Rehabilitation of the rock wall of Hroška (Q58798): Difference between revisions

From EU Knowledge Graph
Jump to navigation Jump to search
(‎Removed claim: co-financing rate (P837): 84.9999999624248 percent)
(‎Changed an Item)
Property / co-financing rate
 
85.0 percent
Amount85.0 percent
Unitpercent
Property / co-financing rate: 85.0 percent / rank
 
Normal rank

Revision as of 17:34, 19 March 2020

Project in Czech Republic financed by DG Regio
Language Label Description Also known as
English
Rehabilitation of the rock wall of Hroška
Project in Czech Republic financed by DG Regio

    Statements

    0 references
    10,179,577.02 Czech koruna
    0 references
    407,183.0808 Euro
    10 January 2020
    0 references
    11,975,972.97 Czech koruna
    0 references
    479,038.91880000004 Euro
    10 January 2020
    0 references
    85.0 percent
    0 references
    17 July 2018
    0 references
    1 August 2019
    0 references
    30 September 2019
    0 references
    Obec Bílý Újezd
    0 references
    0 references

    50°17'18.02"N, 16°11'46.14"E
    0 references
    51801
    0 references
    Obsahem projektu je sanace skalní stěny v Bílém Újezdě, místní části Hroška. Stabilizace skalní stěny proběhne tak, aby byla zajištěna bezpečnost obyvatel domů situovaných v těsné blízkosti pod skalní stěnou. Zároveň je řešena technická ochrana objektů a nemovitostí. (Czech)
    0 references
    The project content is the rehabilitation of the rock wall in Bíá Úří Úří, the local part of Hroška. The stabilisation of the rock wall shall be carried out in such a way as to ensure the safety of the inhabitants of homes situated in close proximity to the rocky wall. At the same time, the technical protection of buildings and buildings is addressed. (English)
    0 references

    Identifiers

    CZ.05.1.24/0.0/0.0/17_062/0005906
    0 references