Thermal modernisation, modernisation and overhaul of the Kornel Makuszyński Primary School in Łańcuchów (Q105418): Difference between revisions
Jump to navigation
Jump to search
(Changed label, description and/or aliases in it, and other parts: Adding Italian translations) |
(Changed label, description and/or aliases in es, and other parts: Adding Spanish translations) |
||||||||||||||
label / es | label / es | ||||||||||||||
Termomodernización, modernización y renovación importante de la Escuela Primaria Kornel Makuszyński en Chainów | |||||||||||||||
Property / summary | |||||||||||||||
Como parte del proyecto, el solicitante planificó una inversión consistente en la termomodernización del edificio de la Escuela Primaria en Cadena ubicada en el Municipio de Milejów. El objetivo principal del proyecto es mejorar la calidad de los servicios sociales prestados mediante la mejora de la eficiencia energética en los edificios públicos. La inversión logrará un aumento de la eficiencia energética del edificio en un 46,43 %. Alcance de las obras resultantes de la auditoría energética: Modernización de los tabiques DZ 1-acero ‘Ventilación por gravedad’ Modernización de los tabiques DZ 3-caldera de acero ‘Ventilación por gravedad’ Modernización del sistema de agua caliente Modernización del tabique Techo externo Modernización de la partición Techo externo Modernización de los tabiques Pared exterior Modernización de los tabiques Modernización de los tabiques Modernización de los tabiques Modernización de los tabiques Modernización de los tabiques Modernización de los tabiques Modernización de los tabiques Dach Modernización del sistema de calefacción Otras obras de construcción relacionadas con el aislamiento térmico de la fotomodernización de la planta. 1. Cantidad de energía ahorrada cieplnej:430,60 GJ/año 2. Producción de electricidad de nueva construcción/nueva capacidad de generación de instalaciones FER — MWht/tok 11.14 3. Reducción anual estimada de las emisiones de gases de efecto invernadero de 38,58 toneladas de CO2/año. 4 Producción de electricidad a partir de la capacidad de generación de nuevas instalaciones de FER — MWht/tok 11,14 5. Producción de energía térmica a partir de la capacidad de nueva construcción/nueva generación de instalaciones que utilizan FER: 26,60 MWh/año. 6 Producción de electricidad a partir de una nueva capacidad de generación de instalaciones FER — MWht/tok 11,14 7. Producción de energía térmica a partir de la capacidad de generación de nuevas instalaciones de FER — MWht/tok 26,60 MWh/año. 8. Reducción del consumo de energía primaria en edificios públicos- kwh/año 160838.33 (Spanish) | |||||||||||||||
Property / summary: Como parte del proyecto, el solicitante planificó una inversión consistente en la termomodernización del edificio de la Escuela Primaria en Cadena ubicada en el Municipio de Milejów. El objetivo principal del proyecto es mejorar la calidad de los servicios sociales prestados mediante la mejora de la eficiencia energética en los edificios públicos. La inversión logrará un aumento de la eficiencia energética del edificio en un 46,43 %. Alcance de las obras resultantes de la auditoría energética: Modernización de los tabiques DZ 1-acero ‘Ventilación por gravedad’ Modernización de los tabiques DZ 3-caldera de acero ‘Ventilación por gravedad’ Modernización del sistema de agua caliente Modernización del tabique Techo externo Modernización de la partición Techo externo Modernización de los tabiques Pared exterior Modernización de los tabiques Modernización de los tabiques Modernización de los tabiques Modernización de los tabiques Modernización de los tabiques Modernización de los tabiques Modernización de los tabiques Dach Modernización del sistema de calefacción Otras obras de construcción relacionadas con el aislamiento térmico de la fotomodernización de la planta. 