(A19_093_2016_0930061_1060) ST. MAURITIUS (Q2066488): Difference between revisions
Jump to navigation
Jump to search
(Changed an Item: Label in wikidata changed) |
(Created claim: summary (P836): 1A) THERMAL INSULATION OF OPAQUE VERTICAL STRUCTURES. IN THE EXISTING BUILDING, THERE ARE VARIOUS TYPES OF EXTERNAL WALLS. THE OBJECTIVE IS TO COVER ALL TYPES OF EXTERNAL WALLS OF THE EXISTING BUILDING WITH THE INSTALLATION OF AN OUTER COAT SYSTEM WITH A MAXIMUM USEABLE THICKNESS ON THE BUILDING OF 10 CM. 2A) REPLACEMENT OF WINDOW AND WINDOW FRAMES. IN THE EXISTING BUILDING THERE ARE A NUMBER OF HIGH EFFICIENCY WINDOWS ALREADY IN PLACE LAST YEAR...) |
||
Property / summary | |||
1A) THERMAL INSULATION OF OPAQUE VERTICAL STRUCTURES. IN THE EXISTING BUILDING, THERE ARE VARIOUS TYPES OF EXTERNAL WALLS. THE OBJECTIVE IS TO COVER ALL TYPES OF EXTERNAL WALLS OF THE EXISTING BUILDING WITH THE INSTALLATION OF AN OUTER COAT SYSTEM WITH A MAXIMUM USEABLE THICKNESS ON THE BUILDING OF 10 CM. 2A) REPLACEMENT OF WINDOW AND WINDOW FRAMES. IN THE EXISTING BUILDING THERE ARE A NUMBER OF HIGH EFFICIENCY WINDOWS ALREADY IN PLACE LAST YEAR, BUT ALSO OLD FRAMES WITH ALUMINIUM FRAME AND SIMPLE GLASS FRAME. THE PROJECT IS INTENDED TO REPLACE OLD WINDOW FRAMES WITH ALUMINIUM CUTTING FRAMES, VETROCAMERA AND LOW EMISSION WINDOWS. 3A) REPLACING AIR-CONDITIONING SYSTEMS WITH PLANTS USING HIGH-EFFICIENCY HEAT PUMPS. ARE THERE TWO SEPARATE AUTONOMOUS AND INDEPENDENT SYSTEMS FOR THE PRODUCTION OF WINTER HEATING ENERGY, WITH OLD BOILERS A (English) | |||
Property / summary: 1A) THERMAL INSULATION OF OPAQUE VERTICAL STRUCTURES. IN THE EXISTING BUILDING, THERE ARE VARIOUS TYPES OF EXTERNAL WALLS. THE OBJECTIVE IS TO COVER ALL TYPES OF EXTERNAL WALLS OF THE EXISTING BUILDING WITH THE INSTALLATION OF AN OUTER COAT SYSTEM WITH A MAXIMUM USEABLE THICKNESS ON THE BUILDING OF 10 CM. 2A) REPLACEMENT OF WINDOW AND WINDOW FRAMES. IN THE EXISTING BUILDING THERE ARE A NUMBER OF HIGH EFFICIENCY WINDOWS ALREADY IN PLACE LAST YEAR, BUT ALSO OLD FRAMES WITH ALUMINIUM FRAME AND SIMPLE GLASS FRAME. THE PROJECT IS INTENDED TO REPLACE OLD WINDOW FRAMES WITH ALUMINIUM CUTTING FRAMES, VETROCAMERA AND LOW EMISSION WINDOWS. 3A) REPLACING AIR-CONDITIONING SYSTEMS WITH PLANTS USING HIGH-EFFICIENCY HEAT PUMPS. ARE THERE TWO SEPARATE AUTONOMOUS AND INDEPENDENT SYSTEMS FOR THE PRODUCTION OF WINTER HEATING ENERGY, WITH OLD BOILERS A (English) / rank | |||
Normal rank |
Revision as of 10:41, 23 March 2020
Project in Italy financed by DG Regio
Language | Label | Description | Also known as |
---|---|---|---|
English | (A19_093_2016_0930061_1060) ST. MAURITIUS |
Project in Italy financed by DG Regio |
Statements
94,926.44 Euro
0 references
189,852.88 Euro
0 references
50.0 percent
0 references
1 August 2016
0 references
14 December 2018
0 references
11 January 2019
0 references
VALFIM S.R.L.
