(10360.14072017.115000071) 05.18_3053_ILBORO (Q2056991): Difference between revisions

From EU Knowledge Graph
Jump to navigation Jump to search
(‎Changed an Item: import item from Italy)
(‎Removed claims)
Property / EU contribution
107,143.82 Euro
Amount107,143.82 Euro
UnitEuro
 
Property / EU contribution: 107,143.82 Euro / rank
Normal rank
 
Property / budget
310,561.79 Euro
Amount310,561.79 Euro
UnitEuro
 
Property / budget: 310,561.79 Euro / rank
Normal rank
 
Property / co-financing rate
34.5 percent
Amount34.5 percent
Unitpercent
 
Property / co-financing rate: 34.5 percent / rank
Normal rank
 

Revision as of 14:40, 7 February 2022

Project Q2056991 in Italy
Language Label Description Also known as
English
(10360.14072017.115000071) 05.18_3053_ILBORO
Project Q2056991 in Italy

    Statements

    0 references
    1 January 2018
    0 references
    23 March 2020
    0 references
    31 March 2020
    0 references
    COMUNE DI PRATO
    0 references
    0 references
    0 references

    43°46'11.53"N, 11°15'20.09"E
    0 references
    ALLO SCOPO DI PERSEGUIRE GLI OBIETTIVI DI EFFICIENTAMENTO ENERGETICO DELL?EDIFICIO IN ESAME, SI ? PREDISPOSTO UNO SPECIFICO PROGETTO CHE SI ARTICOLA SECONDO I SEGUENTI CONTENUTI.- INFISSI: ? PREVISTA LA RIMOZIONE DI TUTTI QUEGLI INFISSI ESISTENTI CHE NON RISPONDONO AI REQUISITI PRESTAZIONALI DI CUI AL DECRETO REQUISITI MINIMI 26/06/2015; PARALLELAMENTE, SI PROCEDER? ALLA POSA IN OPERA DI NUOVI SERRAMENTI IN ALLUMINIO, A TAGLIO TERMICO, CON VETRO-CAMERA BASSO-EMISSIVO (BE), RISPONDENTI AI REQUISITI PRESTAZIONALI DEL D.M. 16.02.2016 (CONTO TERMICO 2.0) CON UW ELT; 1,67 W7MQ.K. L'INSTALLAZIONE AVVERR? CON PARTICOLARE ATTENZIONE ALLA CORREZIONE DEI C.D. ?PONTI TERMICI? PREVEDENDO QUINDI ANCHE LA SOSTITUZIONE DELLE ATTUALI SOGLIE CON NUOVE SOGLIE A TAGLIO TERMICO. LE VETRATE CON ORIENTAMENTO SUD-EST-SUD-SUD-OVEST SARANNO DOTATE DI RIVESTIMENTO SELETTIVO (VETRO A CONTROLLO SOLARE) CON FATTORE SOLARE DEL VETRO G, GL,N ELT; 0,35.- ISOLAMENTO TERMICO STRUTTURE ORIZZONTALI E VERTICALI: LUNGO GLI (Italian)
    0 references
    IN ORDER TO PURSUE THE OBJECTIVES OF IMPROVING THE ENERGY EFFICIENCY OF THE BUILDING IN QUESTION? SET UP A SPECIFIC PROJECT BASED ON THE FOLLOWING CONTENT OF THE FIXTURES: ? PROVISION IS MADE FOR THE REMOVAL OF ANY EXISTING WINDOW FRAMES WHICH DO NOT MEET THE PERFORMANCE REQUIREMENTS LAID DOWN IN MINIMUM REQUIREMENTS 26/06/2015; IN PARALLEL, DO YOU PROCEED? THE INSTALLATION OF NEW ALUMINIUM, THERMAL