Improving the energy efficiency of Reston’s building (Q132213): Difference between revisions

From EU Knowledge Graph
Jump to navigation Jump to search
(‎Changed label, description and/or aliases in it, and other parts: Adding Italian translations)
(‎Changed label, description and/or aliases in es, and other parts: Adding Spanish translations)
label / eslabel / es
 
Mejora de la eficiencia energética del edificio Reston
Property / summary
 
El objetivo principal del proyecto es lograr los mejores parámetros ambientales posibles. El proyecto tiene en cuenta el siguiente ámbito de trabajo de modernización: —Calentamiento de paredes exteriores -Aislamiento de almacenamiento -Calefacción del techo bajo un ático no calentado -Reemplazo de ventanas -Reemplazo de puertas y puertas exteriores, tabiques transparentes -Modernización del sistema de calefacción central con la sustitución de una fuente de calor -Modernización de la instalación de agua caliente- Sustitución de calentadores de agua capacitiva eléctrica por nuevos conductos de distribución -Modernización del sistema de ventilación -Modernización de instalaciones de iluminación interior — Instalación de paneles fotovoltaicos, con una potencia de 6,6 kW, 20 piezas con una potencia de 330 W cada una. El proyecto es coherente con los supuestos establecidos en el SzOOP ROP WiM para 4. Eje prioritario: —Índice de consumo de energía renovable — 99,09 % — Aumento de la eficiencia energética — 56,54 % — Reducción de CO2-99,527 % — Evitación de emisiones de CO2-38.912 Mg/año. El proyecto crea una lista de indicadores de resultados directos presentados por SzOOP: —producción de energía térmica a partir de instalaciones de FER de nueva construcción — 52,73 MWht/año — Producción de electricidad procedente de instalaciones de FER de nueva construcción — 6,87 MW/año — cantidad de electricidad ahorrada — 4,44 MWh/año — cantidad de calor ahorrada — 265,68 GJ/año Lista de indicadores de producción generados por el proyecto: —Número de empresas que reciben ayuda — 1 PC. —Capacidad adicional de generación de energía renovable — 0,05 MW — Reducción anual estimada de las emisiones de gases de efecto invernadero- 38,91 MgCO2/año — Número de unidades generadoras de electricidad de fuentes de energía renovables construidas — 1 pcs. —Número de unidades generadoras de calor de FER construidas — 1 PC. Con la implementación de la nueva tecnología, la energía final se reducirá de 497,09 GJ/año a 216,49 GJ/año. Los costes de mantenimiento de la instalación en el estado actual ascienden a 24.426,52 PLN, tras la modernización de 9 581,22 PLN. (Spanish)
Property / summary: El objetivo principal del proyecto es lograr los mejores parámetros ambientales posibles. El proyecto tiene en cuenta el siguiente ámbito de trabajo de modernización: —Calentamiento de paredes exteriores -Aislamiento de almacenamiento -Calefacción del techo bajo un ático no calentado -Reemplazo de ventanas -Reemplazo de puertas y puertas exteriores, tabiques transparentes -Modernización del sistema de calefacción central con la sustitución de una fuente de calor -Modernización de la instalación de agua caliente- Sustitución de calentadores de agua capacitiva eléctrica por nuevos conductos de distribución -Modernización del sistema de ventilación -Modernización de instalaciones de iluminación interior — Instalación de paneles fotovoltaicos, con una potencia de 6,6 kW, 20 piezas con una potencia de 330 W cada una. El proyecto es coherente con los supuestos establecidos en el SzOOP ROP WiM para 4. Eje prioritario: —Índice de consumo de energía renovable — 99,09 % — Aumento de la eficiencia energética — 56,54 % — Reducción de CO2-99,527 % — Evitación de emisiones de CO2-38.912 Mg/año. El proyecto crea una lista de indicadores de resultados directos presentados por SzOOP: —producción de energía térmica a partir de instalaciones de FER de nueva construcción — 52,73 MWht/año — Producción de electricidad procedente de instalaciones de FER de nueva construcción — 6,87 MW/año — cantidad de electricidad ahorrada — 4,44 MWh/año — cantidad de calor ahorrada — 265,68 GJ/año Lista de indicadores de producción generados por el proyecto: —Número de empresas que reciben ayuda — 1 PC. —Capacidad adicional de generación de energía renovable — 0,05 MW — Reducción anual estimada de las emisiones de gases de efecto invernadero- 38,91 MgCO2/año — Número de unidades generadoras de electricidad de fuentes de energía renovables construidas — 1 pcs. —Número de unidades generadoras de calor de FER construidas — 1 PC. Con la implementación de la nueva tecnología, la energía final se reducirá de 497,09 GJ/año a 216,49 GJ/año. Los costes de mantenimiento de la instalación en el estado actual ascienden a 24.426,52 PLN, tras la modernización de 9 581,22 PLN. (Spanish) / rank
 
