OPERATOR OF HYDRAULIC POWER STATIONS — TUBIATE T3A (Q2009591): Difference between revisions

From EU Knowledge Graph
Jump to navigation Jump to search
(‎Changed an Item)
(‎Created claim: summary (P836): OPERATOR OF HYDRAULIC POWER STATIONS — TUBIATE T3A, Adding English summary)
Property / summary
 
OPERATOR OF HYDRAULIC POWER STATIONS — TUBIATE T3A (English)
Property / summary: OPERATOR OF HYDRAULIC POWER STATIONS — TUBIATE T3A (English) / rank
 
Normal rank

Revision as of 12:31, 23 March 2020

Project in Italy financed by DG Regio
Language Label Description Also known as
English
OPERATOR OF HYDRAULIC POWER STATIONS — TUBIATE T3A
Project in Italy financed by DG Regio

    Statements

    0 references
    95,000.0 Euro
    0 references
    95,000.0 Euro
    0 references
    100.0 percent
    0 references
    12 January 2016
    0 references
    16 December 2017
    0 references
    ASSOCIAZIONE CNOS/FAP REGIONE SICILIA
    0 references
    0 references
    0 references

    37°10'22.19"N, 14°28'9.08"E
    0 references
    OPERATORE DI IMPIANTI TERMOIDRAULICI - TUBISTA - T3A (Italian)
    0 references
    OPERATOR OF HYDRAULIC POWER STATIONS — TUBIATE T3A (English)
    0 references

    Identifiers

    G33J16000920006
    0 references
    0 references