1. Cantidad de energía ahorrada cieplnej:430,60 GJ/año 2. Producción de electricidad de nueva construcción/nueva capacidad de generación de instalaciones FER — MWht/tok 11.14 3. Reducción anual estimada de las emisiones de gases de efecto invernadero de 38,58 toneladas de CO2/año. 4 Producción de electricidad a partir de la capacidad de generación de nuevas instalaciones de FER — MWht/tok 11,14 5. Producción de energía térmica a partir de la capacidad de nueva construcción/nueva generación de instalaciones que utilizan FER: 26,60 MWh/año. 6 Producción de electricidad a partir de una nueva capacidad de generación de instalaciones FER — MWht/tok 11,14 7. Producción de energía térmica a partir de la capacidad de generación de nuevas instalaciones de FER — MWht/tok 26,60 MWh/año. 8. Reducción del consumo de energía primaria en edificios públicos- kwh/año 160838.33 (Spanish) / rank | |||||||||||||||
Normal rank | |||||||||||||||
Property / summary: Como parte del proyecto, el solicitante planificó una inversión consistente en la termomodernización del edificio de la Escuela Primaria en Cadena ubicada en el Municipio de Milejów. El objetivo principal del proyecto es mejorar la calidad de los servicios sociales prestados mediante la mejora de la eficiencia energética en los edificios públicos. La inversión logrará un aumento de la eficiencia energética del edificio en un 46,43 %. Alcance de las obras resultantes de la auditoría energética: Modernización de los tabiques DZ 1-acero ‘Ventilación por gravedad’ Modernización de los tabiques DZ 3-caldera de acero ‘Ventilación por gravedad’ Modernización del sistema de agua caliente Modernización del tabique Techo externo Modernización de la partición Techo externo Modernización de los tabiques Pared exterior Modernización de los tabiques Modernización de los tabiques Modernización de los tabiques Modernización de los tabiques Modernización de los tabiques Modernización de los tabiques Modernización de los tabiques Dach Modernización del sistema de calefacción Otras obras de construcción relacionadas con el aislamiento térmico de la fotomodernización de la planta. 1. Cantidad de energía ahorrada cieplnej:430,60 GJ/año 2. Producción de electricidad de nueva construcción/nueva capacidad de generación de instalaciones FER — MWht/tok 11.14 3. Reducción anual estimada de las emisiones de gases de efecto invernadero de 38,58 toneladas de CO2/año. 4 Producción de electricidad a partir de la capacidad de generación de nuevas instalaciones de FER — MWht/tok 11,14 5. Producción de energía térmica a partir de la capacidad de nueva construcción/nueva generación de instalaciones que utilizan FER: 26,60 MWh/año. 6 Producción de electricidad a partir de una nueva capacidad de generación de instalaciones FER — MWht/tok 11,14 7. Producción de energía térmica a partir de la capacidad de generación de nuevas instalaciones de FER — MWht/tok 26,60 MWh/año. 8. Reducción del consumo de energía primaria en edificios públicos- kwh/año 160838.33 (Spanish) / qualifier | |||||||||||||||
point in time: 18 January 2022
|
Revision as of 07:30, 18 January 2022
Project Q105418 in Poland
Language | Label | Description | Also known as |
---|---|---|---|
English | Thermal modernisation, modernisation and overhaul of the Kornel Makuszyński Primary School in Łańcuchów |
Project Q105418 in Poland |
Statements
960,665.06 zloty
0 references
1,130,194.21 zloty
0 references
85.0 percent
0 references
22 June 2016
0 references
15 December 2019
0 references
GMINA MILEJÓW
0 references
W ramach projektu Wnioskodawca zaplanował inwestycję polegającą na termomodernizacji budynku Szkoły podstawowej w Łańcuchowie zlokalizowanej na terenie Gminy Milejów. Celem głównym projektu jest podniesienie jakości świadczonych usług społecznych dzięki poprawie efektywności energetycznej w budynkach użyteczności publicznej. W ramach inwestycji osiągnięte zostanie zwiększenie efektywności energetycznej budynku o 46,43 %. Zakres robót wynikający z audytu energetycznego: Modernizacja przegrody DZ 1-stalowe 'Wentylacja grawitacyjna' Modernizacja przegrody DZ 3-stalowe-kotłownia 'Wentylacja grawitacyjna' Modernizacja przegrody OZ 1 'Wentylacja grawitacyjna' Modernizacja przegrody DZ 2-Piwnca- 'Wentylacja