Normal rank
Property / summary: El objetivo principal del proyecto es lograr los mejores parámetros ambientales posibles. El proyecto tiene en cuenta el siguiente ámbito de trabajo de modernización: —Calentamiento de paredes exteriores -Aislamiento de almacenamiento -Calefacción del techo bajo un ático no calentado -Reemplazo de ventanas -Reemplazo de puertas y puertas exteriores, tabiques transparentes -Modernización del sistema de calefacción central con la sustitución de una fuente de calor -Modernización de la instalación de agua caliente- Sustitución de calentadores de agua capacitiva eléctrica por nuevos conductos de distribución -Modernización del sistema de ventilación -Modernización de instalaciones de iluminación interior — Instalación de paneles fotovoltaicos, con una potencia de 6,6 kW, 20 piezas con una potencia de 330 W cada una. El proyecto es coherente con los supuestos establecidos en el SzOOP ROP WiM para 4. Eje prioritario: —Índice de consumo de energía renovable — 99,09 % — Aumento de la eficiencia energética — 56,54 % — Reducción de CO2-99,527 % — Evitación de emisiones de CO2-38.912 Mg/año. El proyecto crea una lista de indicadores de resultados directos presentados por SzOOP: —producción de energía térmica a partir de instalaciones de FER de nueva construcción — 52,73 MWht/año — Producción de electricidad procedente de instalaciones de FER de nueva construcción — 6,87 MW/año — cantidad de electricidad ahorrada — 4,44 MWh/año — cantidad de calor ahorrada — 265,68 GJ/año Lista de indicadores de producción generados por el proyecto: —Número de empresas que reciben ayuda — 1 PC. —Capacidad adicional de generación de energía renovable — 0,05 MW — Reducción anual estimada de las emisiones de gases de efecto invernadero- 38,91 MgCO2/año — Número de unidades generadoras de electricidad de fuentes de energía renovables construidas — 1 pcs. —Número de unidades generadoras de calor de FER construidas — 1 PC. Con la implementación de la nueva tecnología, la energía final se reducirá de 497,09 GJ/año a 216,49 GJ/año. Los costes de mantenimiento de la instalación en el estado actual ascienden a 24.426,52 PLN, tras la modernización de 9 581,22 PLN. (Spanish) / qualifier
 
point in time: 18 January 2022
Timestamp+2022-01-18T00:00:00Z
Timezone+00:00
CalendarGregorian
Precision1 day
Before0
After0

Revision as of 21:30, 18 January 2022

Project Q132213 in Poland
Language Label Description Also known as
English
Improving the energy efficiency of Reston’s building
Project Q132213 in Poland

    Statements

    0 references
    491,485.16 zloty
    0 references
    117,956.44 Euro
    13 January 2020
    0 references
    578,217.84 zloty
    0 references
    138,772.28 Euro
    13 January 2020
    0 references
    85.0 percent
    0 references
    1 July 2019
    0 references
    30 June 2020
    0 references
    RESTON, MAREK SADOWSKI
    0 references
    0 references

