PROCESS TECHNOLOGISTS (Q715896): Difference between revisions
Jump to navigation
Jump to search
(Changed an Item) |
(Created claim: summary (P836): THE PROJECT AIMED AT STUDENTS IN THE THREE YEARS OF WORK, WITH THE POSSIBILITY OF GAINING ACCESS TO STUDENTS FROM OTHER ADDRESSES IN 30 IF THE NECESSARY NUMBER OF ENROLMENTS IS NOT REACHED. IT IS INTENDED TO COMPLEMENT TRADITIONAL TRAINING TO PROVIDE TECHNICIANS WITH TECHNICAL SKILLS FOR THE INTEGRATION OF TECHNICAL SKILLS IN THE FIELD OF WORKING SKILLS IN THE MAINTENANCE OF THE ELECTRICAL ENGINEERING SKILLS OF THE TECHNICAL SKILLS IN THE QUALIT...) |
||
Property / summary | |||
THE PROJECT AIMED AT STUDENTS IN THE THREE YEARS OF WORK, WITH THE POSSIBILITY OF GAINING ACCESS TO STUDENTS FROM OTHER ADDRESSES IN 30 IF THE NECESSARY NUMBER OF ENROLMENTS IS NOT REACHED. IT IS INTENDED TO COMPLEMENT TRADITIONAL TRAINING TO PROVIDE TECHNICIANS WITH TECHNICAL SKILLS FOR THE INTEGRATION OF TECHNICAL SKILLS IN THE FIELD OF WORKING SKILLS IN THE MAINTENANCE OF THE ELECTRICAL ENGINEERING SKILLS OF THE TECHNICAL SKILLS IN THE QUALITY CONTROL OF THE PROCESS AND OF THE PRODUCT WITH CAPACIT TO WORK IN GRUPO.A THAT PURPOSE IS CHOSEN TO WORK TOGETHER WITH TWO IMPORTANT COMPANIES, PROA S.S.A. S.R.L., WHICH CARRIES OUT THE METAL STRUCTURES OF THE FIAT SEATS AND THE SANTA CROCE S.R.L., WHICH IS RESPONSIBLE FOR THE BOTTLING OF NATURAL AND MINERAL WATER. BOTH FARMS ARE CHARACTERISED BY A COMPLEX PRODUCTION PROCESS, WITH THE PRESENCE OF A MULTITUDE OF ELECTROMECHANICAL INSTALLATIONS REQUIRING UNACCURATA MAINTENANCE. THE OUTGOING PRODUCT COS AS THE PRODUCTION PROCESS IS ALSO SUBJECT TO A (English) | |||
Property / summary: THE PROJECT AIMED AT STUDENTS IN THE THREE YEARS OF WORK, WITH THE POSSIBILITY OF GAINING ACCESS TO STUDENTS FROM OTHER ADDRESSES IN 30 IF THE NECESSARY NUMBER OF ENROLMENTS IS NOT REACHED. IT IS INTENDED TO COMPLEMENT TRADITIONAL TRAINING TO PROVIDE TECHNICIANS WITH TECHNICAL SKILLS FOR THE INTEGRATION OF TECHNICAL SKILLS IN THE FIELD OF WORKING SKILLS IN THE MAINTENANCE OF THE ELECTRICAL ENGINEERING SKILLS OF THE TECHNICAL SKILLS IN THE QUALITY CONTROL OF THE PROCESS AND OF THE PRODUCT WITH CAPACIT TO WORK IN GRUPO.A THAT PURPOSE IS CHOSEN TO WORK TOGETHER WITH TWO IMPORTANT COMPANIES, PROA S.S.A. S.R.L., WHICH CARRIES OUT THE METAL STRUCTURES OF THE FIAT SEATS AND THE SANTA CROCE S.R.L., WHICH IS RESPONSIBLE FOR THE BOTTLING OF NATURAL AND MINERAL WATER. BOTH FARMS ARE CHARACTERISED BY A COMPLEX PRODUCTION PROCESS, WITH THE PRESENCE OF A MULTITUDE OF ELECTROMECHANICAL INSTALLATIONS REQUIRING UNACCURATA MAINTENANCE. THE OUTGOING PRODUCT COS AS THE PRODUCTION PROCESS IS ALSO SUBJECT TO A (English) / rank | |||
