092_GUSPIDEN_431_INTERVENTI TO DEPLOY MICRO NETWORKS IN THE CITY HALL AND IN THE OFFICES OF VIA TURIN (Q2051978): Difference between revisions

From EU Knowledge Graph
Jump to navigation Jump to search
(‎Changed an Item: Label in wikidata changed)
(‎Created claim: summary (P836): THIS INTERVENTION INVOLVES THE CONSTRUCTION OF A SMART GRID CONNECTING LÂ OF TURIN BUILDING WITH THE CITY HALL TO SERVE THE TWO MICRO-GRIDS, WITH THE FOLLOWING ACTIONS: — INSTALLATION OF RENEWABLE ENERGY INSTALLATIONS AND ACCUMULATION OF RENEWABLE ENERGY; — INSTALLATION OF MANAGEMENT TECHNOLOGIES AND AUTOMATIC CONTROL OF INSTALLATIONS; — A REPLACEMENT OF A PETROL VEHICLE WITH AN ELECTRIC VEHICLE., Adding English summary)
Property / summary
 
THIS INTERVENTION INVOLVES THE CONSTRUCTION OF A SMART GRID CONNECTING LÂ OF TURIN BUILDING WITH THE CITY HALL TO SERVE THE TWO MICRO-GRIDS, WITH THE FOLLOWING ACTIONS: — INSTALLATION OF RENEWABLE ENERGY INSTALLATIONS AND ACCUMULATION OF RENEWABLE ENERGY; — INSTALLATION OF MANAGEMENT TECHNOLOGIES AND AUTOMATIC CONTROL OF INSTALLATIONS; — A REPLACEMENT OF A PETROL VEHICLE WITH AN ELECTRIC VEHICLE. (English)
Property / summary: THIS INTERVENTION INVOLVES THE CONSTRUCTION OF A SMART GRID CONNECTING LÂ OF TURIN BUILDING WITH THE CITY HALL TO SERVE THE TWO MICRO-GRIDS, WITH THE FOLLOWING ACTIONS: — INSTALLATION OF RENEWABLE ENERGY INSTALLATIONS AND ACCUMULATION OF RENEWABLE ENERGY; — INSTALLATION OF MANAGEMENT TECHNOLOGIES AND AUTOMATIC CONTROL OF INSTALLATIONS; — A REPLACEMENT OF A PETROL VEHICLE WITH AN ELECTRIC VEHICLE. (English) / rank
 
Normal rank

Revision as of 09:49, 23 March 2020

Project in Italy financed by DG Regio
Language Label Description Also known as
English
092_GUSPIDEN_431_INTERVENTI TO DEPLOY MICRO NETWORKS IN THE CITY HALL AND IN THE OFFICES OF VIA TURIN
Project in Italy financed by DG Regio

    Statements

    0 references
    241,798.37 Euro
    0 references
    483,596.74 Euro
    0 references
    50.0 percent
    0 references
    23 July 2019
    0 references
    30 December 2020
    0 references
    COMUNE DI GUSPINI
    0 references
    0 references

    39°32'28.82"N, 8°37'59.27"E
    0 references
    L¿INTERVENTO PREVEDE LA REALIZZAZIONE DI UNA SMART GRID CHE COLLEGA L¿EDIFICIO DI VIA TORINO CON IL MUNICIPIO AL SERVIZIO DELLE DUE MICRO GRID, CON I SEGUENTI INTERVENTI: -INSTALLAZIONE DI IMPIANTI DI PRODUZIONE DI ENERGIA RINNOVABILE E RELATIVI ACCUMULI; -INSTALLAZIONE DI TECNOLOGIE DI GESTIONE E CONTROLLO AUTOMATICO DEGLI IMPIANTI; -SOSTITUZIONE DI UN VEICOLO A BENZINA CON UN VEICOLO ELETTRICO. (Italian)
    0 references
    THIS INTERVENTION INVOLVES THE CONSTRUCTION OF A SMART GRID CONNECTING LÂ OF TURIN BUILDING WITH THE CITY HALL TO SERVE THE TWO MICRO-GRIDS, WITH THE FOLLOWING ACTIONS: — INSTALLATION OF RENEWABLE ENERGY INSTALLATIONS AND ACCUMULATION OF RENEWABLE ENERGY; — INSTALLATION OF MANAGEMENT TECHNOLOGIES AND AUTOMATIC CONTROL OF INSTALLATIONS; — A REPLACEMENT OF A PETROL VEHICLE WITH AN ELECTRIC VEHICLE. (English)
    0 references

    Identifiers