    54°15'20.9"N, 20°48'24.5"E
    0 references
    Głównym celem projektu jest osiągnięcie jak najlepszych parametrów środowiskowych. W projekcie uwzględniono następujący zakres prac modernizacyjnych: -Docieplenie ścian zewnętrznych -Docieplenie stropodachu -Docieplenie stropu pod nieogrzewanym poddaszem -Wymiana okien -Wymiana drzwi i bram zewnętrznych, przegród przezroczystych -Modernizacja instalacji centralnego ogrzewania wraz z wymianą źródła ciepła -Modernizacja instalacji ciepłej wody użytkowej- wymiana elektrycznych pojemnościowych ogrzewaczy wody na nowe, wymiana przewodów rozprowadzających -Modernizacja systemu wentylacji -Modernizacja instalacji oświetlenia wewnętrznego -Montaż paneli fotowoltaicznych, o mocy 6,6 kW, sztuk 20 o mocy 330 W każdy. Projekt wpisuje się w założenia określonej w SzOOP RPO WiM dla 4. Osi Priorytetowej: -Wskaźnik wykorzystania energii odnawialnej – 99,09% -Zwiększona efektywność energetyczna – 56,54% -Redukcja CO2 – 99,527% -Uniknięta emisja zanieczyszczeń CO2 – 38,912 Mg/rok. Projekt kreuje listę wskaźników rezultatu bezpośredniego, którą prezentuje SzOOP: -produkcję energii cieplnej z nowo wybudowanych instalacji wykorzystujących OZE – 52,73 MWht/rok -produkcję energii elektrycznej z nowo wybudowanych instalacji wykorzystujących OZE – 6,87MWhe/rok -ilość zaoszczędzonej energii elektrycznej – 4,14 MWh/rok -ilość zaoszczędzonej energii cieplnej – 265,68 GJ/rok Lista wskaźników produktu generowanych przez projekt: -Liczba przedsiębiorstw otrzymujących wsparcie- 1 szt. -Dodatkowa zdolność wytwarzania energii ze źródeł odnawialnych- 0,05 MW -Szacowany roczny spadek emisji gazów cieplarnianych- 38,91 MgCO2/rok -Liczba wybudowanych jednostek wytwarzania energii elektrycznej z OZE- 1szt. -Liczba wybudowanych jednostek wytwarzania energii cieplnej z OZE- 1szt. Dzięki wdrożeniu nowej technologii zmniejszeniu ulegnie energia końcowa z 497,09 GJ/rok do 216,49 GJ/rok. Koszty utrzymania obiektu w stanie istniejącym wynoszą 24 426,52 zł, po modernizacji 9 581,22 zł. (Polish)
    0 references
    The main objective of the project is to achieve the best environmental parameters possible. The project takes into account the following scope of modernisation work: —Increasing of external walls -Hotification of ceilings -Hotification of the ceiling under unheated attic – Window exchange – Replacement of doors and external gates, transparent partitions -Modernisation of central heating system with heat source exchange -Modernisation of power units of hot water systems – replacement of electric water heaters for new, replacement of distribution cables -Modernisation of ventilation system -Modernisation of internal heating systems -Modernisation of internal heating systems -Modernisation of internal heating systems -Modernisation of internal ventilation system -Modernisation of internal heating systems -Modernisation of internal heating systems -Modernisation of internal heating systems -Modernisation of internal heating systems -Modernisation of internal heating systems -Modernisation of internal heating systems -Modernisation of internal heating systems -Modernation of internal heating systems -Modernisation of internal heating systems -Modernation of internal heating systems -Modernation of internal heating systems -Modernisation of internal heating systems -Modernisation of internal heating systems -Modernisation of internal heating systems -Modernisation of internal heating systems -Modernation of internal heating systems -Modernisation of internal heating system -Modernisation of internal heating system -Modernisation of internal heating system -Modernisation of internal heating system -Modernisation of internal heating system -Modernisation of internal heating system -Modernisation of internal heating system -Modernisation of internal heating system -Modernisation of internal heating systems -Modernisation of internal heating systems -Modernisation of internal heating systems -Modernation of internal heating systems -Modernisation