Thermomodernisation of public utility facilities in Edlin-Zdrój -Termomodernisation of the building of the City Hall with photovoltaic installation, – Thermomodernisation of the building of the Municipal Junior High School (Q95698): Difference between revisions

From EU Knowledge Graph
Jump to navigation Jump to search
(‎Changed label, description and/or aliases in it, and other parts: Adding Italian translations)
(‎Changed label, description and/or aliases in es, and other parts: Adding Spanish translations)
label / eslabel / es
 
Termomodernización de los servicios públicos en Jedlin-Zdrój — Termomodernización del edificio del Ayuntamiento con instalación fotovoltaica, — Termomodernización del edificio del Gimnasio Municipal
Property / summary
 
Termomodernización de los servicios públicos en Jedlin-Zdrój — Termomodernización del edificio UM junto con la instalación fotovoltaica, — Termomodernización del edificio del Gimnasio Municipal WNIOSKODAWCA: Comuna Jedlina — Zdrój TIAS REAL: 16.03.2016-15.09.2017 GUERRA. PROYECTO: 979.700 zł WAR. DOF: Tarea 1 — Desarrollo de la documentación técnica — enero — marzo de 2016 — Auditoría energética de objetos, — documentación de construcción de objetos Tarea 2 — Termomodernización — Edificio UM y edificio Gim. Lo tengo. El Reglamento consta de cinco subtareas: PZ1. Rob Bud, Rob Bud. — edificio UM — III — VIII 2017 Incluye, entre otros, el calentamiento de las paredes exteriores, el techo del ático, la sustitución de las ventanas de madera antiguas por el nuevo PVC, PZ2. Obras de instalación — edificio UM — III — VIII 2017 Incluye, entre otras cosas, sala de calderas e instalación co. PZ3. Obras de instalación — instalación fotovoltaica — edificio UM — III — VIII 2017 Incluye, entre otros, la construcción de una instalación fotovoltaica con una potencia de 10.1kWp, instalación de un dispositivo de conmutación RPV, instalación de protección contra rayos PZ4. Rob, Bud, edificio Gim. Lo tengo. — III -VIII 2017 Incluye, entre otros: inventario de la condición existente, calentamiento de las paredes del gimnasio y piezas con habitaciones, calentamiento del techo del gimnasio, parcialmente reemplazando las puertas exteriores, reemplazando la ornamentación en la parte calentada. PZ5. Trabajos de instalación — Edificio Gim. Lo tengo. — III — VIII 2017Incluye la sustitución de la caldera de gas. con una nueva condensación con mayor eficiencia. Zad.3 — Supervisión de inversores — XII 2016 — VIII 2017 Incluye, entre otros: cooperación con el solicitante en la preparación de documentación para la adjudicación del contrato público, supervisión del inversor, seguimiento del acuerdo de proyecto en términos de cumplimiento de las tecnologías utilizadas con los proyectos de construcción, realización de tecnología, fin. y adm. supervisión de los trabajos realizados, Zad. 4 — Promoción — Noviembre 2016 — VIII 2017 Incluye: artículos promocionales en la prensa + 2 placas conmemorativas (Spanish)
Property / summary: Termomodernización de los servicios públicos en Jedlin-Zdrój — Termomodernización del edificio UM junto con la instalación fotovoltaica, — Termomodernización del edificio del Gimnasio Municipal WNIOSKODAWCA: Comuna Jedlina — Zdrój TIAS REAL: 16.03.2016-15.09.2017 GUERRA. PROYECTO: 979.700 zł WAR. DOF: Tarea 1 — Desarrollo de la documentación técnica — enero — marzo de 2016 — Auditoría energética de objetos, — documentación de construcción de objetos Tarea 2 — Termomodernización — Edificio UM y edificio Gim. Lo tengo. El Reglamento consta de cinco subtareas: PZ1. Rob Bud, Rob Bud. — edificio UM — III — VIII 2017 Incluye, entre otros, el calentamiento de las paredes exteriores, el techo del ático, la sustitución de las ventanas de madera antiguas por el nuevo PVC, PZ2. Obras de instalación — edificio UM — III — VIII 2017 Incluye, entre otras cosas, sala de calderas e instalación co. PZ3. Obras de instalación — instalación fotovoltaica — edificio UM — III — VIII 2017 Incluye, entre otros, la construcción de una instalación fotovoltaica con una potencia de 10.1kWp, instalación de un dispositivo de conmutación RPV, instalación de protección contra rayos PZ4. Rob, Bud, edificio Gim. Lo tengo. — III -VIII 2017 Incluye, entre otros: inventario de la condición existente, calentamiento de las paredes del gimnasio y piezas con habitaciones, calentamiento del techo del gimnasio, parcialmente reemplazando las puertas exteriores, reemplazando la ornamentación en la parte calentada. PZ5. Trabajos de instalación — Edificio Gim. Lo tengo. — III — VIII 2017Incluye la sustitución de la caldera de gas. con una nueva condensación con mayor eficiencia. Zad.3 — Supervisión de inversores — XII 2016 — VIII 2017 Incluye, entre otros: cooperación con el solicitante en la preparación de documentación para la adjudicación del contrato público, supervisión del inversor, seguimiento del acuerdo de proyecto en términos de cumplimiento de las tecnologías utilizadas con los proyectos de construcción, realización de tecnología, fin. y adm. supervisión de los trabajos realizados, Zad. 4 — Promoción — Noviembre 2016 — VIII 2017 Incluye: artículos promocionales en la prensa + 2 placas conmemorativas (Spanish) / rank
 
