Reconstruction of the runway and signal light system at Vilnius Airport, improving flight safety conditions (Q3784126): Difference between revisions
Jump to navigation
Jump to search
(Changed an Item: import item from Lithuania) |
(Changed an Item: Adding English translations) |
||||||||||||||
Property / summary | |||||||||||||||
The company has been operating since September 30, 1991, the founder of which is the Ministry of Transport and Communications of the Republic of Lithuania. The project will be implemented at Vilnius Airport. The runway, which was installed in 1958, was last reconstructed more than 20 years ago. The runway is asphalt coatings, the asphalt coating is physically deteriorated, there are local cracks and transverse cracks. The runway has reached its operating limit, which requires immediate reconstruction of the runway and the signalling system. The aim of the project is to improve flight safety at Vilnius Airport. During the implementation of the project, the RWT coating and the signal light system infrastructure will be upgraded. (English) | |||||||||||||||
Property / summary: The company has been operating since September 30, 1991, the founder of which is the Ministry of Transport and Communications of the Republic of Lithuania. The project will be implemented at Vilnius Airport. The runway, which was installed in 1958, was last reconstructed more than 20 years ago. The runway is asphalt coatings, the asphalt coating is physically deteriorated, there are local cracks and transverse cracks. The runway has reached its operating limit, which requires immediate reconstruction of the runway and the signalling system. The aim of the project is to improve flight safety at Vilnius Airport. During the implementation of the project, the RWT coating and the signal light system infrastructure will be upgraded. (English) / rank | |||||||||||||||
Normal rank | |||||||||||||||
Property / summary: The company has been operating since September 30, 1991, the founder of which is the Ministry of Transport and Communications of the Republic of Lithuania. The project will be implemented at Vilnius Airport. The runway, which was installed in 1958, was last reconstructed more than 20 years ago. The runway is asphalt coatings, the asphalt coating is physically deteriorated, there are local cracks and transverse cracks. The runway has reached its operating limit, which requires immediate reconstruction of the runway and the signalling system. The aim of the project is to improve flight safety at Vilnius Airport. During the implementation of the project, the RWT coating and the signal light system infrastructure will be upgraded. (English) / qualifier | |||||||||||||||
point in time: 1 February 2022
|
Revision as of 15:30, 1 February 2022
Project Q3784126 in Lithuania
Language | Label | Description | Also known as |
---|---|---|---|
English | Reconstruction of the runway and signal light system at Vilnius Airport, improving flight safety conditions |
Project Q3784126 in Lithuania |
Statements
10,493,144.0 Euro
0 references
21,198,273.72 Euro
0 references
49.5 percent
0 references
22 July 2016
0 references
22 July 2018
0 references
Valstybės įmonė Lietuvos oro uostai
0 references
LT-02189
0 references
VĮ "Lietuvos oro uostai" įmonė veikia nuo 1991 m. rusėjo 30 d, kurios steigėjas - Lietuvos Respublikos Susisiekimo ministerija. Projektas bus įgyvendintas Vilniaus oro uoste. 1958 m. įrengtas orlaivių kilimo ir tūpimo takas (KTT) paskutinį kartą buvo rekonstruotas prieš daugiau nei 20 metų. KTT yra asfalto dangos, asfalto danga yra fiziškai susidėvėjusi, vietomis yra įtrūkių, skersinių plyšių. Kilimo tūpimo takas pasiekė savo naudojimo ribą, todėl nedelsiant yra reikalinga kilimo tūpimo tako bei signalinės žiburių sistemos rekonstrukcija. Projekto tikslas – pagerinti skrydžių saugą Vilniaus oro uoste. Įgyvendinant Projektą, bus atnaujinta KTT danga bei signalinių žiburių sistemos infrastruktūra. (Lithuanian)
0 references
The company has been operating since September 30, 1991, the founder of which is the Ministry of Transport and Communications of the Republic of Lithuania. The project will be implemented at Vilnius Airport. The runway, which was installed in 1958, was last reconstructed more than 20 years ago. The runway is asphalt coatings, the asphalt coating is physically deteriorated, there are local cracks and transverse cracks. The runway has reached its operating limit, which requires immediate reconstruction of the runway and the signalling system. The aim of the project is to improve flight safety at Vilnius Airport. During the implementation of the project, the RWT coating and the signal light system infrastructure will be upgraded. (English)
1 February 2022
0 references
Rodūnios kelias 10A, Vilnius
0 references
Identifiers
06.1.1-TID-V-506-01-0001
0 references