CUT WINDOWS, WITH VETRO-CAMERA BASO-LOW-EMISSION (BE), MEETING THE PERFORMANCE REQUIREMENTS OF MINISTERIAL DECREE NO 16.02.2016 (THERMAL ACCOUNT 2.0) WITH HEW ELT; 1,67 W7M.K. THE AVTRR INSTALLATION? WITH PARTICULAR ATTENTION TO THE CORRECTION OF C.D.? FOR THERMAL BRIDGES? IT THEREFORE ALSO PROVIDES FOR THE REPLACEMENT OF EXISTING THRESHOLDS WITH NEW HEAT CUT THRESHOLDS. SUD-EXD-SUD-OVEST GLAZING WILL BE EQUIPPED WITH A SELECTIVE COATING (SOLAR CONTROLLED GLASS) OF GLASS G, GL, N ELT; 0,35-THERMAL INSULATION OF HORIZONTAL AND VERTICAL STRUCTURES: LONG (English)
    0 references
    AFIN D’ATTEINDRE LES OBJECTIFS D’EFFICACITÉ ÉNERGÉTIQUE DU BÂTIMENT CONSIDÉRÉ, OUI? A PRÉPARÉ UN PROJET SPÉCIFIQUE STRUCTURÉ SELON LES CONTENUTIES SUIVANTES: PRÉVOIT LA SUPPRESSION DE TOUS LES APPAREILS EXISTANTS QUI NE RÉPONDENT PAS AUX EXIGENCES DE PERFORMANCE ÉNONCÉES DANS LE DÉCRET 26/06/2015 RELATIF AUX PRESCRIPTIONS MINIMALES; EN PARALLÈLE, ALLONS-NOUS PROCÉDER? L’INSTALLATION DE NOUVEAUX CADRES EN ALUMINIUM, COUPE THERMIQUE, À FAIBLE ÉMISSION DE VERRE-CHAMBRE (BE), RÉPONDANT AUX EXIGENCES DE PERFORMANCE DU DÉCRET MINISTÉRIEL 16.02.2016 (COMPTE THERMIQUE 2.0) AVEC UW ELT; 1.67 W7MQ.K. L’INSTALLATION VA SE RÉALISER? AVEC UNE ATTENTION PARTICULIÈRE À LA CORRECTION DES PONTS THERMIQUES C.D.? IL PRÉVOIT DONC ÉGALEMENT LE REMPLACEMENT DES SEUILS ACTUELS PAR DE NOUVEAUX SEUILS DE COUPE THERMIQUE. LES FENÊTRES EN VERRE ORIENTÉES SUD-EST-SUD-SUD-SUD-SUD-OUEST SERONT ÉQUIPÉES D’UN REVÊTEMENT SÉLECTIF (VERRE CONTRÔLÉ SOLAIRE) AVEC FACTEUR SOLAIRE G, GL, N ELT; 0.35.- STRUCTURES HORIZONTALES ET VERTICALES D’ISOLATION THERMIQUE: LE LONG DE LA (French)
    16 December 2021
    0 references
    OM DE ENERGIE-EFFICIËNTIEDOELSTELLINGEN VAN HET BETROKKEN GEBOUW TE BEREIKEN, JA? EEN SPECIFIEK PROJECT VOORBEREID DAT GESTRUCTUREERD IS VOLGENS DE VOLGENDE CONTENUTIES.- ARMATUREN: VOORZIEN IN DE VERWIJDERING VAN ALLE BESTAANDE ARMATUREN DIE NIET VOLDOEN AAN DE PRESTATIEVEREISTEN VAN HET MINIMUMEISENDE BESLUIT 26/06/2015; PARALLEL, ZULLEN WE VERDER GAAN? DE INSTALLATIE VAN NIEUWE ALUMINIUM FRAMES, THERMISCH GESLEPEN, MET EMISSIEARME GLASKAMER (BE), DIE VOLDOEN AAN DE PRESTATIEVEREISTEN VAN MINISTERIEEL BESLUIT 16.02.2016 (THERMISCHE REKENING 2.0) MET UW ELT; 1.67 W7MQ.K. DE INSTALLATIE ZAL UITKOMEN? MET BIJZONDERE AANDACHT VOOR DE CORRECTIE VAN C.D.? THERMISCHE BRUGGEN? ZIJ VOORZIET DAAROM OOK IN DE VERVANGING VAN DE HUIDIGE DREMPELS DOOR NIEUWE THERMISCHE REDUCTIEDREMPELS. GLAS RAMEN MET ZUID-OOST-ZUID-ZUID-WEST ORIËNTATIE ZAL WORDEN UITGERUST MET SELECTIEVE COATING (ZONNEGESTUURD GLAS) MET ZONNEFACTOR G, GL, N ELT; 0.35.- THERMISCHE ISOLATIE HORIZONTALE EN VERTICALE CONSTRUCTIES: LANGS DE (Dutch)