Normal rank
Property / summary: Termomodernización de los servicios públicos en Jedlin-Zdrój — Termomodernización del edificio UM junto con la instalación fotovoltaica, — Termomodernización del edificio del Gimnasio Municipal WNIOSKODAWCA: Comuna Jedlina — Zdrój TIAS REAL: 16.03.2016-15.09.2017 GUERRA. PROYECTO: 979.700 zł WAR. DOF: Tarea 1 — Desarrollo de la documentación técnica — enero — marzo de 2016 — Auditoría energética de objetos, — documentación de construcción de objetos Tarea 2 — Termomodernización — Edificio UM y edificio Gim. Lo tengo. El Reglamento consta de cinco subtareas: PZ1. Rob Bud, Rob Bud. — edificio UM — III — VIII 2017 Incluye, entre otros, el calentamiento de las paredes exteriores, el techo del ático, la sustitución de las ventanas de madera antiguas por el nuevo PVC, PZ2. Obras de instalación — edificio UM — III — VIII 2017 Incluye, entre otras cosas, sala de calderas e instalación co. PZ3. Obras de instalación — instalación fotovoltaica — edificio UM — III — VIII 2017 Incluye, entre otros, la construcción de una instalación fotovoltaica con una potencia de 10.1kWp, instalación de un dispositivo de conmutación RPV, instalación de protección contra rayos PZ4. Rob, Bud, edificio Gim. Lo tengo. — III -VIII 2017 Incluye, entre otros: inventario de la condición existente, calentamiento de las paredes del gimnasio y piezas con habitaciones, calentamiento del techo del gimnasio, parcialmente reemplazando las puertas exteriores, reemplazando la ornamentación en la parte calentada. PZ5. Trabajos de instalación — Edificio Gim. Lo tengo. — III — VIII 2017Incluye la sustitución de la caldera de gas. con una nueva condensación con mayor eficiencia. Zad.3 — Supervisión de inversores — XII 2016 — VIII 2017 Incluye, entre otros: cooperación con el solicitante en la preparación de documentación para la adjudicación del contrato público, supervisión del inversor, seguimiento del acuerdo de proyecto en términos de cumplimiento de las tecnologías utilizadas con los proyectos de construcción, realización de tecnología, fin. y adm. supervisión de los trabajos realizados, Zad. 4 — Promoción — Noviembre 2016 — VIII 2017 Incluye: artículos promocionales en la prensa + 2 placas conmemorativas (Spanish) / qualifier
 
point in time: 19 January 2022
Timestamp+2022-01-19T00:00:00Z
Timezone+00:00
CalendarGregorian
Precision1 day
Before0
After0

Revision as of 20:03, 19 January 2022

Project Q95698 in Poland
Language Label Description Also known as
English
Thermomodernisation of public utility facilities in Edlin-Zdrój -Termomodernisation of the building of the City Hall with photovoltaic installation, – Thermomodernisation of the building of the Municipal Junior High School
Project Q95698 in Poland