of internal heating systems -Modernisation of the internal heating system -Modernisation of internal ventilation system -Modernisation of internal The project fits into the assumption specified in the SzOOP RPO WiM for 4. Priority axis: —Renewable energy consumption index – 99.09 % – Increased energy efficiency – 56,54 % – CO2-99.527 % reduction – Avoid emissions of CO2-38.912 Mg/year. The project creates a list of direct result indicators presented by the Shoop: —heat energy production from newly built RES installations – 52,73 MWht/year – production of electricity from newly built RES installations – 6,87MWhe/year -quantity of saved electricity – 4,14 MWh/year -quantity of heat saved – 265,68 GJ/year List of product indicators generated by the project: —Number of enterprises receiving support – 1 units. —Additional power generation capacity from renewable sources – 0.05 MW – Estimated annual reduction in greenhouse gas emissions – 38,91 MgCO2/year -Number of built electricity generation units from RES- 1pcs. —Number of built units of heat generation from RES – 1pcs. The implementation of the new technology will reduce final energy from 497.09 GJ/year to 216.49 GJ/year. The maintenance costs of the facility in the existing state amount to PLN 24 426.52, after modernisation of PLN 9 581.22. (English)
    21 October 2020
    0 references
    L’objectif principal du projet est d’atteindre les meilleurs paramètres environnementaux possibles. Le projet tient compte des travaux de modernisation suivants: —Réchauffement des murs extérieurs -Isolation de stockage -Chauffage du plafond sous un grenier non chauffé -Remplacement des fenêtres -Remplacement des portes et des portes extérieures, cloisons transparentes -Modernisation du système de chauffage central avec le remplacement d’une source de chaleur -Modernisation de l’installation d’eau chaude- remplacement des chauffe-eau capacitifs électriques par de nouveaux conduits de distribution -Modernisation du système de ventilation -Modernisation des installations d’éclairage intérieur — Installation de panneaux photovoltaïques, d’une puissance de 6,6 kW, 20 pièces d’une puissance de 330 W chacun. Le projet est conforme aux hypothèses énoncées dans la norme SzOOP ROP WiM pour 4. Axe prioritaire: —Indice de consommation d’énergie renouvelable — 99,09 % — Amélioration de l’efficacité énergétique — 56,54 % — réduction des émissions de CO2-99,527 % — Émissions évitées de CO2-38.912 Mg/an. Le projet crée une liste d’indicateurs de résultats directs présentés par SzOOP: —production d’énergie thermique à partir d’installations SER nouvellement construites — 52,73 MWh/an — Production d’électricité à partir d’installations SER nouvellement construites — 6,87MWhe/an — quantité d’électricité économisée — 4,44 MWh/an — quantité de chaleur économisée — 265,68 GJ/an Liste des indicateurs de production générés par le projet: —Nombre d’entreprises bénéficiant d’un soutien — 1 PCs. —Capacité supplémentaire de production d’énergie renouvelable — 0,05 MW — Réduction annuelle estimée des émissions de gaz à effet de serre- 38,91 MgCO2/an — Nombre d’unités de production d’électricité SER construites — 1 pcs. —Nombre d’unités de production de chaleur SER construites — 1 pcs. Avec la mise en œuvre de la nouvelle technologie, l’énergie finale sera réduite de 497,09 GJ/an à 216,49 GJ/an. Les coûts d’entretien de l’installation dans l’État actuel s’élèvent à 24 426,52 PLN, après modernisation de 9 581,22 PLN. (French)
    2 December 2021
    0 references
