RENOVATION AND ENERGY EFFICIENCY OF THE ARENA. MEASURES ON THE BUILDING ENVELOPE AND THE CONSTRUCTION OF THERMAL INSTALLATIONS, ELECTRIC LIGHTING AND LIGHTING (Q2023510): Difference between revisions

From EU Knowledge Graph
Jump to navigation Jump to search
(‎Changed an Item)
(‎Created claim: summary (P836): REMOVAL AND REPLACEMENT OF ROOF SHEETS IN STATE OF DILAPIDATED OR DAMAGED PLATES, LAYING OF A LAYER OF INSULATING SUNLIGHT FOR THE INSULATION OF SUNLIGHT AND OF A PAINT WITH A HIGH RESISTANCE VARNISH FOR THE PROTECTION OF UV RADIATION, THE EXECUTION OF STRUCTURES FOR RAIN-PIPES AND VENTILATION OF ALUMINIUM, INTERVENTION ON THE PERIMETER WALLS (HUMIDIFICATION OF MASONRY, APPLICATION OF A CHEMICAL BARRIER TO THE EXTERNAL BASE AND LAYING OF A NETWO...)
Property / summary
 
REMOVAL AND REPLACEMENT OF ROOF SHEETS IN STATE OF DILAPIDATED OR DAMAGED PLATES, LAYING OF A LAYER OF INSULATING SUNLIGHT FOR THE INSULATION OF SUNLIGHT AND OF A PAINT WITH A HIGH RESISTANCE VARNISH FOR THE PROTECTION OF UV RADIATION, THE EXECUTION OF STRUCTURES FOR RAIN-PIPES AND VENTILATION OF ALUMINIUM, INTERVENTION ON THE PERIMETER WALLS (HUMIDIFICATION OF MASONRY, APPLICATION OF A CHEMICAL BARRIER TO THE EXTERNAL BASE AND LAYING OF A NETWORK OF GLASS FIBRE WITH FIXED CAP PRIMERS, CONSTRUCTION AND FITTING OF A COAT OF GLASS FIBRE WITH A CAP OF 30 CM THICK TO THE FOUR SIDES OF THE SPACE TO CONTAIN THE GROUND), ELECTRICAL SYSTEMS (NEW ELECTRICAL SWITCHBOARDS FOR TRIGENERATION, UTA AND SIST SYSTEMS) (English)
Property / summary: REMOVAL AND REPLACEMENT OF ROOF SHEETS IN STATE OF DILAPIDATED OR DAMAGED PLATES, LAYING OF A LAYER OF INSULATING SUNLIGHT FOR THE INSULATION OF SUNLIGHT AND OF A PAINT WITH A HIGH RESISTANCE VARNISH FOR THE PROTECTION OF UV RADIATION, THE EXECUTION OF STRUCTURES FOR RAIN-PIPES AND VENTILATION OF ALUMINIUM, INTERVENTION ON THE PERIMETER WALLS (HUMIDIFICATION OF MASONRY, APPLICATION OF A CHEMICAL BARRIER TO THE EXTERNAL BASE AND LAYING OF A NETWORK OF GLASS FIBRE WITH FIXED CAP PRIMERS, CONSTRUCTION AND FITTING OF A COAT OF GLASS FIBRE WITH A CAP OF 30 CM THICK TO THE FOUR SIDES OF THE SPACE TO CONTAIN THE GROUND), ELECTRICAL SYSTEMS (NEW ELECTRICAL SWITCHBOARDS FOR TRIGENERATION, UTA AND SIST SYSTEMS) (English) / rank
 
Normal rank

Revision as of 09:41, 23 March 2020

Project in Italy financed by DG Regio
Language Label Description Also known as
English
RENOVATION AND ENERGY EFFICIENCY OF THE ARENA. MEASURES ON THE BUILDING ENVELOPE AND THE CONSTRUCTION OF THERMAL INSTALLATIONS, ELECTRIC LIGHTING AND LIGHTING
Project in Italy financed by DG Regio

    Statements

    0 references
    1,103,359.83 Euro
    0 references
    1,471,146.44 Euro
    0 references
    75.0 percent
    0 references
    26 September 2014
    0 references
    22 August 2018
    0 references
    COMUNE DI PIEDIMONTE MATESE
    0 references

    41°21'2.95"N, 14°22'4.91"E
    0 references
    RIMOZIONE E SOSTITUZIONE SUI TETTI DELLE LAMIERE IN STATO DI FATISCENZA O DANNEGGIATE, POSA DI UNO STRATO MATERIALE ISOLANTE TERMOACUSTICO PER L'ISOLAMENTO DEL LASTRICO SOLARE E DI UNA VERNICE AD ALTA RESISTENZA PER PROTEZIONE DEI RAGGI UV, ESECUZIONE DI OPERE ALLE PLUVIALI E CANNE DI VENTILAZIONE IN ALLUMINIO, INTERVENTI ALLE PARETI PERIMETRALI (DEUMIDIFICAZIONE MURATURA, APPLICAZIONE BARRIERA CHIMICA ALLA BASE ESTERNA E POSA DI UNA RETE IN FIBRA DI VETRO CON PRIMER FISSATIVO COMBINATO, REALIZZAZIONE E POSA DI UN CAPPOTTO ALLE PARETI PERIMETRALI), INFISSI INTERNI ED ESTERNI (PORTONCINO BLINDATO E INFISSI ESTERNI, DOTATI DI TRIPLO VETROCAMERA BASSO-EMISSIVO), OPERE STRUTTURALI (REALIZZAZIONE DI UN LOCALE TECNICO IN CONGLOMERATO CEMENTIZIO ARMATO, PER UN'ALTEZZA COMPLESSIVA DI M 3,70 DA INTERRO E SETTI DELLO SPESSORE DI 30 CM AI QUATTRO LATI DEL LOCALE PER CONTENERE LA SPINTA DEL TERRENO), IMPIANTI ELETTRICI (NUOVI QUADRI ELETTRICI DI ALIMENTAZIONE SISTEMA DI TRIGENERAZIONE, UTA E SISTE (Italian)
    0 references
    REMOVAL AND REPLACEMENT OF ROOF SHEETS IN STATE OF DILAPIDATED OR DAMAGED PLATES, LAYING OF A LAYER OF INSULATING SUNLIGHT FOR THE INSULATION OF SUNLIGHT AND OF A PAINT WITH A HIGH RESISTANCE VARNISH FOR THE PROTECTION OF UV RADIATION, THE EXECUTION OF STRUCTURES FOR RAIN-PIPES AND VENTILATION OF ALUMINIUM, INTERVENTION ON THE PERIMETER WALLS (HUMIDIFICATION OF MASONRY, APPLICATION OF A CHEMICAL BARRIER TO THE EXTERNAL BASE AND LAYING OF A NETWORK OF GLASS FIBRE WITH FIXED CAP PRIMERS, CONSTRUCTION AND FITTING OF A COAT OF GLASS FIBRE WITH A CAP OF 30 CM THICK TO THE FOUR SIDES OF THE SPACE TO CONTAIN THE GROUND), ELECTRICAL SYSTEMS (NEW ELECTRICAL SWITCHBOARDS FOR TRIGENERATION, UTA AND SIST SYSTEMS) (English)
    0 references

    Identifiers

    D17H13002260008
    0 references