grawitacyjna' Modernizacja systemu ciepłej wody użytkowej Modernizacja przegrody Strop zewnętrzny Modernizacja przegrody Dach Modernizacja przegrody Ściana zewnętrzna Modernizacja przegrody Ściana na gruncie Modernizacja przegrody Dach Modernizacja systemu grzewczego Pozostałe roboty budowlane związane z termomodernizacją Montaż instalacji fotowoltaicznej o mocy 10,08 kWp W ramach inwestycji osiągnięte zostaną następujące wartości wskaźników rezultatu: 1.Ilość zaoszczędzonej energii cieplnej:430,60 GJ/rok 2. Produkcja energii elektrycznej z nowowybudowanych/nowych mocy wytwórczych instalacji wykorzysujących OZE - MWht /tok 11,14 3. Szacowany roczny spadek emisji gazów cieplarnianych 38,58 ton CO2/rok. 4 Produkcja energii elektrycznej z nowowybudowanych mocy wytwórczych instalacji wykorzysujących OZE - MWht /tok 11,14 5.Produkcja energii cieplnej z nowo wybudowanych/nowych mocy wytwórczych instalacji wykorzystujących OZE: 26,60 MWh/rok. 6 Produkcja energii elektrycznej z nowowybudowanych mocy wytwórczych instalacji wykorzysujących OZE - MWht /tok 11,14 7. Produkcja energii cieplnej z nowowybudowanych mocy wytwórczych instalacji wykorzysujących OZE - MWht /tok 26,60 MWh/rok. 8. Zmniejszenie zużycia energii pierwotnej w budynkach publicznych- kwh/rok 160838,33 (Polish)
0 references
As part of the project, the applicant planned an investment in the thermal modernisation of the primary school in Łańcuchów, located in the Milejów commune. The main objective of the project is to improve the quality of social services provided by improving energy efficiency in public buildings. As part of the investment, the energy efficiency of the building will be increased by 46.43 %. Scope of works resulting from the energy audit: Modernisation of the 1-steel partition DZ ‘Gravitational ventilation’ Modernisation of the division DZ 3-steel-boiler room ‘Gravitational ventilation’ Modernisation of the partition OZ 1 ‘Gravitational ventilation’ Modernisation of the bulkhead DZ 2-Piwncare- ‘Gravitational ventilation’- ‘Great ventilation’ Modernisation of the construction system Modernisation of the external ceiling Modernisation of the bulkhead Modernisation of the system Modernisation of the system Modernisation of the observable system Modernisation of the observable system Modernisation of the barrier Modernisation of the system Modernisation of the 1-steel partition ‘Grillational ventilation’ Modernisation of the partition DZ 3-steel-boiler room ‘Gyvitational ventilation’ Modernisation of the obstruction system OZ 1 ‘Gygravitational ventilation’ Modernisation of the bulkheads DZ 2-Piwn construction-continuum-continuation-“Gravitational ventilation” Modernisation of the construction system Modernisation of the external ceiling Modernisation of the bulkheads Modernisation of the system Modernisation of the system Modernisation of the system Modernisation of the construction of the thermal water system 1.The amount of thermal energy saved: 430,60 GJ/year 2. Production of electricity from newly built/new generation capacity of RES-use installations – MWht/tok 11,14 3. Estimated annual decrease in greenhouse gas emissions of 38.58 tonnes of CO2/year. 4 Manufacture of electricity from newly built RES power plants – MWht/tok 11,14 5.Production of heat from newly built/new RES installations: 26,60 MWh/year. 6 Manufacture of electricity from newly built RES power plants – MWht/tok 11,14 7. Production of thermal energy from newly built RES power plants – MWht/tok 26,60 MWh/year. 8. Reduction of primary energy consumption in public buildings – kwh/year 160838,33 (English)
20 October 2020
0 references
