GUGLIELMI PLANNING (Q4210924): Difference between revisions

From EU Knowledge Graph
Jump to navigation Jump to search
(‎Changed label, description and/or aliases in de, and other parts: Adding German translations)
(‎Changed label, description and/or aliases in nl, and other parts: Adding Dutch translations)
label / nllabel / nl
 
GUGLIELMI PLANNING
Property / summary
 
REALISATIE VAN EEN PROJECT DAT HET BEHEER VAN ALLE FASEN VAN DE DIENSTEN IN VERBAND MET ARCHITECTUUR EN ENGINEERING OMVAT, TOT DE REALISATIE VAN DE WERKZAAMHEDEN VIA HET PROCEDURESYSTEEM BIM (Dutch)
Property / summary: REALISATIE VAN EEN PROJECT DAT HET BEHEER VAN ALLE FASEN VAN DE DIENSTEN IN VERBAND MET ARCHITECTUUR EN ENGINEERING OMVAT, TOT DE REALISATIE VAN DE WERKZAAMHEDEN VIA HET PROCEDURESYSTEEM BIM (Dutch) / rank
 
Normal rank
Property / summary: REALISATIE VAN EEN PROJECT DAT HET BEHEER VAN ALLE FASEN VAN DE DIENSTEN IN VERBAND MET ARCHITECTUUR EN ENGINEERING OMVAT, TOT DE REALISATIE VAN DE WERKZAAMHEDEN VIA HET PROCEDURESYSTEEM BIM (Dutch) / qualifier
 
point in time: 4 February 2022
Timestamp+2022-02-04T00:00:00Z
Timezone+00:00
CalendarGregorian
Precision1 day
Before0
After0

Revision as of 04:13, 4 February 2022

Project Q4210924 in Italy
Language Label Description Also known as
English
GUGLIELMI PLANNING
Project Q4210924 in Italy

    Statements

    0 references
    56,782.12 Euro
    0 references
    94,636.86 Euro
    0 references
    60.0 percent
    0 references
    GUGLIELMI PLANNING SRL
    0 references
    0 references
    REALIZZAZIONE DI UN PROGETTO CHE PREVEDE LA GESTIONE DI TUTTE LE FASI DEI SERVIZI ATTINENTI L'ARCHITETTURA E L'INGEGNERIA, FINO ALLA REALIZZAZIONE DELL'OPERA ATTRAVERSO IL SISTEMA PROCEDURALE BIM (Italian)
    0 references
    REALISATION OF A PROJECT THAT INVOLVES THE MANAGEMENT OF ALL PHASES OF THE SERVICES RELATED TO ARCHITECTURE AND ENGINEERING, UP TO THE REALISATION OF THE WORK THROUGH THE BIM PROCEDURAL SYSTEM (English)
    1 February 2022
    0 references
    RÉALISATION D’UN PROJET QUI IMPLIQUE LA GESTION DE TOUTES LES PHASES DES SERVICES LIÉS À L’ARCHITECTURE ET À L’INGÉNIERIE, JUSQU’À LA RÉALISATION DU TRAVAIL À TRAVERS LE SYSTÈME DE PROCÉDURE BIM (French)
    2 February 2022
    0 references
    REALISIERUNG EINES PROJEKTS, DAS DIE VERWALTUNG ALLER PHASEN DER DIENSTLEISTUNGEN IM ZUSAMMENHANG MIT ARCHITEKTUR UND ENGINEERING UMFASST, BIS ZUR REALISIERUNG DER ARBEIT DURCH DAS BIM-VERFAHRENSSYSTEM (German)
    3 February 2022
    0 references
    REALISATIE VAN EEN PROJECT DAT HET BEHEER VAN ALLE FASEN VAN DE DIENSTEN IN VERBAND MET ARCHITECTUUR EN ENGINEERING OMVAT, TOT DE REALISATIE VAN DE WERKZAAMHEDEN VIA HET PROCEDURESYSTEEM BIM (Dutch)
    4 February 2022
    0 references
    CAMPOBASSO
    0 references

    Identifiers