0 references
1A) ISOLAMENTO TERMICO DELLE STRUTTURE VERTICALI OPACHE. NELL?EDIFICIO ESISTENTE SONO PRESENTI VARIE TIPOLOGIE DI PARETI ESTERNE. PER RAGGIUNGERE L?OBBIETTIVO SI PREVEDE DI RIVESTIRE TUTTE LE TIPOLOGIE DI PARETI ESTERNE DELL?EDIFICIO ESISTENTE CON LA POSA IN OPERA DI UN SISTEMA A CAPPOTTO ESTERNO CON IL MASSIMO SPESSORE UTILIZZABILE SU QUESTO FABBRICATO DI 10 CM. 2A) SOSTITUZIONE DI SERRAMENTI E INFISSI. NELL?EDIFICIO ESISTENTE SONO PRESENTI UNA SERIE DI INFISSI AD ALTA EFFICIENZA GIA SOSTITUTI LO SCORSO ANNO, MA ANCHE VECCHI INFISSI CON TELAIO IN ALLUMINIO E VETRO SEMPLICE. LL PROGETTO PREVEDE DI SOSTITUIRE I VECCHI INFISSI CON NUOVI CON TELAIO IN ALLUMINIO A TAGLIO TERMICO, VETROCAMERA E VETRI BASSO EMISSIVI. 3A) SOSTITUZIONE DI IMPIANTI DI CLIMATIZZAZIONE CON IMPIANTI ALIMENTATI CON POMPE DI CALORE AD ALTA EFFICIENZA. ATTUALMENTE SONO PRESENTI DUE SISTEMI DISTINTI AUTONOMI E INDIPENDENTI PER LA PRODUZIONE DELL?ENERGIA TERMICA PER IL RISCALDAMENTO INVERNALE, TRAMITE VECCHIE CALDAIE A (Italian)
0 references
1A) THERMAL INSULATION OF OPAQUE VERTICAL STRUCTURES. IN THE EXISTING BUILDING, THERE ARE VARIOUS TYPES OF EXTERNAL WALLS. THE OBJECTIVE IS TO COVER ALL TYPES OF EXTERNAL WALLS OF THE EXISTING BUILDING WITH THE INSTALLATION OF AN OUTER COAT SYSTEM WITH A MAXIMUM USEABLE THICKNESS ON THE BUILDING OF 10 CM. 2A) REPLACEMENT OF WINDOW AND WINDOW FRAMES. IN THE EXISTING BUILDING THERE ARE A NUMBER OF HIGH EFFICIENCY WINDOWS ALREADY IN PLACE LAST YEAR, BUT ALSO OLD FRAMES WITH ALUMINIUM FRAME AND SIMPLE GLASS FRAME. THE PROJECT IS INTENDED TO REPLACE OLD WINDOW FRAMES WITH ALUMINIUM CUTTING FRAMES, VETROCAMERA AND LOW EMISSION WINDOWS. 3A) REPLACING AIR-CONDITIONING SYSTEMS WITH PLANTS USING HIGH-EFFICIENCY HEAT PUMPS. ARE THERE TWO SEPARATE AUTONOMOUS AND INDEPENDENT SYSTEMS FOR THE PRODUCTION OF WINTER HEATING ENERGY, WITH OLD BOILERS A (English)
0 references
Identifiers
D58I16002330009
0 references