Reconstruction of the Tyrško Tyršovo embankments in Zlín, Stage 1 (Q19039): Difference between revisions

From EU Knowledge Graph
Jump to navigation Jump to search
(‎Removed claim: co-financing rate (P837): 29.9999999877215 percent)
(‎Changed an Item)
Property / co-financing rate
 
30.0 percent
Amount30.0 percent
Unitpercent
Property / co-financing rate: 30.0 percent / rank
 
Normal rank

Revision as of 15:10, 19 March 2020

Project in Czech Republic financed by DG Regio
Language Label Description Also known as
English
Reconstruction of the Tyrško Tyršovo embankments in Zlín, Stage 1
Project in Czech Republic financed by DG Regio

    Statements

    0 references
    9,773,152.19 Czech koruna
    0 references
    390,926.08759999997 Euro
    10 January 2020
    0 references
    32,577,173.98 Czech koruna
    0 references
    1,303,086.9592000002 Euro
    10 January 2020
    0 references
    30.0 percent
    0 references
    10 May 2017
    0 references
    26 September 2018
    0 references
    31 December 2018
    0 references
    Teplárna Kladno s.r.o.
    0 references

    50°9'24.62"N, 14°8'25.22"E
    0 references
    27203
    0 references
    Projekt je zaměřen na rekonstrukci horkovodního potrubního systému v rámci centrálního zásobování teplem na Tyršově nábřeží ve Zlíně. Předmětem projektu je provedení optimalizace průměrů potrubí, nových tepelných izolací. Cílem projektu je dosažení úspor primární energie. a. (Czech)
    0 references
    The project is aimed at the reconstruction of the hot water pipeline system within the district heating supply to Tyrštový náquke in Zlín. The purpose of the project is to optimise pipe diameters, new heat insulation. The aim of the project is to achieve savings from primary energy. (English)
    0 references

    Identifiers

    CZ.01.3.15/0.0/0.0/15_025/0007077
    0 references