ENERGY EFFICIENCY WORK OF THE FIFTH “CIARDI” SECONDARY SCHOOL IN TREVISO (Q4243550): Difference between revisions

From EU Knowledge Graph
Jump to navigation Jump to search
(‎Changed label, description and/or aliases in en: Setting new description)
(‎Changed label, description and/or aliases in en, and other parts: Adding English translations)
label / enlabel / en
 
ENERGY EFFICIENCY WORK OF THE FIFTH “CIARDI” SECONDARY SCHOOL IN TREVISO
Property / summary
 
THE OBJECTIVE OF TRANSFORMING THE BUILDING INTO NZEB WITH THE REALISATION OF COATS, INSULATION OF THE ROOF, BOILER REPLACEMENT WITH HEAT PUMP, REPLACEMENT FIXTURES, INSTALLATION OF 15 KW PHOTOVOLTAIC SYSTEM, INSTALLATION BUILDING AUTOMATION (English)
Property / summary: THE OBJECTIVE OF TRANSFORMING THE BUILDING INTO NZEB WITH THE REALISATION OF COATS, INSULATION OF THE ROOF, BOILER REPLACEMENT WITH HEAT PUMP, REPLACEMENT FIXTURES, INSTALLATION OF 15 KW PHOTOVOLTAIC SYSTEM, INSTALLATION BUILDING AUTOMATION (English) / rank
 
Normal rank
Property / summary: THE OBJECTIVE OF TRANSFORMING THE BUILDING INTO NZEB WITH THE REALISATION OF COATS, INSULATION OF THE ROOF, BOILER REPLACEMENT WITH HEAT PUMP, REPLACEMENT FIXTURES, INSTALLATION OF 15 KW PHOTOVOLTAIC SYSTEM, INSTALLATION BUILDING AUTOMATION (English) / qualifier
 
point in time: 2 February 2022
Timestamp+2022-02-02T00:00:00Z
Timezone+00:00
CalendarGregorian
Precision1 day
Before0
After0

Revision as of 06:45, 2 February 2022

Project Q4243550 in Italy
Language Label Description Also known as
English
ENERGY EFFICIENCY WORK OF THE FIFTH “CIARDI” SECONDARY SCHOOL IN TREVISO
Project Q4243550 in Italy

    Statements

    0 references
    290,206.77 Euro
    0 references
    580,413.53 Euro
    0 references
    50.0 percent
    0 references
    COMUNE DI QUINTO DI TREVISO
    0 references
    0 references
    L'OBIETTIVO ¿A TRASFORMAZIONE DELL'EDIFICIO IN NZEB CON LA REALIZZAZIONE DI CAPPOTTI, ISOLAMENTI DELLA COPERTURA, SOSTITUZIONE CALDAIA CON POMPA DI CALORE, SOSTITUZIONE INFISSI, INSTALLAZIONE IMPIANTO FOTOVOLTAICO DA 15 KW, INSTALLAZIONE BUILDING AUTOMATION (Italian)
    0 references
    THE OBJECTIVE OF TRANSFORMING THE BUILDING INTO NZEB WITH THE REALISATION OF COATS, INSULATION OF THE ROOF, BOILER REPLACEMENT WITH HEAT PUMP, REPLACEMENT FIXTURES, INSTALLATION OF 15 KW PHOTOVOLTAIC SYSTEM, INSTALLATION BUILDING AUTOMATION (English)
    2 February 2022
    0 references
    QUINTO DI TREVISO
    0 references

    Identifiers