    Hauptziel des Projekts ist es, die bestmöglichen Umweltparameter zu erreichen. Das Projekt berücksichtigt den folgenden Umfang der Modernisierungsarbeiten: —Erwärmung der Außenwände -Lagerdämmung -Heizung der Decke unter einem unbeheizten Dachboden -Ersatz von Fenstern -Ersatz von Türen und Außentüren, transparente Trennwände -Modernisierung der Zentralheizung durch den Austausch einer Wärmequelle -Modernisierung der Warmwasserinstallation- Ersatz von elektrischen kapazitiven Warmwasserbereitern durch neue Verteilerkanäle -Modernisierung des Lüftungssystems -Modernisierung der Raumbeleuchtungsanlagen – Installation von Photovoltaik-Panels, mit einer Leistung von 6,6 kW, 20 Stück mit einer Leistung von je 330 W. Das Projekt steht im Einklang mit den Annahmen des SzOOP ROP WiM für 4. Prioritätsachse: —Renewable Energy Use Index – 99,09 % – Erhöhte Energieeffizienz – 56,54 % – CO2-Reduktion-99,527 % – Vermeidung von CO2-38,912 Mg/Jahr. Das Projekt erstellt eine Liste der von SzOOP vorgestellten direkten Ergebnisindikatoren: —Erzeugung von Wärmeenergie aus neu gebauten EE-Anlagen – 52,73 MWht/Jahr – Erzeugung von Strom aus neu gebauten EE-Anlagen – 6,87 MWh/Jahr – eingesparte Strommenge – 4,44 MWh/Jahr – Wärmeeinsparung – 265,68 GJ/Jahr Liste der im Rahmen des Projekts generierten Outputindikatoren: —Anzahl der Unternehmen, die Unterstützung erhalten – 1 Stk. Zusätzliche Erzeugungskapazität für erneuerbare Energien – 0,05 MW – Geschätzte jährliche Verringerung der Treibhausgasemissionen – 38,91 MgCO2/Jahr – Anzahl der gebauten EE-Stromerzeugungseinheiten – 1 Stk. —Anzahl der gebauten Wärmeerzeugungsanlagen aus erneuerbaren Quellen – 1 Stk. Mit der Einführung der neuen Technologie wird die Endenergie von 497.09 GJ/Jahr auf 216.49 GJ/Jahr reduziert. Die Kosten für die Instandhaltung der Anlage im bestehenden Staat belaufen sich nach Modernisierung von 9581.22 PLN auf 24 446,52 PLN. (German)
    9 December 2021
    0 references
    Het belangrijkste doel van het project is het bereiken van de best mogelijke milieuparameters. Het project houdt rekening met de volgende reikwijdte van de moderniseringswerkzaamheden: —Verwarming van buitenmuren -Opslagisolatie -Verwarming van het plafond onder een onverwarmde zolder -Vervanging van ramen -Vervanging van deuren en buitendeuren, transparante scheidingswanden -Modernisering van het centrale verwarmingssysteem met vervanging van een warmtebron -Modernisering van de warmwaterinstallatie- vervanging van elektrische capacitieve waterverwarmingstoestellen door nieuwe distributiekanalen -Modernisering van het ventilatiesysteem -Modernisering van binnenverlichtingsinstallaties — Installatie van fotovoltaïsche panelen, met een vermogen van 6,6 kW, 20 stuks met een vermogen van 330 W elk. Het project is in overeenstemming met de veronderstellingen in de SzOOP ROP WiM voor 4. Prioritaire as: —Index voor het gebruik van hernieuwbare energie — 99,09 % — Verhoogde energie-efficiëntie — 56,54 % — CO2-reductie-99,527 % — Vermijde CO2-uitstoot van 38,912 Mg/jaar. Het project maakt een lijst van directe resultaatindicatoren gepresenteerd door SzOOP: —productie van thermische energie uit nieuw gebouwde RES-installaties — 52,73 MWht/jaar — Productie van elektriciteit uit nieuw gebouwde RES-installaties — 6,87MWhe/jaar — bespaarde hoeveelheid elektriciteit — 4,44 MWh/jaar — hoeveelheid bespaarde warmte — 265,68 GJ/jaar Lijst van door het project gegenereerde outputindicatoren: —Aantal ondernemingen dat steun ontvangt — 1 pc. —Extra capaciteit voor de opwekking van hernieuwbare energie — 0,05 MW — Geraamde jaarlijkse vermindering van broeikasgasemissies- 38,91 MgCO2/jaar — Aantal gebouwde elektriciteitsproductie-eenheden uit hernieuwbare bronnen — 1 pc. —Aantal RES-warmtegeneratoren gebouwd — 1 st. Met de invoering van de nieuwe technologie zal de eindenergie worden teruggebracht van 497,09 GJ/jaar tot 216,49 GJ/jaar. De kosten voor het onderhoud van de faciliteit in de bestaande staat bedragen 24 426,52 PLN, na modernisering van 9 581,22 PLN. (Dutch)
    17 December 2021
    0 references
