DESIGN TECHNICIAN USING BIM AND PARAMETRIC SOFTWARE (Q1680696): Difference between revisions

From EU Knowledge Graph
Jump to navigation Jump to search
(‎Changed an Item: Label in wikidata changed)
(‎Created claim: summary (P836): BUILDING INFORMATION MODELING AND HIPOS Ê A PROFESSIONAL THAT OPERATES WITHIN THE SCOPE OF INTEGRATED PROJECTS. USE BIM SOFTWARE TO GENERATE GEOMETRIC AND INFORMATIVE MODELS FOR INFORMATION MANAGEMENT DURING THE ENTIRE LIFE CYCLE OF THE PERFORMANCE OF THE CONSTRUCTION WORK. IT THUS CREATES A SMART DIGITAL 3D MODEL OF THIS ASSIGNMENT, THROUGH WHICH IT IS POSSIBLE TO MANAGE ALL THE PROJECT DOCUMENTATION, TO CONTROL THE STATE OF IMPLEMENTATION OF...)
Property / summary
 
BUILDING INFORMATION MODELING AND HIPOS Ê A PROFESSIONAL THAT OPERATES WITHIN THE SCOPE OF INTEGRATED PROJECTS. USE BIM SOFTWARE TO GENERATE GEOMETRIC AND INFORMATIVE MODELS FOR INFORMATION MANAGEMENT DURING THE ENTIRE LIFE CYCLE OF THE PERFORMANCE OF THE CONSTRUCTION WORK. IT THUS CREATES A SMART DIGITAL 3D MODEL OF THIS ASSIGNMENT, THROUGH WHICH IT IS POSSIBLE TO MANAGE ALL THE PROJECT DOCUMENTATION, TO CONTROL THE STATE OF IMPLEMENTATION OF THIS ASSIGNMENT AND TO VERIFY THE PRODUCTION COSTS IN REAL TIME. THE ROUTE PROVIDES FOR A THEORETICAL PERIOD OF THEORETICAL TRAINING, WITH A SPECIALISED CONTENT, OF A TOTAL DURATION OF 425 HOURS AND A TRAINEESHIP OF 6 MONTHS (NO 720 HOURS) FOR A COMMITMENT NOT EXCEEDING 8 HOURS PER DAY AND 120 HOURS PER MONTH, CARRIED OUT IN PRIVATE STRUCTURES (ENTERPRISES, ENTITIES SIMILAR TO THEM), PUBLIC OR PRIVATE RESEARCH CENTRES OR FOUNDATIONS UNDER THE SCOPE OF INTERVENTION IDENTIFIED IN THE PROJECT. (English)
Property / summary: BUILDING INFORMATION MODELING AND HIPOS Ê A PROFESSIONAL THAT OPERATES WITHIN THE SCOPE OF INTEGRATED PROJECTS. USE BIM SOFTWARE TO GENERATE GEOMETRIC AND INFORMATIVE MODELS FOR INFORMATION MANAGEMENT DURING THE ENTIRE LIFE CYCLE OF THE PERFORMANCE OF THE CONSTRUCTION WORK. IT THUS CREATES A SMART DIGITAL 3D MODEL OF THIS ASSIGNMENT, THROUGH WHICH IT IS POSSIBLE TO MANAGE ALL THE PROJECT DOCUMENTATION, TO CONTROL THE STATE OF IMPLEMENTATION OF THIS ASSIGNMENT AND TO VERIFY THE PRODUCTION COSTS IN REAL TIME. THE ROUTE PROVIDES FOR A THEORETICAL PERIOD OF THEORETICAL TRAINING, WITH A SPECIALISED CONTENT, OF A TOTAL DURATION OF 425 HOURS AND A TRAINEESHIP OF 6 MONTHS (NO 720 HOURS) FOR A COMMITMENT NOT EXCEEDING 8 HOURS PER DAY AND 120 HOURS PER MONTH, CARRIED OUT IN PRIVATE STRUCTURES (ENTERPRISES, ENTITIES SIMILAR TO THEM), PUBLIC OR PRIVATE RESEARCH CENTRES OR FOUNDATIONS UNDER THE SCOPE OF INTERVENTION IDENTIFIED IN THE PROJECT. (English) / rank
 
