(Created claim: summary (P836): THE PROJECT AS DESCRIBED IN THE ATTACHED REPORTS PROVIDES FOR THE CONSTRUCTION OF THE AIR-CONDITIONING SYSTEM IN THE MEDICAL PALACE IN SERAVEZZA WITH AN EXTENSION OF ABOUT 600 M². IT IS OF USEFUL SURFACE AREA FOR EACH PLAN, AND WHICH DEVELOPS ON TWO PLANES ABOVE THE GROUND. THE PROJECT? INCLUDING THE CONSTRUCTION OF THE TECHNICAL ROOMS OUTSIDE THE BUILDING FOR THE EQUIPMENT FORMING PART OF THE AIR CONDITIONING PLANT AND THE EQUIPMENT AND ALL BUI...) |
||
Property / summary | |||
THE PROJECT AS DESCRIBED IN THE ATTACHED REPORTS PROVIDES FOR THE CONSTRUCTION OF THE AIR-CONDITIONING SYSTEM IN THE MEDICAL PALACE IN SERAVEZZA WITH AN EXTENSION OF ABOUT 600 M². IT IS OF USEFUL SURFACE AREA FOR EACH PLAN, AND WHICH DEVELOPS ON TWO PLANES ABOVE THE GROUND. THE PROJECT? INCLUDING THE CONSTRUCTION OF THE TECHNICAL ROOMS OUTSIDE THE BUILDING FOR THE EQUIPMENT FORMING PART OF THE AIR CONDITIONING PLANT AND THE EQUIPMENT AND ALL BUILDING WORKS NEEDED FOR THE IMPLEMENTATION OF THE PLAN TO ENABLE THE PROJECT TO BE CARRIED OUT? THE CULTURAL CENTRE OF THE CIVIC LIBRARY AND THE EXHIBITION MUSEUM AND MUSEUM OF THE MEDICAL LIBRARY IN ORDER TO BE ABLE TO DRAW ON ITS OWN INTERNAL EXHIBITIONS AND CONFERENCES, IN ADDITION TO THE ENERGY STRUCTURE OF THE STRUCTURE OF THE STRUCTURE, WHICH IS CURRENTLY ONLY ELECTRICALLY HEATED. (English) | |||
Property / summary: THE PROJECT AS DESCRIBED IN THE ATTACHED REPORTS PROVIDES FOR THE CONSTRUCTION OF THE AIR-CONDITIONING SYSTEM IN THE MEDICAL PALACE IN SERAVEZZA WITH AN EXTENSION OF ABOUT 600 M². IT IS OF USEFUL SURFACE AREA FOR EACH PLAN, AND WHICH DEVELOPS ON TWO PLANES ABOVE THE GROUND. THE PROJECT? INCLUDING THE CONSTRUCTION OF THE TECHNICAL ROOMS OUTSIDE THE BUILDING FOR THE EQUIPMENT FORMING PART OF THE AIR CONDITIONING PLANT AND THE EQUIPMENT AND ALL BUILDING WORKS NEEDED FOR THE IMPLEMENTATION OF THE PLAN TO ENABLE THE PROJECT TO BE CARRIED OUT? THE CULTURAL CENTRE OF THE CIVIC LIBRARY AND THE EXHIBITION MUSEUM AND MUSEUM OF THE MEDICAL LIBRARY IN ORDER TO BE ABLE TO DRAW ON ITS OWN INTERNAL EXHIBITIONS AND CONFERENCES, IN ADDITION TO THE ENERGY STRUCTURE OF THE STRUCTURE OF THE STRUCTURE, WHICH IS CURRENTLY ONLY ELECTRICALLY HEATED. (English) / rank | |||
Normal rank |
Revision as of 11:34, 23 March 2020
Project in Italy financed by DG Regio
Language | Label | Description | Also known as |
---|---|---|---|
English | (6621.22072016.122000001_1003) ERDF ROP 2014-2020 — VILLE GARDENS |
Project in Italy financed by DG Regio |
Statements
85,555.4 Euro
0 references
244,444.0 Euro
0 references
35.0 percent
0 references
28 March 2017
0 references
27 February 2021
0 references
27 February 2021
0 references
COMUNE DI SERAVEZZA
0 references
IL PROGETTO COME DESCRITTO NELLE RELAZIONI ALLEGATE PREVEDE LA REALIZZAZIONE DELL'IMPIANTO DI CLIMATIZZAZIONE DEL PALAZZO MEDICEO A SERAVEZZA AVENTE UN ESTENSIONE DI CIRCA 600 MQ. DI SUPERFICIE UTILE PER OGNI PIANO E CHE SI SVILUPPA SU DUE PIANI FUORI TERRA. IL PROGETTO ? COMPRENSIVO DELLA REALIZZAZIONE DEI VANI TECNICI ESTERNI AL PALAZZO PER L'ALLOGGIAMENTO DELLE APPARECCHIATURE COSTITUENTI LA CENTRALE DI CLIMATIZZAZIONE E LA FPO DELLE APPARECCHIATURE E TUTTE LE OPERE EDILIZIE NECESSARIE PER LA REALIZZAZIONE DELLE CANALIZZAZIONI.IL PROGETTO CONSENTIR? AL CENTRO CULTURALE SEDE DELLA BIBLIOTECA CIVICA E POLO ESPOSITIVA E MUSEALE DI PALAZZO MEDICEO DI POTER ALLESTIRE AL SUO INTERNO MOSTRE E CONVEGNI OLTRE A EFFICENTARE DAL PUNTO DI VISTA ENERGETICO LA STRUTTURA ATTUALMENTE SOLO RISCALDATA ELETTRICAMENTE. (Italian)
0 references
THE PROJECT AS DESCRIBED IN THE ATTACHED REPORTS PROVIDES FOR THE CONSTRUCTION OF THE AIR-CONDITIONING SYSTEM IN THE MEDICAL PALACE IN SERAVEZZA WITH AN EXTENSION OF ABOUT 600 M². IT IS OF USEFUL SURFACE AREA FOR EACH PLAN, AND WHICH DEVELOPS ON TWO PLANES ABOVE THE GROUND. THE PROJECT? INCLUDING THE CONSTRUCTION OF THE TECHNICAL ROOMS OUTSIDE THE BUILDING FOR THE EQUIPMENT FORMING PART OF THE AIR CONDITIONING PLANT AND THE EQUIPMENT AND ALL BUILDING WORKS NEEDED FOR THE IMPLEMENTATION OF THE PLAN TO ENABLE THE PROJECT TO BE CARRIED OUT? THE CULTURAL CENTRE OF THE CIVIC LIBRARY AND THE EXHIBITION MUSEUM AND MUSEUM OF THE MEDICAL LIBRARY IN ORDER TO BE ABLE TO DRAW ON ITS OWN INTERNAL EXHIBITIONS AND CONFERENCES, IN ADDITION TO THE ENERGY STRUCTURE OF THE STRUCTURE OF THE STRUCTURE, WHICH IS CURRENTLY ONLY ELECTRICALLY HEATED. (English)
0 references
Identifiers
B88F18000020006