Dans le cadre du projet, la requérante a prévu un investissement consistant en la thermomodernisation de la construction de l’école primaire en chaîne située dans la municipalité de Milejów. L’objectif principal du projet est d’améliorer la qualité des services sociaux fournis en améliorant l’efficacité énergétique des bâtiments publics. L’investissement permettra d’accroître l’efficacité énergétique du bâtiment de 46,43 %. Portée des travaux résultant de l’audit énergétique: Modernisation des cloisons DZ 1-acier «aération de gravity» Modernisation des cloisons DZ 3-boiler en acier «aération de gravity» Modernisation de la cloison OZ 1 «aération de gravity» Modernisation de la cloison DZ 2-Piwnca- ‘aération de la masse’ Modernisation du système d’eau chaude Modernisation de la cloison Plafond extérieur Modernisation de la cloison Roof Modernisation des cloisons Mur extérieur Modernisation des cloisons Mur sur le sol Modernisation des cloisons Dach Modernisation du système de chauffage Autres travaux de construction liés à l’isolation thermique de la photomodernisation de l’usine. 1.Quantité d’énergie économisée cieplnej:430,60 GJ/an 2. Production d’électricité à partir de nouvelles capacités de production d’installations SER — MWht/tok 11.14 3. Réduction annuelle estimée des émissions de gaz à effet de serre de 38,58 tonnes de CO2/an. 4 Production d’électricité à partir de nouvelles capacités de production d’installations SER — MWht/tok 11,14 5.Production d’énergie thermique à partir de nouvelles capacités de production d’installations utilisant des SER: 26,60 MWh/an. 6 Production d’électricité à partir de nouvelles capacités de production d’installations SER — MWht/tok 11,14 7. Production d’énergie thermique à partir de nouvelles capacités de production d’installations SER — MWht/tok 26,60 MWh/an. 8. Réduction de la consommation d’énergie primaire dans les bâtiments publics- kwh/an 160838.33 (French)
1 December 2021
0 references
Im Rahmen des Projekts plante der Antragsteller eine Investition in die Thermomodernisierung des Gebäudes der Primary School in Chain in der Gemeinde Milejów. Hauptziel des Projekts ist die Verbesserung der Qualität der sozialen Dienstleistungen durch die Verbesserung der Energieeffizienz in öffentlichen Gebäuden. Mit der Investition wird die Energieeffizienz des Gebäudes um 46,43 % gesteigert. Umfang der Arbeiten, die sich aus dem Energieaudit ergeben: Modernisierung der Trennwände DZ 1-Stahl ‚Gravity Belüftung‘ Modernisierung der Trennwände DZ 3-Stahlkessel ‚Gravity Lüftung‘ Modernisierung der Trennwand OZ 1 ‚Gravity Belüftung‘ Modernisierung der Trennwand DZ 2-Piwnca- ‚Gravity Lüftung‘ Modernisierung des Systems des Warmwassers Modernisierung der Trennwand Außendecke Modernisierung der Trennwand Dach Modernisierung der Trennwände Wand auf dem Boden Modernisierung der Trennwände Dach Modernisierung des Heizsystems Sonstige Bauarbeiten im Zusammenhang mit der Wärmedämmung der Photomodernisierung der Anlage. 1.Quantity der eingesparten Energie cieplnej:430,60 GJ/Jahr 2. Erzeugung von Strom aus neu gebauten/neuen Erzeugungskapazitäten von EE-Anlagen – MWht/tok 11.14 3. Geschätzte jährliche Verringerung der Treibhausgasemissionen um 38,58 Tonnen CO2/Jahr. 4 Erzeugung von Strom aus neu gebauter Erzeugungskapazität von EE-Anlagen – MWht/tok 11,14 5. Erzeugung von Wärmeenergie aus neu gebauten/neuen Erzeugungskapazitäten von Anlagen, die erneuerbare Energien nutzen: 26,60 MWh/Jahr. 6 Erzeugung von Strom aus neu gebauter Erzeugungskapazität von EE-Anlagen – MWht/tok 11,14 7. Erzeugung von Wärmeenergie aus neu gebauten Erzeugungskapazitäten von EE-Anlagen – MWht/tok 26,60 MWh/Jahr. 8. Reduzierung des Primärenergieverbrauchs in öffentlichen Gebäuden- kwh/Jahr 160838,33 (German)
7 December 2021
0 references
In het kader van het project heeft verzoekster een investering gepland bestaande in de thermomodernisering van het gebouw van de Primary School in Chain in de gemeente Milejów. De belangrijkste doelstelling van het project is de kwaliteit van de sociale dienstverlening te verbeteren door de energie-efficiëntie in openbare gebouwen te verbeteren. De investering zal leiden tot een verhoging van de energie-efficiëntie van het gebouw met 46,43 %. Reikwijdte van de werkzaamheden die voortvloeien uit de energieaudit: Modernisering van de scheidingswanden DZ 1-staal „Gravity ventilatie” Modernisering van de scheidingswanden DZ 3-staal-boiler „Gravity ventilatie” Modernisering van de partitie OZ 1 „Gravity ventilatie” Modernisering van de scheidingswand DZ 2-Piwnca- „Gravity ventilatie” Modernisering van het systeem van warm water Modernisering van de partitie Externe plafond Modernisering van de partitie Dak Modernisering van de scheidingswanden Modernisering van de wanden Muur op de grond Modernisering van de scheidingswanden Dach Modernisering van het verwarmingssysteem Andere bouwwerkzaamheden in verband met de thermische isolatie van de fotomodernisering van de installatie. 