Normal rank

Revision as of 09:36, 20 March 2020

Project in Italy financed by DG Regio
Language Label Description Also known as
English
DESIGN TECHNICIAN USING BIM AND PARAMETRIC SOFTWARE
Project in Italy financed by DG Regio

    Statements

    0 references
    72,893.75 Euro
    0 references
    145,787.5 Euro
    0 references
    50.0 percent
    0 references
    24 September 2017
    0 references
    30 October 2020
    0 references
    MASTER SCHOOL 2000 S.R.L.
    0 references
    Q257720 (Deleted Item)
    0 references
    IL TECNICO DELLA PROGETTAZIONE TRAMITE SOFTWARE BIM (BUILDING INFORMATION MODELING) E PARAMETRICI Ê UN PROFESSIONISTA CHE OPERA NELL¿AMBITO DI PROGETTI INTEGRATI. UTILIZZA IL SOFTWARE BIM PER GENERARE MODELLI GEOMETRICI E INFORMATIVI UTILI PER LA GESTIONE DELLE INFORMAZIONI DURANTE L¿INTERO CICLO DI VITA DELL¿OPERA EDILE. CREA DUNQUE UN MODELLO 3D DIGITALE INTELLIGENTE DELL¿OPERA, GRAZIE AL QUALE Ê POSSIBILE GESTIRE TUTTA LA DOCUMENTAZIONE DI PROGETTO, CONTROLLARE LO STATO DI AVANZAMENTO DELL¿OPERA E VERIFICARE, IN TEMPO REALE, I COSTI DI PRODUZIONE. IL PERCORSO PREVEDE UNA FASE DI FORMAZIONE TEORICA , A CONTENUTO SPECIALISTICO, DELLA DURATA COMPLESSIVA DI N. 425 ORE ED UN TIROCINIO CURRICULARE DI 6 MESI (N. 720 ORE) PER UN IMPEGNO NON SUPERIORE ALLE 8 ORE GIORNALIERE E 120 ORE MENSILI, SVOLTO PRESSO STRUTTURE PRIVATE (IMPRESE, SOGGETTI AD ESSI ASSIMILABILI), CENTRI DI RICERCA PUBBLICI O PRIVATI O FONDAZIONI NELL¿AMBITO DI INTERVENTO INDIVIDUATO NEL PROGETTO. (Italian)
    0 references
    BUILDING INFORMATION MODELING AND HIPOS Ê A PROFESSIONAL THAT OPERATES WITHIN THE SCOPE OF INTEGRATED PROJECTS. USE BIM SOFTWARE TO GENERATE GEOMETRIC AND INFORMATIVE MODELS FOR INFORMATION MANAGEMENT DURING THE ENTIRE LIFE CYCLE OF THE PERFORMANCE OF THE CONSTRUCTION WORK. IT THUS CREATES A SMART DIGITAL 3D MODEL OF THIS ASSIGNMENT, THROUGH WHICH IT IS POSSIBLE TO MANAGE ALL THE PROJECT DOCUMENTATION, TO CONTROL THE STATE OF IMPLEMENTATION OF THIS ASSIGNMENT AND TO VERIFY THE PRODUCTION COSTS IN REAL TIME. THE ROUTE PROVIDES FOR A THEORETICAL PERIOD OF THEORETICAL TRAINING, WITH A SPECIALISED CONTENT, OF A TOTAL DURATION OF 425 HOURS AND A TRAINEESHIP OF 6 MONTHS (NO 720 HOURS) FOR A COMMITMENT NOT EXCEEDING 8 HOURS PER DAY AND 120 HOURS PER MONTH, CARRIED OUT IN PRIVATE STRUCTURES (ENTERPRISES, ENTITIES SIMILAR TO THEM), PUBLIC OR PRIVATE RESEARCH CENTRES OR FOUNDATIONS UNDER THE SCOPE OF INTERVENTION IDENTIFIED IN THE PROJECT. (English)
    0 references

    Identifiers