    Statements

    0 references
    1,050,157.48 zloty
    0 references
    252,037.80 Euro
    13 January 2020
    0 references
    1,235,479.4 zloty
    0 references
    296,515.06 Euro
    13 January 2020
    0 references
    85.0 percent
    0 references
    16 March 2016
    0 references
    30 November 2018
    0 references
    GMINA JEDLINA-ZDRÓJ
    0 references
    0 references
    Termomodernizacja obiektów użyteczności publicznej w Jedlinie-Zdroju- Termomodernizacja budynku UM wraz z instalacją fotowoltaiczną, - Termomodernizacja budynku Gimnazjum Miejskiego WNIOSKODAWCA: Gmina Jedlina - Zdrój CZAS REAL: 16.03.2016 - 15.09.2017 WAR. PROJ.: 979.700 zł WAR. DOF.: 832.744,99 zł Zadanie 1 - Opracowanie dokumentacji technicznej - styczeń - marzec 2016 - audyt energetyczny dla obiektów, - dokumentacja budowlana dla obiektów Zadanie 2 - Termomodernizacja - budynek UM i budynek Gim. Miej. Zad. składa się z 5 podzadań: PZ1. Rob bud. - budynek UM - III - VIII 2017 Obejmują m.in. ocieplenie ścian zew., stropu poddasza nieużytkowego, wymiana starych okien drewnianych na nowe PCV, PZ2. Roboty instalacyjne c.o. - budynek UM - III - VIII 2017 Obejmują m.in. przeb. kotłowni i instalacja co. PZ3. Roboty instalacyjne - instalacja fotowoltaniczna - budynek UM - III - VIII 2017 Obejmują m.in. wykonanie instalacji fotowoltaicznej o mocy 10,1kWp, montaż rozdzielni RPV, instalację ochrony odgromowej PZ4. Rob. bud, - budynek Gim. Miej. - III -VIII 2017 Obejmują m.in.: inwentaryzację stanu istniejącego, ocieplenie ścian zew. sali gimn. i części z salkami dyd., ocieplenie dachu sali gim., częściowo wymiana drzwi zewnętrznych, wymiana orynnowania przy ocieplanej części. PZ5. Roboty instalacyjne c.o. - budynek Gim. Miej. - III - VIII 2017Obejmuje wymianę kotła gaz. o na nowy kondensacyjny o wyższej sprawności. Zad.3 - Nadzór inwestorski - XII 2016 - VIII 2017 Obejmuje m.in.: współpracę z Wnioskodawcą w zakresie przygotowania dokumentacji do udzielenia zamówienia publicznego, nadzór inwestorski, monitorowanie umowy projektu pod względem zgodności stosowanych technologi z projektami budowlanymi, prowadzenie tech., fin. i adm. nadzoru nad prowadzonymi pracami,Zad. 4 - Promocja - XI 2016 - VIII 2017 Obejmuje: artykuły promocyjne w prasie + 2 tablice pamiątkowe (Polish)
    0 references
    Thermomodernisation of public utility facilities in the Egg-Zdrój-Thermomodernisation of the UM building with photovoltaic installation, – Thermomodernisation of the Municipal Junior High School building applicant: Municipality of Jedlina – Zdrój CZAS REAL: 16.03.2016-15.09.2017 WAR. THE PROJECT: PLN 979,700 WAR. DOF.: 832.744,99 zł Task 1 – Development of technical documentation – January – March 2016 – energy audit for buildings, – building documentation for objects Task 2 – Thermomodernisation – UM building and Gim building. Have it. – Yeah. The task consists of 5 subtasks: PZ1. It’s Rob bud. — UM building – III – VIII 2017 Includes, among others, warming of the former walls, the ceiling of the attic, replacement of old wooden windows for new PVC, PZ2. Central heating works – UM building – III – VIII 2017 Includes, among others, the boiler room and the installation of co. PZ3. Installation works – photovoltaic installation – UM building – III – VIII 2017 Includes, among others, the construction of a photovoltaic installation with a capacity of 10.1kWp, installation of RPV switchgear, lightning protection system PZ4. Rob. bud, Gim building. Have it. – Yeah. — III -VIII 2017 Including, among others: inventory of the existing condition, warming of the walls of the gym and parts with halls, warming of the roof of the gym, partly replacing the external doors, replacement of the bar at the warmed part. PZ5. Central heating installation works – Gim building. Have it. – Yeah. — III – VIII 2017 Includes the replacement of a gas boiler. o for a new condensation with higher efficiency. Zad.3 – Investor supervision – XII 2016 – VIII 2017 Includes, among others: cooperation with the Applicant in the field of preparation of documentation for public procurement, investor supervision, monitoring of project contract in terms of compliance of applied technologies with construction projects, conducting tech., fin. and adm. supervision of the work carried out, Zad. 4 – Promotion – XI 2016 – VIII 2017 Includes: promotional articles in the press + 2 commemorative plaques (English)
