ENERGY RENOVATION OF A RESIDENTIAL BUILDING IN LAGUNDO, VIA M. LADURNER N. 9 AB (Q4189389): Difference between revisions
Jump to navigation
Jump to search
(Changed label, description and/or aliases in es, and other parts: Adding Spanish translations) |
(Changed label, description and/or aliases in en, and other parts: Adding English translations) |
||||||||||||||
label / en | label / en | ||||||||||||||
ENERGY RENOVATION OF A RESIDENTIAL BUILDING IN LAGUNDO, VIA M. LADURNER N. 9 AB | |||||||||||||||
Property / summary | |||||||||||||||
THE RESIDENTIAL BUILDING OWNED BY THE INSTITUTE FOR SOCIAL HOUSING OF THE AUTONOMOUS PROVINCE OF BOLZANO Ê LOCATED IN LAGUNDO, VIA M. LADURNER N. 9 A.B, P.ED 913, C.C. LAGUNDO I., RESIDENTIAL BUILDING N. 9, WHOSE CONSTRUCTION WORKS WERE COMPLETED IN 1980, CONSISTS OF THREE VOLUMES CONNECTED BY TWO JOINT EXTERNAL STAIRCASES.\NA THIS APPLICATION FOR THE ERDF 2019 CALL IS SUBMITTED ONLY THE CENTRAL BUILDING, WHICH CONTAINS 4 HOUSING UNITS.\NINTERVENTS FORESEEN BY THE PROJECT: THERMAL INSULATION OF FACADES (ROCK WOOL HOOD, THICKNESS 14 CM), REPLACEMENT OF WINDOW FRAMES (WINDOWS, ENTRANCE DOORS, DIMMING SYSTEM), THERMAL INSULATION WORK ON THE ATTIC FLOOR, REPLACEMENT OF ROOF COVER, REPLACEMENT OF GLASSWORKS, THERMAL REFURBISHMENT OF BALCONIES, REPLACEMENT OF RAILINGS, ELECTRICAL INSTALLATION. THE BUILDING IS EQUIPPED WITH A DISTRICT HEATING SYSTEM WHOSE SUBSTATION COMMON TO THE BUILDING N. 7 Ê POSIZI (English) | |||||||||||||||
Property / summary: THE RESIDENTIAL BUILDING OWNED BY THE INSTITUTE FOR SOCIAL HOUSING OF THE AUTONOMOUS PROVINCE OF BOLZANO Ê LOCATED IN LAGUNDO, VIA M. LADURNER N. 9 A.B, P.ED 913, C.C. LAGUNDO I., RESIDENTIAL BUILDING N. 9, WHOSE CONSTRUCTION WORKS WERE COMPLETED IN 1980, CONSISTS OF THREE VOLUMES CONNECTED BY TWO JOINT EXTERNAL STAIRCASES.\NA THIS APPLICATION FOR THE ERDF 2019 CALL IS SUBMITTED ONLY THE CENTRAL BUILDING, WHICH CONTAINS 4 HOUSING UNITS.\NINTERVENTS FORESEEN BY THE PROJECT: THERMAL INSULATION OF FACADES (ROCK WOOL HOOD, THICKNESS 14 CM), REPLACEMENT OF WINDOW FRAMES (WINDOWS, ENTRANCE DOORS, DIMMING SYSTEM), THERMAL INSULATION WORK ON THE ATTIC FLOOR, REPLACEMENT OF ROOF COVER, REPLACEMENT OF GLASSWORKS, THERMAL REFURBISHMENT OF BALCONIES, REPLACEMENT OF RAILINGS, ELECTRICAL INSTALLATION. THE BUILDING IS EQUIPPED WITH A DISTRICT HEATING SYSTEM WHOSE SUBSTATION COMMON TO THE BUILDING N. 7 Ê POSIZI (English) / rank | |||||||||||||||
Normal rank | |||||||||||||||
Property / summary: THE RESIDENTIAL BUILDING OWNED BY THE INSTITUTE FOR SOCIAL HOUSING OF THE AUTONOMOUS PROVINCE OF BOLZANO Ê LOCATED IN LAGUNDO, VIA M. LADURNER N. 9 A.B, P.ED 913, C.C. LAGUNDO I., RESIDENTIAL BUILDING N. 9, WHOSE CONSTRUCTION WORKS WERE COMPLETED IN 1980, CONSISTS OF THREE VOLUMES CONNECTED BY TWO JOINT EXTERNAL STAIRCASES.\NA THIS APPLICATION FOR THE ERDF 2019 CALL IS SUBMITTED ONLY THE CENTRAL BUILDING, WHICH CONTAINS 4 HOUSING UNITS.\NINTERVENTS FORESEEN BY THE PROJECT: THERMAL INSULATION OF FACADES (ROCK WOOL HOOD, THICKNESS 14 CM), REPLACEMENT OF WINDOW FRAMES (WINDOWS, ENTRANCE DOORS, DIMMING SYSTEM), THERMAL INSULATION WORK ON THE ATTIC FLOOR, REPLACEMENT OF ROOF COVER, REPLACEMENT OF GLASSWORKS, THERMAL REFURBISHMENT OF BALCONIES, REPLACEMENT OF RAILINGS, ELECTRICAL INSTALLATION. THE BUILDING IS EQUIPPED WITH A DISTRICT HEATING SYSTEM WHOSE SUBSTATION COMMON TO THE BUILDING N. 7 Ê POSIZI (English) / qualifier | |||||||||||||||
