¿PROJECT TO OPTIMISE THE PRODUCTION CHAIN: ADVANCED AUTOMATISM MACHINING CENTRE¿ (Q4051299): Difference between revisions

From EU Knowledge Graph
Jump to navigation Jump to search
(‎Changed label, description and/or aliases in en: Setting new description)
(‎Changed label, description and/or aliases in en, and other parts: Adding English translations)
label / enlabel / en
 
¿PROJECT TO OPTIMISE THE PRODUCTION CHAIN: ADVANCED AUTOMATISM MACHINING CENTRE¿
Property / summary
 
THE INVESTMENT, WHICH IS THE SUBJECT OF THIS APPLICATION, CONSISTS OF THE PURCHASE OF AN OPERATIONAL UNIT ¿AUTOMATED MULTIPALLET HORIZONTAL WORK CENTRE. THE SYSTEM TO BE BUILT WILL CONSIST OF A HORIZONTAL MACHINING CENTRE WITH ROBOTISED PALLET CHANGE, ROBOTISED TOOL CHANGE SYSTEM, AUTOMATIC MACHINING CONTROL BY MEANS OF ELECTRONIC MANAGEMENT OF THE WORK PHASES. THE MACHINE WILL BE INTERCONNECTED TO THE CORPORATE IT NETWORK PROVIDING CONTINUOUSLY (English)
Property / summary: THE INVESTMENT, WHICH IS THE SUBJECT OF THIS APPLICATION, CONSISTS OF THE PURCHASE OF AN OPERATIONAL UNIT ¿AUTOMATED MULTIPALLET HORIZONTAL WORK CENTRE. THE SYSTEM TO BE BUILT WILL CONSIST OF A HORIZONTAL MACHINING CENTRE WITH ROBOTISED PALLET CHANGE, ROBOTISED TOOL CHANGE SYSTEM, AUTOMATIC MACHINING CONTROL BY MEANS OF ELECTRONIC MANAGEMENT OF THE WORK PHASES. THE MACHINE WILL BE INTERCONNECTED TO THE CORPORATE IT NETWORK PROVIDING CONTINUOUSLY (English) / rank
 
Normal rank
Property / summary: THE INVESTMENT, WHICH IS THE SUBJECT OF THIS APPLICATION, CONSISTS OF THE PURCHASE OF AN OPERATIONAL UNIT ¿AUTOMATED MULTIPALLET HORIZONTAL WORK CENTRE. THE SYSTEM TO BE BUILT WILL CONSIST OF A HORIZONTAL MACHINING CENTRE WITH ROBOTISED PALLET CHANGE, ROBOTISED TOOL CHANGE SYSTEM, AUTOMATIC MACHINING CONTROL BY MEANS OF ELECTRONIC MANAGEMENT OF THE WORK PHASES. THE MACHINE WILL BE INTERCONNECTED TO THE CORPORATE IT NETWORK PROVIDING CONTINUOUSLY (English) / qualifier
 
point in time: 27 January 2022
Timestamp+2022-01-27T00:00:00Z
Timezone+00:00
CalendarGregorian
Precision1 day
Before0
After0

Revision as of 06:23, 27 January 2022

Project Q4051299 in Italy
Language Label Description Also known as
English
¿PROJECT TO OPTIMISE THE PRODUCTION CHAIN: ADVANCED AUTOMATISM MACHINING CENTRE¿
Project Q4051299 in Italy

    Statements

    0 references
    85,500.0 Euro
    0 references
    171,000.0 Euro
    0 references
    50.0 percent
    0 references
    ATOMAT S.P.A.
    0 references
    0 references
    L¿INVESTIMENTO, OGGETTO DELLA PRESENTE DOMANDA, CONSISTE IN UN ACQUISTO DI UN UNITà OPERATIVA ¿CENTRO DI LAVORO ORIZZONTALE MULTIPALLET AUTOMATICO¿. L¿IMPIANTO CHE SI INTENDE REALIZZARE SARà COMPOSTO DA UN CENTRO DI LAVORO ORIZZONTALE CON CAMBIO PALLETS ROBOTIZZATO, SISTEMA ROBOTIZZATO DI CAMBIO UTENSILI, CONTROLLO AUTOMATICO DELLE LAVORAZIONI PER MEZZO DI UNA GESTIONE ELETTRONICA DI GOVERNO DELLE FASI LAVORO. LA MACCHINA SARà INTERCONNESSA ALLA RETE IT AZIENDALE FORNENDO IN CONTINUO (Italian)
    0 references
    THE INVESTMENT, WHICH IS THE SUBJECT OF THIS APPLICATION, CONSISTS OF THE PURCHASE OF AN OPERATIONAL UNIT ¿AUTOMATED MULTIPALLET HORIZONTAL WORK CENTRE. THE SYSTEM TO BE BUILT WILL CONSIST OF A HORIZONTAL MACHINING CENTRE WITH ROBOTISED PALLET CHANGE, ROBOTISED TOOL CHANGE SYSTEM, AUTOMATIC MACHINING CONTROL BY MEANS OF ELECTRONIC MANAGEMENT OF THE WORK PHASES. THE MACHINE WILL BE INTERCONNECTED TO THE CORPORATE IT NETWORK PROVIDING CONTINUOUSLY (English)
    27 January 2022
    0 references
    REMANZACCO
    0 references

    Identifiers