NETWORK ROOMS (Q1865007): Difference between revisions
Jump to navigation
Jump to search
(Changed an Item) |
(Created claim: summary (P836): THE PROJECT FOR A FULL COVERAGE OF THE WHOLE INSTITUTION THROUGH A WIRELESS NETWORK OF FULL-FIBRE OPTIC BACKBONE NETWORK AND INSTALLATION OF THE EO BUILDING OF THE CENTRE STAR AND THE OCABLLANGGIO BUILDING INSTALLATION FOR THE BUILDING OF THE OINSTLARATION OF THE ACTIVE EQUIPMENT AND ACCESSORIES IN THE MONITORING OF THE EWS WORK CARRIED OUT BY A COMMISSION TRAINED BY THE STAFF OF THE SCHOOL STAFF OF THE SCHOOL WHO WILL HAVE TO CERTIFY THE REGULA...) |
||
Property / summary | |||
THE PROJECT FOR A FULL COVERAGE OF THE WHOLE INSTITUTION THROUGH A WIRELESS NETWORK OF FULL-FIBRE OPTIC BACKBONE NETWORK AND INSTALLATION OF THE EO BUILDING OF THE CENTRE STAR AND THE OCABLLANGGIO BUILDING INSTALLATION FOR THE BUILDING OF THE OINSTLARATION OF THE ACTIVE EQUIPMENT AND ACCESSORIES IN THE MONITORING OF THE EWS WORK CARRIED OUT BY A COMMISSION TRAINED BY THE STAFF OF THE SCHOOL STAFF OF THE SCHOOL WHO WILL HAVE TO CERTIFY THE REGULAR USE OF THE TIME FRAME AND TO TAKE PART IN THE DATA FLOW THAT CAN BE DETECTED BY TEACHERS’ REPORTS IN THE TEACHING OF ALL THE PRE-EXISTING EQUIPMENT WITHOUT WASTE (English) | |||
Property / summary: THE PROJECT FOR A FULL COVERAGE OF THE WHOLE INSTITUTION THROUGH A WIRELESS NETWORK OF FULL-FIBRE OPTIC BACKBONE NETWORK AND INSTALLATION OF THE EO BUILDING OF THE CENTRE STAR AND THE OCABLLANGGIO BUILDING INSTALLATION FOR THE BUILDING OF THE OINSTLARATION OF THE ACTIVE EQUIPMENT AND ACCESSORIES IN THE MONITORING OF THE EWS WORK CARRIED OUT BY A COMMISSION TRAINED BY THE STAFF OF THE SCHOOL STAFF OF THE SCHOOL WHO WILL HAVE TO CERTIFY THE REGULAR USE OF THE TIME FRAME AND TO TAKE PART IN THE DATA FLOW THAT CAN BE DETECTED BY TEACHERS’ REPORTS IN THE TEACHING OF ALL THE PRE-EXISTING EQUIPMENT WITHOUT WASTE (English) / rank | |||
Normal rank |
Revision as of 21:56, 24 March 2020
Project in Italy financed by DG Regio
Language | Label | Description | Also known as |
---|---|---|---|
English | NETWORK ROOMS |
Project in Italy financed by DG Regio |
Statements
15,000.0 Euro
0 references
15,000.0 Euro
0 references
100.0 percent
0 references
8 February 2016
0 references
22 December 2016
0 references
22 December 2016
0 references
S.M. F. SOLIMENA
0 references
IL PROGETTO FINALIZZATO ALLAMPLIAMENTO PER UNA COPERTURA TOTALE DELLINTERO ISTITUTO TRAMITE UNA RETE WIRELESS FUNZIONANTELE FASI PREVISTE SONOOSTESURA DELLA DORSALE IN FIBRA OTTICA E INSTALLAZIONE EO SISTEMAZIONE DELLARMADIO DI EDIFICIO CENTRO STELLA E DI PIANO OCABLAGGIO PER LA REALIZZAZIONE DEI PUNTI LAN RICHIESTI NELLA PARTE ECONOMICA OINSTALLAZIONE DEGLI APPARATI ATTIVI E DEGLI ACCESSORI OREALIZZAZIONE DELLA COPERTURA WIRELESS OCOLLAUDO E VERIFICA DELLA FUNZIONALITIL CONTROLLO DEI LAVORI SAR SVOLTO DA UNA COMMISSIONE FORMATA DA TECNICI EO PROFESSORI DIPENDENTI DELLA SCUOLA CHE DOVRANNO ATTESTARE IL REGOLARE FUNZIONAMENTO E PARTECIPARE ALLE MISURE SUI DATI CARATTERIZZANTII PARAMETRI CHE SARANNO VERIFICATI SONOEFFETTIVO USO DELLA STRUTTURA TEMPO E FLUSSO DEI DATI RILEVABILI DA SERVER INCIDENZA NELLA DIDATTICA TEMPI E MODALIT DUSO RILEVATI DALLE RELAZIONI DEGLI INSEGNANTI LIMPEGNO QUELLO DI RIUTILIZZARE TUTTE LE ATTREZZATURE PREESISTENTI SENZA ALCUNO SPRECO (Italian)
0 references
THE PROJECT FOR A FULL COVERAGE OF THE WHOLE INSTITUTION THROUGH A WIRELESS NETWORK OF FULL-FIBRE OPTIC BACKBONE NETWORK AND INSTALLATION OF THE EO BUILDING OF THE CENTRE STAR AND THE OCABLLANGGIO BUILDING INSTALLATION FOR THE BUILDING OF THE OINSTLARATION OF THE ACTIVE EQUIPMENT AND ACCESSORIES IN THE MONITORING OF THE EWS WORK CARRIED OUT BY A COMMISSION TRAINED BY THE STAFF OF THE SCHOOL STAFF OF THE SCHOOL WHO WILL HAVE TO CERTIFY THE REGULAR USE OF THE TIME FRAME AND TO TAKE PART IN THE DATA FLOW THAT CAN BE DETECTED BY TEACHERS’ REPORTS IN THE TEACHING OF ALL THE PRE-EXISTING EQUIPMENT WITHOUT WASTE (English)
0 references
Identifiers
G36J15001300007
0 references