    15 October 2020
    0 references
    Thermomodernisation des services publics à Jedlin-Zdrój — Thermomodernisation du bâtiment UM avec installation photovoltaïque, — Thermomodernisation du bâtiment du gymnase municipal WNIOSKODAWCA: Commune Jedlina — Zdrój TIAS REAL: 16.03.2016-15.09.2017 GUERRE. PROJET: 979 700 zł TMP. DOF: Tâche 1 — Élaboration de la documentation technique — janvier — mars 2016 — Audit énergétique des objets, — documentation de construction pour les objets Tâche 2 — Thermomodernisation — Bâtiment UM et bâtiment Gim. Je l’ai. Le règlement se compose de cinq sous-tâches: PZ1. Un bourgeon de Rob. — bâtiment UM — III — VIII 2017 Comprend, entre autres, le réchauffement des murs extérieurs, le plafond grenier, le remplacement des vieilles fenêtres en bois par de nouveaux PVC, PZ2. Travaux d’installation — bâtiment UM — III — VIII 2017 Comprend notamment la chaufferie et l’installation co. PZ3. Travaux d’installation — installation photovoltaïque — bâtiment UM — III — VIII 2017 Comprend, entre autres, la construction d’une installation photovoltaïque d’une puissance de 10,1 kWp, l’installation d’un appareillage RPV, l’installation de protection contre la foudre PZ4. Rob. Bud, bâtiment Gim. Je l’ai. — III -VIII 2017 Inclut, entre autres: inventaire de l’état existant, chauffage des murs de la salle de gym et des pièces avec des pièces, chauffage du toit de la salle de gym, en partie remplacement des portes extérieures, remplacement de l’ornementation à la partie chauffée. PZ5. Travaux d’installation — Bâtiment Gim. Je l’ai. — III — VIII 2017Comprend le remplacement de la chaudière à gaz. avec une nouvelle condensation avec un rendement plus élevé. Zad.3 — Surveillance des investisseurs — XII 2016 — VIII 2017 Inclut, entre autres: coopération avec la requérante dans la préparation de la documentation pour l’attribution du marché public, la supervision des investisseurs, le suivi de l’accord de projet en termes de conformité des technologies utilisées avec les projets de construction, la conduite de la technologie, la fin. et la supervision adm. des travaux effectués, Zad. 4 — Promotion — novembre 2016 — VIII 2017 Comprend: articles promotionnels dans la presse + 2 plaques commémoratives (French)
    1 December 2021
    0 references
    Thermomodernisierung öffentlicher Versorgungsbetriebe in Jedlin-Zdrój – Thermomodernisierung des UM-Gebäudes zusammen mit Photovoltaik-Anlagen, – Thermomodernisierung des Gebäudes des städtischen Gymnasiums WNIOSKODAWCA: Gemeinde Jedlina – Zdrój TIAS REAL: 16.03.2016-15.09.2017 KRIEG. PROJEKT: 979.700 zł WAR. DOF: Aufgabe 1 – Entwicklung der technischen Dokumentation – Januar – März 2016 – Energieaudit für Objekte, – Baudokumentation für Objekte Aufgabe 2 – Thermomodernisierung – UM-Gebäude und Gim-Gebäude. Hab’s. Die Verordnung besteht aus 5 Teilaufgaben: PZ1. Rob Bud, Rob Bud. — Gebäude UM – III – VIII 2017 Inklusive u. a. Erwärmung der Außenwände, Dachbodendecke, Ersatz alter Holzfenster mit neuem PVC, PZ2. Installationsarbeiten – Gebäude UM – III – VIII 2017 Inklusive u. a. Kesselraum und Einbau co. PZ3. Installationsarbeiten – Photovoltaik-Anlage – Gebäude UM – III – VIII 2017 umfasst unter anderem den Bau einer Photovoltaikanlage mit einer Leistung von 10,1kWp, Installation einer