097_ITRI_431_RESIDATION NETWORK OF SMART GRID CONNECTION TO THE SERVICE OF THE TWO BUILDINGS “BUILDING AT SEA” AND “SCHOOLS MIDDLE SCHOOLS” (Q2155087): Difference between revisions
Jump to navigation
Jump to search
(Changed an Item: Label in wikidata changed) |
(Created claim: summary (P836): WITH LÂ OF THE OTHER FUNCTIONAL PART, ACTION 4.3.1, SMART GRID CONNECTION BETWEEN THE BUILDING VIA THE SEA AND THE SECONDARY SCHOOLS, IN THE SERVICE OF THEIR MICROCDS, IS COMPLETE: STORAGE SYSTEMS FOR ENERGY STORAGE; TWO RECHARGING POINTS OF TYPE V2G; PURCHASE OF AN ELECTRIC VEHICLE REPLACING NON-ELECTRIC VEHICLE, Adding English summary) |
||
Property / summary | |||
WITH LÂ OF THE OTHER FUNCTIONAL PART, ACTION 4.3.1, SMART GRID CONNECTION BETWEEN THE BUILDING VIA THE SEA AND THE SECONDARY SCHOOLS, IN THE SERVICE OF THEIR MICROCDS, IS COMPLETE: STORAGE SYSTEMS FOR ENERGY STORAGE; TWO RECHARGING POINTS OF TYPE V2G; PURCHASE OF AN ELECTRIC VEHICLE REPLACING NON-ELECTRIC VEHICLE (English) | |||
Property / summary: WITH LÂ OF THE OTHER FUNCTIONAL PART, ACTION 4.3.1, SMART GRID CONNECTION BETWEEN THE BUILDING VIA THE SEA AND THE SECONDARY SCHOOLS, IN THE SERVICE OF THEIR MICROCDS, IS COMPLETE: STORAGE SYSTEMS FOR ENERGY STORAGE; TWO RECHARGING POINTS OF TYPE V2G; PURCHASE OF AN ELECTRIC VEHICLE REPLACING NON-ELECTRIC VEHICLE (English) / rank | |||
Normal rank |
Revision as of 11:40, 23 March 2020
Project in Italy financed by DG Regio
Language | Label | Description | Also known as |
---|---|---|---|
English | 097_ITRI_431_RESIDATION NETWORK OF SMART GRID CONNECTION TO THE SERVICE OF THE TWO BUILDINGS “BUILDING AT SEA” AND “SCHOOLS MIDDLE SCHOOLS” |
Project in Italy financed by DG Regio |
Statements
120,907.59 Euro
0 references
241,815.18 Euro
0 references
50.0 percent
0 references
28 June 2018
0 references
30 September 2020
0 references
COMUNE DI ITTIRI
0 references
CON L¿ALTRO LOTTO FUNZIONALE, AZIONE 4.3.1, SI REALIZZA LA SMART GRID DI COLLEGAMENTO TRA PALAZZO VIA MARINI E SCUOLE MEDIE, AL SERVIZIO DELLE RISPETTIVE MICROGRID, COMPLETE DI: SISTEMI DI ACCUMULO PER LO STOCCAGGIO DI ENERGIA ; DUE COLONNINE DI RICARICA DEL TIPO V2G; ACQUISTO DI UN VEICOLO ELETTRICO IN SOSTITUZIONE DI QUELLO NON ELETTRICO (Italian)
0 references
WITH LÂ OF THE OTHER FUNCTIONAL PART, ACTION 4.3.1, SMART GRID CONNECTION BETWEEN THE BUILDING VIA THE SEA AND THE SECONDARY SCHOOLS, IN THE SERVICE OF THEIR MICROCDS, IS COMPLETE: STORAGE SYSTEMS FOR ENERGY STORAGE; TWO RECHARGING POINTS OF TYPE V2G; PURCHASE OF AN ELECTRIC VEHICLE REPLACING NON-ELECTRIC VEHICLE (English)
0 references
Identifiers
J47F18000120007
0 references