(A19_075_2015_0750039_1042) IEPT CHANGES (Q2065901): Difference between revisions
Jump to navigation
Jump to search
(Changed an Item: Label in wikidata changed) |
(Created claim: summary (P836): THE PROJECT? ON THE IMPROVEMENT OF THE EFFICIENCY OF THE PRODUCTION PROCESS OF DYEING THE HOLDING BY LUIGI E SRL. IN PARTICULAR, IS THIS A NEW RING WITHIN THE COMPANY WITH THE AIM OF RECOVERING HEAT FROM THE COOLING OF THE DYE TOILETS TO PREHEAT THE WATER THAT VERR? USED FOR THE SUBSEQUENT BATHROOMS. THE PROJECT WILL ALSO PROVIDE FOR ALL OTHER ACCESSORIES TO STORE THE GREATEST QUANTITY OF WATER POSSIBLE IN ORDER TO OPTIMISE THE AMOUNT OF WATER T...) |
||
Property / summary | |||
THE PROJECT? ON THE IMPROVEMENT OF THE EFFICIENCY OF THE PRODUCTION PROCESS OF DYEING THE HOLDING BY LUIGI E SRL. IN PARTICULAR, IS THIS A NEW RING WITHIN THE COMPANY WITH THE AIM OF RECOVERING HEAT FROM THE COOLING OF THE DYE TOILETS TO PREHEAT THE WATER THAT VERR? USED FOR THE SUBSEQUENT BATHROOMS. THE PROJECT WILL ALSO PROVIDE FOR ALL OTHER ACCESSORIES TO STORE THE GREATEST QUANTITY OF WATER POSSIBLE IN ORDER TO OPTIMISE THE AMOUNT OF WATER TO BE RECOVERED ON THE BASIS OF THE AMOUNT OF WORK ON THE FARM. IN ADDITION, ALL ELECTRIC MOTORS WILL BE REPLACED WITH OTHER NEW, HIGHLY PERFORMING NEW ONES, WITH A MINIMUM OF IE3. (English) | |||
Property / summary: THE PROJECT? ON THE IMPROVEMENT OF THE EFFICIENCY OF THE PRODUCTION PROCESS OF DYEING THE HOLDING BY LUIGI E SRL. IN PARTICULAR, IS THIS A NEW RING WITHIN THE COMPANY WITH THE AIM OF RECOVERING HEAT FROM THE COOLING OF THE DYE TOILETS TO PREHEAT THE WATER THAT VERR? USED FOR THE SUBSEQUENT BATHROOMS. THE PROJECT WILL ALSO PROVIDE FOR ALL OTHER ACCESSORIES TO STORE THE GREATEST QUANTITY OF WATER POSSIBLE IN ORDER TO OPTIMISE THE AMOUNT OF WATER TO BE RECOVERED ON THE BASIS OF THE AMOUNT OF WORK ON THE FARM. IN ADDITION, ALL ELECTRIC MOTORS WILL BE REPLACED WITH OTHER NEW, HIGHLY PERFORMING NEW ONES, WITH A MINIMUM OF IE3. (English) / rank | |||
Normal rank |
Revision as of 12:42, 23 March 2020
Project in Italy financed by DG Regio
Language | Label | Description | Also known as |
---|---|---|---|
English | (A19_075_2015_0750039_1042) IEPT CHANGES |
Project in Italy financed by DG Regio |
Statements
30,300.0 Euro
0 references
60,600.0 Euro
0 references
50.0 percent
0 references
14 March 2015
0 references
12 December 2018
0 references
14 March 2017
0 references
CAMBI LUIGI E C. S.R.L.
0 references
IL PROGETTO ? RELATIVO ALL'EFFICIENTAMENTO DEL PROCESSO PRODUTTIVO DI TINTURA DELL'AZIENDA CAMBI LUIGI E C SRL. IN PARTICOLARE SI TRATTA DI REALIZZARE UN NUOVO ANELLO ALL'INTERNO DELL'AZIENDA CON LO SCOPO DI RECUPERARE IL CALORE DAL RAFFREDDAMENTO DEI BAGNI DI TINTURA PER PRERISCALDARE L'ACQUA CHE VERR? UTILIZZATA PER I SUCCESSIVI BAGNI. IL PROGETTO PREVEDE ANCHE LA REALIZZAZIONE DI TUTTI GLI ALTRI ACCESSORI UTILI A STOCCARE IL MAGGIOR QUANTITATIVO DI ACQUA POSSIBILE AL FINE DI OTTIMIZZARE IL RECUPERO STESSO IN FUNZIONE DEL QUANTITATIVO DI LAVORO DELL'AZIENDA. INOLTRE A COMPLETAMENTO DI QUESTO INTERVENTO SARANNO SOSTITUITI TUTTI I MOTORI ELETTRICI CON ALTRI NUOVI AD ALTISSIMO RENDIMENTO MARCATI ALMENO IE3. (Italian)
0 references
THE PROJECT? ON THE IMPROVEMENT OF THE EFFICIENCY OF THE PRODUCTION PROCESS OF DYEING THE HOLDING BY LUIGI E SRL. IN PARTICULAR, IS THIS A NEW RING WITHIN THE COMPANY WITH THE AIM OF RECOVERING HEAT FROM THE COOLING OF THE DYE TOILETS TO PREHEAT THE WATER THAT VERR? USED FOR THE SUBSEQUENT BATHROOMS. THE PROJECT WILL ALSO PROVIDE FOR ALL OTHER ACCESSORIES TO STORE THE GREATEST QUANTITY OF WATER POSSIBLE IN ORDER TO OPTIMISE THE AMOUNT OF WATER TO BE RECOVERED ON THE BASIS OF THE AMOUNT OF WORK ON THE FARM. IN ADDITION, ALL ELECTRIC MOTORS WILL BE REPLACED WITH OTHER NEW, HIGHLY PERFORMING NEW ONES, WITH A MINIMUM OF IE3. (English)
0 references
Identifiers
D58I15001960009
0 references