point in time: 31 January 2022
|
Revision as of 16:52, 31 January 2022
Project Q4189389 in Italy
Language | Label | Description | Also known as |
---|---|---|---|
English | ENERGY RENOVATION OF A RESIDENTIAL BUILDING IN LAGUNDO, VIA M. LADURNER N. 9 AB |
Project Q4189389 in Italy |
Statements
125,318.69 Euro
0 references
294,867.5 Euro
0 references
42.5 percent
0 references
ISTITUTO PER L'EDILIZIA SOCIALE DELLA PROVINCIA AUTONOMA DI BOLZANO
0 references
L`EDIFICIO RESIDENZIALE DI PROPRIETà DELL`ISTITUTO PER L`EDILIZIA SOCIALE DELLA PROVINCIA AUTONOMA DI BOLZANO Ê SITUATO A LAGUNDO IN VIA M. LADURNER N. 9 A,B, P.ED 913, C.C. LAGUNDO I. L¿EDIFICIO RESIDENZIALE N. 9, I CUI LAVORI DI COSTRUZIONE SONO STATI ULTIMATI NEL 1980, CONSISTE IN TRE VOLUMI COLLEGATI TRA LORO DA DUE CORPI SCALA COMUNI ESTERNI.\NA QUESTA DOMANDA DEL BANDO FESR 2019 VIENE PRESENTATO SOLO L`EDIFICIO CENTRALE, IN CUI SI TROVANO 4 ALLOGGI.\NINTERVENTI PREVISTI DA PROGETTO: ISOLAMENTO TERMICO DELLE FACCIATE (CAPPOTTO IN LANA DI ROCCIA, SPESSORE 14 CM), SOSTITUZIONE DEGLI INFISSI (FINESTRE, PORTONI D¿INGRESSO, SISTEMA DI OSCURAMENTO), LAVORI DI ISOLAMENTO TERMICO DEL SOLAIO DEL SOTTOTETTO, SOSTITUZIONE DELLA COPERTURA DEL TETTO, SOSTITUZIONE DELLE LATTONERIE, RISANAMENTO TERMICO DEI BALCONI, SOSTITUZIONE DEI PARAPETTI, MESSA A NORMA DELL¿IMPIANTO ELETTRICO. \NL`EDIFICIO Ê DOTATO DI SISTEMA DI TELERISCALDAMENTO LA CUI SOTTOSTAZIONE COMUNE AL FABBRICATO N. 7 Ê POSIZI (Italian)
0 references
EL EDIFICIO RESIDENCIAL PROPIEDAD DEL INSTITUTO DE VIVIENDAS SOCIALES DE LA PROVINCIA AUTÓNOMA DE BOLZANO Ê SITUADO EN LAGUNDO, VÍA M. LADURNER N. 9 A.B, P.ED 913, C.C. LAGUNDO I., EDIFICIO RESIDENCIAL N. 9, CUYAS OBRAS SE TERMINARON EN 1980, CONSTA DE TRES VOLÚMENES CONECTADOS POR DOS ESCALERAS EXTERIORES CONJUNTAS.\NA ESTA SOLICITUD PARA LA CONVOCATORIA FEDER 2019 SE PRESENTA SOLO EL EDIFICIO CENTRAL, QUE CONSTA DE 4 UNIDADES DE VIVIENDA.\NTERVENTOS PREVISTOS POR EL PROYECTO: AISLAMIENTO TÉRMICO DE FACHADAS (CAPUCHA DE LANA DE ROCA, ESPESOR 14 CM), SUSTITUCIÓN DE MARCOS DE VENTANAS (VENTANAS, PUERTAS DE ENTRADA, SISTEMA DE ATENUACIÓN), TRABAJOS DE AISLAMIENTO TÉRMICO EN EL PISO DEL ÁTICO, SUSTITUCIÓN DE CUBIERTA DE TECHO, SUSTITUCIÓN DE OBRAS DE VIDRIO, RENOVACIÓN TÉRMICA DE BALCONES, SUSTITUCIÓN DE BARANDILLAS, INSTALACIÓN ELÉCTRICA. EL EDIFICIO ESTÁ EQUIPADO CON UN SISTEMA DE CALEFACCIÓN URBANA CUYA SUBESTACIÓN COMÚN AL EDIFICIO N. 7 Ê POSIZI (Spanish)
31 January 2022
0 references
THE RESIDENTIAL BUILDING OWNED BY THE INSTITUTE FOR SOCIAL HOUSING OF THE AUTONOMOUS PROVINCE OF BOLZANO Ê LOCATED IN LAGUNDO, VIA M. LADURNER N. 9 A.B, P.ED 913, C.C. LAGUNDO I., RESIDENTIAL BUILDING N. 9, WHOSE CONSTRUCTION WORKS WERE COMPLETED IN 1980, CONSISTS OF THREE VOLUMES CONNECTED BY TWO JOINT EXTERNAL STAIRCASES.\NA THIS APPLICATION FOR THE ERDF 2019 CALL IS SUBMITTED ONLY THE CENTRAL BUILDING, WHICH CONTAINS 4 HOUSING UNITS.\NINTERVENTS FORESEEN BY THE PROJECT: THERMAL INSULATION OF FACADES (ROCK WOOL HOOD, THICKNESS 14 CM), REPLACEMENT OF WINDOW FRAMES (WINDOWS, ENTRANCE DOORS, DIMMING SYSTEM), THERMAL INSULATION WORK ON THE ATTIC FLOOR, REPLACEMENT OF ROOF COVER, REPLACEMENT OF GLASSWORKS, THERMAL REFURBISHMENT OF BALCONIES, REPLACEMENT OF RAILINGS, ELECTRICAL INSTALLATION. THE BUILDING IS EQUIPPED WITH A DISTRICT HEATING SYSTEM WHOSE SUBSTATION COMMON TO THE BUILDING N. 7 Ê POSIZI (English)
31 January 2022
0 references
BOLZANO
0 references