    L'obiettivo principale del progetto è quello di raggiungere i migliori parametri ambientali possibili. Il progetto tiene conto della seguente portata dei lavori di modernizzazione: —Riscaldamento delle pareti esterne — Isolamento di stoccaggio -Riscaldamento del soffitto sotto una soffitta non riscaldata -Sostituzione di finestre -Sostituzione di porte e porte esterne, divisori trasparenti -Modernizzazione del sistema di riscaldamento centrale con la sostituzione di una fonte di calore -Modernizzazione dell'impianto di acqua calda- sostituzione di scaldacqua capacitivi elettrici con nuovi condotti di distribuzione -Modernizzazione del sistema di ventilazione -Modernizzazione degli impianti di illuminazione interna — Installazione di pannelli fotovoltaici, con una potenza di 6,6 kW, 20 pezzi con una potenza di 330 W ciascuno. Il progetto è coerente con le ipotesi esposte nel ROP SzOOP WiM per 4. Asse prioritario: —Indice di consumo di energia rinnovabile — 99,09 % — Aumento dell'efficienza energetica — 56,54 % — Riduzione di CO2-99,527 % — Emissioni evitate di CO2-38.912 Mg/anno. Il progetto crea un elenco di indicatori di risultato diretti presentati da SzOOP: —produzione di energia termica da impianti FER di nuova costruzione — 52,73 MWht/anno — Produzione di energia elettrica da impianti FER di nuova costruzione — 6,87 MW/anno — quantità di energia elettrica risparmiata — 4,44 MWh/anno — quantità di calore risparmiato — 265,68 GJ/anno Elenco degli indicatori di output generati dal progetto: —Numero di imprese che ricevono sostegno — 1 pc. —Capacità supplementare di generazione di energia rinnovabile — 0,05 MW — Riduzione annua stimata delle emissioni di gas a effetto serra- 38,91 MgCO2/anno — Numero di unità di produzione di energia elettrica da fonti rinnovabili costruite — 1 pz. —Numero di unità generatrici di calore RES costruite — 1 pz. Con l'implementazione della nuova tecnologia, l'energia finale sarà ridotta da 497,09 GJ/anno a 216,49 GJ/anno. I costi di manutenzione dell'impianto nello Stato esistente ammontano a 24 426,52 PLN, dopo l'ammodernamento di 9 581,22 PLN. (Italian)
    15 January 2022
    0 references
    El objetivo principal del proyecto es lograr los mejores parámetros ambientales posibles. El proyecto tiene en cuenta el siguiente ámbito de trabajo de modernización: —Calentamiento de paredes exteriores -Aislamiento de almacenamiento -Calefacción del techo bajo un ático no calentado -Reemplazo de ventanas -Reemplazo de puertas y puertas exteriores, tabiques transparentes -Modernización del sistema de calefacción central con la sustitución de una fuente de calor -Modernización de la instalación de agua caliente- Sustitución de calentadores de agua capacitiva eléctrica por nuevos conductos de distribución -Modernización del sistema de ventilación -Modernización de instalaciones de iluminación interior — Instalación de paneles fotovoltaicos, con una potencia de 6,6 kW, 20 piezas con una potencia de 330 W cada una. El proyecto es coherente con los supuestos establecidos en el SzOOP ROP WiM para 4. Eje prioritario: —Índice de consumo de energía renovable — 99,09 % — Aumento de la eficiencia energética — 56,54 % — Reducción de CO2-99,527 % — Evitación de emisiones de CO2-38.912 Mg/año. El proyecto crea una lista de indicadores de resultados directos presentados por SzOOP: —producción de energía térmica a partir de instalaciones de FER de nueva construcción — 52,73 MWht/año — Producción de electricidad procedente de instalaciones de FER de nueva construcción — 6,87 MW/año — cantidad de electricidad ahorrada — 4,44 MWh/año — cantidad de calor ahorrada — 265,68 GJ/año Lista de indicadores de producción generados por el proyecto: —Número de empresas que reciben ayuda — 1 PC. —Capacidad adicional de generación de energía renovable — 0,05 MW — Reducción anual estimada de las emisiones de gases de efecto invernadero- 38,91 MgCO2/año — Número de unidades generadoras de electricidad de fuentes de energía renovables construidas — 1 pcs. —Número de unidades generadoras de calor de FER construidas — 1 PC. Con la implementación de la nueva tecnología, la energía final se reducirá de 497,09 GJ/año a 216,49 GJ/año. Los costes de mantenimiento de la instalación en el estado actual ascienden a 24.426,52 PLN, tras la modernización de 9 581,22 PLN. (Spanish)
    18 January 2022
    0 references

    Identifiers

    RPWM.04.02.00-28-0071/18
    0 references