RPV-Schaltanlage, Blitzschutzanlage PZ4. Rob. Bud, Gim-Gebäude. Hab’s. — III -VIII 2017 umfasst unter anderem: Inventar des bestehenden Zustands, Erwärmung der Wände des Fitnessraums und Teile mit Räumen, Erwärmung des Daches des Fitnessstudios, teilweise Ersatz der Außentüren, Ersatz der Verzierung am warmen Teil. PZ5. Installationsarbeiten – Gim-Gebäude. Hab’s. — III – VIII 2017Beinhaltet den Austausch des Gaskessels durch eine neue Kondensation mit höherer Effizienz. Zad.3 – Investor Supervision – XII 2016 – VIII 2017 umfasst unter anderem: Zusammenarbeit mit dem Antragsteller bei der Vorbereitung der Dokumentation für die Vergabe des öffentlichen Auftrags, Anlegeraufsicht, Überwachung der Projektvereinbarung in Bezug auf die Übereinstimmung der Technologien mit Bauprojekten, Durchführung von Technologie, fin. und adm. Überwachung der durchgeführten Arbeiten, Zad. 4 – Promotion – November 2016 – VIII 2017 umfasst: Werbeartikel in der Presse + 2 Gedenktafeln (German)
    7 December 2021
    0 references
    Thermomodernisering van openbare nutsvoorzieningen in Jedlin-Zdrój — Thermomodernisering van het UM-gebouw samen met fotovoltaïsche installatie — Thermomodernisering van het gebouw van het Gemeentelijk Gymnasium WNIOSKODAWCA: Gemeente Jedlina — Zdrój TIAS REAL: 16.03.2016-15.09.2017 OORLOG. PROJECT: 979.700 zł WAR. DOF: Taak 1 — Ontwikkeling van technische documentatie — januari — maart 2016 — Energieaudit voor objecten, — bouwdocumentatie voor objecten Task 2 — Thermomodernisering — UM-gebouw en Gim-gebouw. Neem het maar. De verordening bestaat uit 5 subtaken: PZ1 Rob Bud, Rob Bud. — gebouw UM — III — VIII 2017 Inclusief onder andere het verwarmen van buitenmuren, zolderplafond, vervanging van oude houten ramen door nieuw PVC, PZ2. Installatiewerkzaamheden — gebouw UM — III — VIII 2017 Inclusief o.a. ketelruimte en installatie co. PZ3. Installatiewerkzaamheden — fotovoltaïsche installatie — gebouw UM — III — VIII 2017 Inclusief onder andere de bouw van een fotovoltaïsche installatie met een vermogen van 10,1kWp, installatie van een RPV-schakelapparatuur, bliksembeveiligingsinstallatie PZ4. Rob. Bud, Gim gebouw. Neem het maar. — III -VIII 2017 omvat onder meer: inventaris van de bestaande staat, opwarming van de muren van de sportschool en delen met kamers, opwarming van het dak van de sportschool, gedeeltelijk vervangen van de buitendeuren, vervanging van de versiering op het verwarmde deel. PZ5. Installatiewerkzaamheden — Gim-gebouw. Neem het maar. — III — VIII 2017Inclusief de vervanging van de gasketel. met een nieuwe condensatie met een hoger rendement. Zad.3 — Investor Supervision — XII 2016 — VIII 2017 Inclusief onder andere: samenwerking met verzoekster bij de voorbereiding van documentatie voor de gunning van de overheidsopdracht, toezicht op investeerders, toezicht op de projectovereenkomst wat betreft de conformiteit van de gebruikte technologieën met betrekking tot bouwprojecten, het uitvoeren van technologie, fin. en toezicht op de uitgevoerde werkzaamheden, Zad. 4 — Promotie — november 2016 — VIII 2017 Inclusief: promotieartikelen in de pers + 2 gedenkplaten (Dutch)
    16 December 2021
    0 references
    Termomodernizzazione dei servizi pubblici a Jedlin-Zdrój — Termomodernizzazione dell'edificio UM insieme all'installazione fotovoltaica, — Termomodernizzazione dell'edificio della Palestra Comunale WNIOSKODAWCA: Comune Jedlina — Zdrój TIAS REAL: 16.03.2016-15.09.2017 GUERRA. PROGETTO: 979 700 zł WAR. DOF: Compito 1 — Sviluppo della documentazione tecnica — gennaio — marzo 2016 — Audit energetico per oggetti, — documentazione di costruzione per oggetti Task 2 — Termomodernizzazione — UM building e Gim building. CE l'hai. Il regolamento si compone di 5 sottocompiti: PZ1. Rob bud, Rob bud. — edificio UM — III — VIII 2017 Include, tra gli altri, riscaldamento delle