accelerated and our costs are reduced. (English) / qualifier | |||||||||||||||
point in time: 8 February 2022
|
Revision as of 17:06, 8 February 2022
Project Q3917505 in Hungary
Language | Label | Description | Also known as |
---|---|---|---|
English | Capacity-enhancing investment of Tóth-Metal Bt. |
Project Q3917505 in Hungary |
Statements
46,595,770 forint
0 references
181,964.842 Euro
0.0027336256 Euro
14 December 2021
0 references
66,565,385.714 forint
0 references
70.0 percent
0 references
11 February 2016
0 references
30 August 2016
0 references
Tóth-Metál CNC Forgácsoló és Kereskedelmi Korlátolt Felelősségű Társaság
0 references
Technológiai eszközök beszerzése: a forgalmazókkal, gyártókkal egyeztetve megtörtént a tevékenységünkhöz szükséges berendezések kiválasztása, ártárgyalás és árajánlatkérés. A projekt megvalósításának legfontosabb lépései a DOOSAN PUMA 2600Y CNC eszterga és ConturoMatic CV120 kontúrmérő berendezés beszerzése A menedzsment tagjai jelen projekthez hasonló fejlesztések végrehajtásában jártasságot szereztek. A projekt eredményeként előálló termékek minősége javul az eddigi gyártmányokhoz képest, a projekt eredményeként termelőkapacitásunk eléri a megfelelő mértéket, a technológiai folyamatok felgyorsulnak, költségeink csökkenek. (Hungarian)
0 references
Acquisition of technological equipment: in consultation with the distributors and manufacturers, the equipment needed for our activities was selected, price negotiation and request for quotation. The most important steps in the implementation of the project are the acquisition of DOOSAN PUMA 2600Y CNC lathes and ConturoMatic CV120 contour measuring equipment. The management members gained proficiency in implementing developments similar to those of this project. The quality of the products produced as a result of the project improves compared to the previous products, as a result of the project our production capacity reaches the right level, the technological processes are accelerated and our costs are reduced. (English)
8 February 2022
0 references
Sirok, Heves
0 references
Identifiers
GINOP-1.2.2-15-2015-00101
0 references