Installation of walking and cycling trail in Aušros Avenue in Rietavas city (Q3803276): Difference between revisions

From EU Knowledge Graph
Jump to navigation Jump to search
(‎Changed an Item: import item from Lithuania)
(‎Changed an Item: Adding English translations)
Property / summary
 
The town of Rietava is not sufficiently equipped with pedestrians and cycling routes to ensure the safety of cyclists and pedestrians. It is planned to connect the established pedestrian and bicycle path on Plungė street with the planned pedestrian and cycling path in L. Ivinskio street. The project builds a new pedestrian and bicycle trail, about 0.27 km long, in Rietavas Aušra Avenue. The pedestrian and cycling trail installed during the project will reduce environmental pollution and ensure the safety of cyclists and pedestrians. (English)
Property / summary: The town of Rietava is not sufficiently equipped with pedestrians and cycling routes to ensure the safety of cyclists and pedestrians. It is planned to connect the established pedestrian and bicycle path on Plungė street with the planned pedestrian and cycling path in L. Ivinskio street. The project builds a new pedestrian and bicycle trail, about 0.27 km long, in Rietavas Aušra Avenue. The pedestrian and cycling trail installed during the project will reduce environmental pollution and ensure the safety of cyclists and pedestrians. (English) / rank
 
Normal rank
Property / summary: The town of Rietava is not sufficiently equipped with pedestrians and cycling routes to ensure the safety of cyclists and pedestrians. It is planned to connect the established pedestrian and bicycle path on Plungė street with the planned pedestrian and cycling path in L. Ivinskio street. The project builds a new pedestrian and bicycle trail, about 0.27 km long, in Rietavas Aušra Avenue. The pedestrian and cycling trail installed during the project will reduce environmental pollution and ensure the safety of cyclists and pedestrians. (English) / qualifier
 
point in time: 1 February 2022
Timestamp+2022-02-01T00:00:00Z
Timezone+00:00
CalendarGregorian
Precision1 day
Before0
After0

Revision as of 16:27, 1 February 2022

Project Q3803276 in Lithuania
Language Label Description Also known as
English
Installation of walking and cycling trail in Aušros Avenue in Rietavas city
Project Q3803276 in Lithuania

    Statements

    0 references
    50,503.0 Euro
    0 references
    78,980.7 Euro
    0 references
    63.94 percent
    0 references
    8 May 2019
    0 references
    31 March 2020
    0 references
    Rietavo savivaldybės administracija
    0 references
    0 references
    LT-90311
    0 references
    Rietavo mieste nepakankamai įrengta pėsčiųjų ir dviračių takų, užtikrinančių dviratininkų ir pėsčiųjų eismo saugumą. Numatoma sujungti įrengtą pėsčiųjų ir dviračių taką Plungės gatvėje su planuojamu pėsčiųjų ir dviračių taku L. Ivinskio gatvėje. Įgyvendinant projektą įrengiamas naujas, apie 0,27 km ilgio, pėsčiųjų ir dviračių takas Rietavo miesto Aušros alėjoje. Projekto metu įrengtas pėsčiųjų ir dviračių takas leis sumažinti aplinkos taršą ir užtikrinti dviratininkų ir pėsčiųjų eismo saugumą. (Lithuanian)
    0 references
    The town of Rietava is not sufficiently equipped with pedestrians and cycling routes to ensure the safety of cyclists and pedestrians. It is planned to connect the established pedestrian and bicycle path on Plungė street with the planned pedestrian and cycling path in L. Ivinskio street. The project builds a new pedestrian and bicycle trail, about 0.27 km long, in Rietavas Aušra Avenue. The pedestrian and cycling trail installed during the project will reduce environmental pollution and ensure the safety of cyclists and pedestrians. (English)
    1 February 2022
    0 references
    Laisvės a. 3, Rietavas
    0 references

    Identifiers

    04.5.1-TID-R-516-81-0004
    0 references