SECOND YEAR IEFP SUBSECTORS VARI_21 (Q2435404): Difference between revisions

From EU Knowledge Graph
Jump to navigation Jump to search
(‎Changed an Item)
(‎Created claim: summary (P836): THIS FRAMEWORK PROJECT CONTAINS 10 ACTIONS OF FI/Q2T TO CARRY OUT SECOND YEAR INTERVENTIONS FOR THE CO-PEERS OF EACH OF 990 HOURS, INCLUDING 132 COURSES. THE STUDENTS CONCERNED WILL COMPLETE THE THREE-YEAR ROUTE WITH THE ACHIEVEMENT OF QUALIFICATION IN A.F. 2020/2021. IN PARTICULAR, THE MEASURES PROPOSED HERE, THE VARIOUS SECTORS OF ENAIP VENETO IN THE THREE-YEAR PERIOD 2018/2021, ARE: 2 ELECTRONIC OPERATOR PATHWAYS IN THE VERONA AND SCALE I...)
Property / summary
 
THIS FRAMEWORK PROJECT CONTAINS 10 ACTIONS OF FI/Q2T TO CARRY OUT SECOND YEAR INTERVENTIONS FOR THE CO-PEERS OF EACH OF 990 HOURS, INCLUDING 132 COURSES. THE STUDENTS CONCERNED WILL COMPLETE THE THREE-YEAR ROUTE WITH THE ACHIEVEMENT OF QUALIFICATION IN A.F. 2020/2021. IN PARTICULAR, THE MEASURES PROPOSED HERE, THE VARIOUS SECTORS OF ENAIP VENETO IN THE THREE-YEAR PERIOD 2018/2021, ARE: 2 ELECTRONIC OPERATOR PATHWAYS IN THE VERONA AND SCALE ISLANDS RESPECTIVELY; 3 MECHANICAL OPERATOR PATHS IN LEGNAGO’S GFS AND ISLAND OF THE SCALE; 1 ELECTRIC OPERATOR PATH IN LEGNAGO’S GFS; 1 OPERATOR’S ROUTE TO REPAIR OF MOTOR VEHICLES IN THE LEGNAGO GFS; 2 CATERING OPERATORS: MEALS PREPARATION AND ADDRESS OF THE ROOM AND BAR IN THE ISLAND SFPS ON THE ISLAND OF THE SCALE AND FELTRE; 1 OPERATOR’S ROUTE TO TOURISM PROMOTION AND HOSTING SERVICES: ADDRESS (English)
Property / summary: THIS FRAMEWORK PROJECT CONTAINS 10 ACTIONS OF FI/Q2T TO CARRY OUT SECOND YEAR INTERVENTIONS FOR THE CO-PEERS OF EACH OF 990 HOURS, INCLUDING 132 COURSES. THE STUDENTS CONCERNED WILL COMPLETE THE THREE-YEAR ROUTE WITH THE ACHIEVEMENT OF QUALIFICATION IN A.F. 2020/2021. IN PARTICULAR, THE MEASURES PROPOSED HERE, THE VARIOUS SECTORS OF ENAIP VENETO IN THE THREE-YEAR PERIOD 2018/2021, ARE: 2 ELECTRONIC OPERATOR PATHWAYS IN THE VERONA AND SCALE ISLANDS RESPECTIVELY; 3 MECHANICAL OPERATOR PATHS IN LEGNAGO’S GFS AND ISLAND OF THE SCALE; 1 ELECTRIC OPERATOR PATH IN LEGNAGO’S GFS; 1 OPERATOR’S ROUTE TO REPAIR OF MOTOR VEHICLES IN THE LEGNAGO GFS; 2 CATERING OPERATORS: MEALS PREPARATION AND ADDRESS OF THE ROOM AND BAR IN THE ISLAND SFPS ON THE ISLAND OF THE SCALE AND FELTRE; 1 OPERATOR’S ROUTE TO TOURISM PROMOTION AND HOSTING SERVICES: ADDRESS (English) / rank
 