pareti esterne, soffitto sottotetto, sostituzione di vecchie finestre in legno con nuovo PVC, PZ2. Lavori di installazione — edificio UM — III — VIII 2017 Include tra l'altro locale caldaia e installazione co. PZ3. Lavori di installazione — installazione fotovoltaica — edificio UM — III — VIII 2017 Include, tra gli altri, la costruzione di un impianto fotovoltaico con una potenza di 10.1kWp, l'installazione di un quadro RPV, impianto di protezione contro i fulmini PZ4. Rob. Bud, edificio Gim. CE l'hai. — III -VIII 2017 Include, tra l'altro: inventario delle condizioni esistenti, riscaldamento delle pareti della palestra e parti con stanze, riscaldamento del tetto della palestra, in parte sostituendo le porte esterne, sostituendo l'ornamento nella parte riscaldata. PZ5. Lavori di installazione — Gim building. CE l'hai. — III — VIII 2017Include la sostituzione della caldaia a gas. con una nuova condensazione con maggiore efficienza. Zad.3 — Vigilanza degli investitori — XII 2016 — VIII 2017 Include, tra gli altri: collaborazione con il richiedente nella preparazione della documentazione per l'aggiudicazione dell'appalto pubblico, supervisione degli investitori, monitoraggio dell'accordo di progetto in termini di conformità delle tecnologie utilizzate con i progetti di costruzione, conduzione di tecnologie, fin. e adm. supervisione del lavoro svolto, Zad. 4 — Promozione — Novembre 2016 — VIII 2017 Include: articoli promozionali sulla stampa + 2 targhe commemorative (Italian)
    16 January 2022
    0 references
    Termomodernización de los servicios públicos en Jedlin-Zdrój — Termomodernización del edificio UM junto con la instalación fotovoltaica, — Termomodernización del edificio del Gimnasio Municipal WNIOSKODAWCA: Comuna Jedlina — Zdrój TIAS REAL: 16.03.2016-15.09.2017 GUERRA. PROYECTO: 979.700 zł WAR. DOF: Tarea 1 — Desarrollo de la documentación técnica — enero — marzo de 2016 — Auditoría energética de objetos, — documentación de construcción de objetos Tarea 2 — Termomodernización — Edificio UM y edificio Gim. Lo tengo. El Reglamento consta de cinco subtareas: PZ1. Rob Bud, Rob Bud. — edificio UM — III — VIII 2017 Incluye, entre otros, el calentamiento de las paredes exteriores, el techo del ático, la sustitución de las ventanas de madera antiguas por el nuevo PVC, PZ2. Obras de instalación — edificio UM — III — VIII 2017 Incluye, entre otras cosas, sala de calderas e instalación co. PZ3. Obras de instalación — instalación fotovoltaica — edificio UM — III — VIII 2017 Incluye, entre otros, la construcción de una instalación fotovoltaica con una potencia de 10.1kWp, instalación de un dispositivo de conmutación RPV, instalación de protección contra rayos PZ4. Rob, Bud, edificio Gim. Lo tengo. — III -VIII 2017 Incluye, entre otros: inventario de la condición existente, calentamiento de las paredes del gimnasio y piezas con habitaciones, calentamiento del techo del gimnasio, parcialmente reemplazando las puertas exteriores, reemplazando la ornamentación en la parte calentada. PZ5. Trabajos de instalación — Edificio Gim. Lo tengo. — III — VIII 2017Incluye la sustitución de la caldera de gas. con una nueva condensación con mayor eficiencia. Zad.3 — Supervisión de inversores — XII 2016 — VIII 2017 Incluye, entre otros: cooperación con el solicitante en la preparación de documentación para la adjudicación del contrato público, supervisión del inversor, seguimiento del acuerdo de proyecto en términos de cumplimiento de las tecnologías utilizadas con los proyectos de construcción, realización de tecnología, fin. y adm. supervisión de los trabajos realizados, Zad. 4 — Promoción — Noviembre 2016 — VIII 2017 Incluye: artículos promocionales en la prensa + 2 placas conmemorativas (Spanish)
    19 January 2022
    0 references

    Identifiers

    RPDS.03.03.04-02-0025/16
    0 references