Normal rank |
Revision as of 08:02, 24 March 2020
Project in Italy financed by DG Regio
Language | Label | Description | Also known as |
---|---|---|---|
English | PROCESS TECHNOLOGISTS |
Project in Italy financed by DG Regio |
Statements
47,196.0 Euro
0 references
47,196.0 Euro
0 references
100.0 percent
0 references
15 April 2019
0 references
31 December 2020
0 references
ISTITUTO ISTRUZ. SUP."PATINI-LIBERATORE"
0 references
IL PROGETTO RIVOLTO AGLI STUDENTI DEL TRIENNIO DELLISTITUTO PROFESSIONALE CON POSSIBILIT DEL 30 DI ACCESSI A STUDENTI DI ALTRI INDIRIZZI QUALORA NON SI RAGGIUNGA IL NUMERO NECESSARIO DI ISCRIZIONI. SI INTENDE INTEGRARE LA FORMAZIONE TRADIZIONALE PER FORMARE TECNICI CON CAPACIT DI INSERIMENTO NEL MONDO DEL LAVORO COMPETENZE TECNICHE NELLA MANUTENZIONE DEGLI IMPIANTI ELETTROMECCANICI COMPETENZE TECNICHE NEL CONTROLLO QUALIT DEL PROCESSO E DEL PRODOTTO CON CAPACIT DI LAVORARE IN GRUPPO.A TALE SCOPO SI SCELTO DI COLLABORARE CON DUE IMPORTANTI AZIENDE LA PROMA S.S.A. S.R.L. AZIENDA CHE REALIZZA LE STRUTTURE METALLICHE DEI SEDILI FIAT E LA SANTA CROCE S.R.L. CHE SI OCCUPA DI IMBOTTIGLIAMENTO DI ACQUA NATURALE E MINERALE. ENTRAMBE LE AZIENDE SONO CARATTERIZZATE DA UN ARTICOLATO PROCESSO PRODUTTIVO CON LA PRESENZA DI UNA MOLTITUDINE DI IMPIANTI ELETTROMECCANICI CHE NECESSITANO DI UNACCURATA MANUTENZIONE. IL PRODOTTO IN USCITA COS COME IL PROCESSO PRODUTTIVO SONO INOLTRE SOTTOPOSTI AD UNA (Italian)
0 references
THE PROJECT AIMED AT STUDENTS IN THE THREE YEARS OF WORK, WITH THE POSSIBILITY OF GAINING ACCESS TO STUDENTS FROM OTHER ADDRESSES IN 30 IF THE NECESSARY NUMBER OF ENROLMENTS IS NOT REACHED. IT IS INTENDED TO COMPLEMENT TRADITIONAL TRAINING TO PROVIDE TECHNICIANS WITH TECHNICAL SKILLS FOR THE INTEGRATION OF TECHNICAL SKILLS IN THE FIELD OF WORKING SKILLS IN THE MAINTENANCE OF THE ELECTRICAL ENGINEERING SKILLS OF THE TECHNICAL SKILLS IN THE QUALITY CONTROL OF THE PROCESS AND OF THE PRODUCT WITH CAPACIT TO WORK IN GRUPO.A THAT PURPOSE IS CHOSEN TO WORK TOGETHER WITH TWO IMPORTANT COMPANIES, PROA S.S.A. S.R.L., WHICH CARRIES OUT THE METAL STRUCTURES OF THE FIAT SEATS AND THE SANTA CROCE S.R.L., WHICH IS RESPONSIBLE FOR THE BOTTLING OF NATURAL AND MINERAL WATER. BOTH FARMS ARE CHARACTERISED BY A COMPLEX PRODUCTION PROCESS, WITH THE PRESENCE OF A MULTITUDE OF ELECTROMECHANICAL INSTALLATIONS REQUIRING UNACCURATA MAINTENANCE. THE OUTGOING PRODUCT COS AS THE PRODUCTION PROCESS IS ALSO SUBJECT TO A (English)
0 references
Identifiers
I78H19000150007
0 references