Normal rank

Revision as of 11:03, 23 March 2020

Project in Italy financed by DG Regio
Language Label Description Also known as
English
SECOND YEAR IEFP SUBSECTORS VARI_21
Project in Italy financed by DG Regio

    Statements

    0 references
    931,700.0 Euro
    0 references
    28 August 2019
    0 references
    31 October 2020
    0 references
    ENAIP VENETO IMPRESA SOCIALE
    0 references
    0 references
    0 references

    45°26'18.60"N, 10°59'32.68"E
    0 references
    IL PRESENTE PROGETTO QUADRO CONTIENE 10 INTERVENTI DI FI/Q2T PER LA REALIZZAZIONE DI INTERVENTI DI SECONDO ANNO AFFERENTI AI COMPARI VARI CIASCUNO DELLA DURATA DI 990 ORE, DI CUI 132 DI STAGE. GLI STUDENTI COINVOLTI ULTIMERANNO IL PERCORSO TRIENNALE CON IL CONSEGUIMENTO DELLA QUALIFICA NELL'A.F. 2020/2021. NELLO SPECIFICO GLI INTERVENTI QUI PROPOSTI, AMBITO COMPARTI VARI DI ENAIP VENETO RIFERITI AL TRIENNIO 2018/2021, SONO: 2 PERCORSI DI OPERATORE ELETTRONICO RISPETTIVAMENTE NELLE SFP DI VERONA E ISOLA DELLA SCALA; 3 PERCORSI DI OPERATORE MECCANICO RISPETTIVAMENTE NELLE SFP DI LEGNAGO E ISOLA DELLA SCALA; 1 PERCORSO DI OPERATORE ELETTRICO NELLA SFP DI LEGNAGO; 1 PERCORSO DI OPERATORE ALLA RIPARAZIONE DEI VEICOLI A MOTORE NELLA SFP DI LEGNAGO; 2 PERCORSI DI OPERATORE DELLA RISTORAZIONE: INDIRIZZO PREPARAZIONE PASTI E INDIRIZZO SALA E BAR RISPETTIVAMENTE NELLE SFP DI ISOLA DELLA SCALA E FELTRE; 1 PERCORSO DI OPERATORE AI SERVIZI DI PROMOZIONE TURISTICA ED ACCOGLIENZA: INDIRIZZO (Italian)
    0 references
    THIS FRAMEWORK PROJECT CONTAINS 10 ACTIONS OF FI/Q2T TO CARRY OUT SECOND YEAR INTERVENTIONS FOR THE CO-PEERS OF EACH OF 990 HOURS, INCLUDING 132 COURSES. THE STUDENTS CONCERNED WILL COMPLETE THE THREE-YEAR ROUTE WITH THE ACHIEVEMENT OF QUALIFICATION IN A.F. 2020/2021. IN PARTICULAR, THE MEASURES PROPOSED HERE, THE VARIOUS SECTORS OF ENAIP VENETO IN THE THREE-YEAR PERIOD 2018/2021, ARE: 2 ELECTRONIC OPERATOR PATHWAYS IN THE VERONA AND SCALE ISLANDS RESPECTIVELY; 3 MECHANICAL OPERATOR PATHS IN LEGNAGO’S GFS AND ISLAND OF THE SCALE; 1 ELECTRIC OPERATOR PATH IN LEGNAGO’S GFS; 1 OPERATOR’S ROUTE TO REPAIR OF MOTOR VEHICLES IN THE LEGNAGO GFS; 2 CATERING OPERATORS: MEALS PREPARATION AND ADDRESS OF THE ROOM AND BAR IN THE ISLAND SFPS ON THE ISLAND OF THE SCALE AND FELTRE; 1 OPERATOR’S ROUTE TO TOURISM PROMOTION AND HOSTING SERVICES: ADDRESS (English)
    0 references

    Identifiers

    H18D19000610009
    0 references