    23 December 2021
    0 references
    UM DIE ENERGIEEFFIZIENZZIELE DES BETREFFENDEN GEBÄUDES ZU ERREICHEN, JA? ERSTELLTE EIN SPEZIFISCHES PROJEKT, DAS NACH FOLGENDEN CONTENUTIES.- VORRICHTUNGEN STRUKTURIERT IST: VORGESEHEN IST, DASS ALLE VORHANDENEN EINRICHTUNGEN ENTFERNT WERDEN, DIE DIE LEISTUNGSANFORDERUNGEN DES DEKRETS 26/06/2015 NICHT ERFÜLLEN; WERDEN WIR PARALLEL WEITERMACHEN? DIE INSTALLATION NEUER ALUMINIUMRAHMEN, THERMISCHER SCHNITT, MIT EMISSIONSARMEM GLAS-KAMMER (BE), DIE DEN LEISTUNGSANFORDERUNGEN DES MINISTERIALDEKRETS 16.02.2016 (THERMAL ACCOUNT 2.0) MIT UW ELT ENTSPRECHEN; 1.67 W7MQ.K. DIE INSTALLATION WIRD WAHR WERDEN? MIT BESONDEREM AUGENMERK AUF DIE KORREKTUR VON C.D.? WÄRMEBRÜCKEN? SIE SIEHT DAHER AUCH DIE ERSETZUNG DER DERZEITIGEN SCHWELLENWERTE DURCH NEUE THERMISCHE KÜRZUNGSSCHWELLEN VOR. GLASFENSTER MIT SÜD-SÜD-SÜD-WEST-AUSRICHTUNG WERDEN MIT SELEKTIVER BESCHICHTUNG (SOLARGESTEUERTES GLAS) MIT SOLARFAKTOR G, GL,N ELT AUSGESTATTET; 0,35.- WÄRMEDÄMMUNG HORIZONTALE UND VERTIKALE STRUKTUREN: ENTLANG DER (German)
    24 December 2021
    0 references
    PARA ALCANZAR LOS OBJETIVOS DE EFICIENCIA ENERGÉTICA DEL EDIFICIO EN CUESTIÓN, ¿SÍ? PREPARÓ UN PROYECTO ESPECÍFICO QUE SE ESTRUCTURA DE ACUERDO CON LAS SIGUIENTES CONTENUTIES.- ACCESORIOS: SE PREVÉ LA ELIMINACIÓN DE TODOS LOS ACCESORIOS EXISTENTES QUE NO CUMPLAN LOS REQUISITOS DE RENDIMIENTO ESTABLECIDOS EN LOS REQUISITOS MÍNIMOS DEL DECRETO 26/06/2015; PARALELAMENTE, ¿VAMOS A PROCEDER? LA INSTALACIÓN DE NUEVOS BASTIDORES DE ALUMINIO, DE CORTE TÉRMICO, CON CÁMARA DE VIDRIO DE BAJA EMISIÓN (BE), CUMPLIENDO LOS REQUISITOS DE RENDIMIENTO DEL DECRETO MINISTERIAL 16.02.2016 (CUENTA TÉRMICA 2.0) CON UW ELT; 1.67 W7MQ.K. LA INSTALACIÓN SE HARÁ REALIDAD? CON ESPECIAL ATENCIÓN A LA CORRECCIÓN DE LOS PUENTES TÉRMICOS DE C.D.? POR LO TANTO, TAMBIÉN PREVÉ LA SUSTITUCIÓN DE LOS UMBRALES ACTUALES POR NUEVOS UMBRALES DE CORTE TÉRMICO. LAS VENTANAS DE VIDRIO CON ORIENTACIÓN SURESTE-SUR-SUR-SUR-OESTE ESTARÁN EQUIPADAS CON REVESTIMIENTO SELECTIVO (VIDRIO CONTROLADO SOLAR) CON FACTOR SOLAR G, GL, N ELT; 0.35.- ESTRUCTURAS HORIZONTALES Y VERTICALES DE AISLAMIENTO TÉRMICO: A LO LARGO DE LA (Spanish)
    25 January 2022
    0 references
    PRATO
    0 references

    Identifiers