Reconstruction of track No 1 and 2 Ostrov nad Oslavou — Žďár nad Sazarach_1 (Q72118): Difference between revisions
Jump to navigation
Jump to search
(Changed an Item) |
(Changed an Item) |
||
Property / programme | |||
Property / programme: Transport - CZ - ERDF/CF / rank | |||
Normal rank |
Revision as of 01:09, 26 March 2020
Project in Czech Republic financed by DG Regio
Language | Label | Description | Also known as |
---|---|---|---|
English | Reconstruction of track No 1 and 2 Ostrov nad Oslavou — Žďár nad Sazarach_1 |
Project in Czech Republic financed by DG Regio |
Statements
762,807,511.07 Czech koruna
0 references
30,512,300.442800004 Euro
0.04 Euro
10 January 2020
0 references
986,718,638.0 Czech koruna
0 references
77.31 percent
0 references
21 March 2016
0 references
20 April 2017
0 references
20 April 2017
0 references
Správa železniční dopravní cesty, státní organizace
0 references
11000
0 references
Stavba se nachází v km cca 77,526-86,486 trati Brno-Židenice - Havlíčkův Brod. Jedná se o celostátní trať zahrnutou do systému tratí TEN-T. Stavbou bude provedena rekonstrukce a modernizace úseku ve stávající stopě. Území dotčené stavbou má charakter pozemků dráhy se stávající dvoukolejnou trati. Trať prochází územím s polními, lučními i lesními pozemky. Střídavě se těleso dráhy nachází v zářezu a náspu. (Czech)
0 references
Construction is at km around 77,526-86,486 line Brno-Židenice — Havlíčkův Brod. This is a national line included in the TEN-T line system by building renovation and upgrading of the existing footprint. The area concerned by the construction is characterised by the nature of the runway with the existing twin track. The line is passing through the land with land, meadows and forest land. Alternatively, the body of the track is to be cut and embankments. (English)
0 references
Identifiers
CZ.04.1.41/0.0/0.0/15_001/0000019
0 references