1.Quantity van energie bespaard cieplnej:430,60 GJ/jaar 2. Productie van elektriciteit uit nieuw gebouwde/nieuwe opwekkingscapaciteit van RES-installaties — MWht/tok 11.14 3. Geraamde jaarlijkse vermindering van de uitstoot van broeikasgassen met 38,58 ton CO2/jaar. 4 Productie van elektriciteit uit nieuw gebouwde opwekkingscapaciteit van RES-installaties — MWht/tok 11,14 5.Productie van thermische energie uit nieuw gebouwde/nieuwe productiecapaciteit van installaties die hernieuwbare energiebronnen gebruiken: 26,60 MWh/jaar. 6 Productie van elektriciteit uit nieuw gebouwde productiecapaciteit van RES-installaties — MWht/tok 11,14 7. Productie van thermische energie uit nieuw gebouwde opwekkingscapaciteit van RES-installaties — MWht/tok 26,60 MWh/jaar. 8. Vermindering van het primaire energieverbruik in openbare gebouwen- kwh/jaar 160838,33 (Dutch)
17 December 2021
0 references
Nell'ambito del progetto, il richiedente ha pianificato un investimento consistente nella termomodernizzazione della costruzione della scuola primaria in catena situata nel comune di Milejów. L'obiettivo principale del progetto è migliorare la qualità dei servizi sociali forniti migliorando l'efficienza energetica negli edifici pubblici. L'investimento consentirà di aumentare l'efficienza energetica dell'edificio del 46,43 %. Portata dei lavori risultanti dall'audit energetico: Ammodernamento delle partizioni DZ 1-acciaio ‘Aerazione Gravità' Modernizzazione dei divisori DZ 3-steel-caldaia ‘Aerazione Gravity' Modernizzazione della partizione OZ 1 ‘Gravity ventilazione' Modernizzazione della partizione DZ 2-Piwnca- ‘Aerazione Gravity' Modernizzazione del sistema di acqua calda Modernizzazione della partizione Soffitto esterno Modernizzazione della partizione Tetto Modernizzazione delle pareti Ristrutturazione dei divisori Parete sul terreno Ammodernamento delle pareti divisorie Dach Modernizzazione del sistema di riscaldamento Altri lavori di costruzione relativi all'isolamento termico della fotomodernizzazione dell'impianto. 1.Quantità di energia risparmiata cieplnej:430,60 GJ/anno 2. Produzione di energia elettrica da nuova costruzione/nuova capacità di generazione di impianti FER — MWht/tok 11.14 3. Riduzione annua stimata delle emissioni di gas a effetto serra pari a 38,58 tonnellate di CO2/anno. 4 Produzione di energia elettrica da capacità di generazione di nuova costruzione di impianti FER — MWht/tok 11,14 5.Produzione di energia termica da nuova costruzione/nuova capacità di generazione di impianti che utilizzano FER: 26,60 MWh/anno. 6 Produzione di energia elettrica da capacità di generazione di nuova costruzione di impianti FER — MWht/tok 11,14 7. Produzione di energia termica da capacità di generazione di nuova costruzione di impianti FER — MWht/tok 26,60 MWh/anno. 8. Riduzione del consumo di energia primaria negli edifici pubblici- kwh/anno 160838,33 (Italian)
15 January 2022
0 references
Como parte del proyecto, el solicitante planificó una inversión consistente en la termomodernización del edificio de la Escuela Primaria en Cadena ubicada en el Municipio de Milejów. El objetivo principal del proyecto es mejorar la calidad de los servicios sociales prestados mediante la mejora de la eficiencia energética en los edificios públicos. La inversión logrará un aumento de la eficiencia energética del edificio en un 46,43 %. Alcance de las obras resultantes de la auditoría energética: Modernización de los tabiques DZ 1-acero ‘Ventilación por gravedad’ Modernización de los tabiques DZ 3-caldera de acero ‘Ventilación por gravedad’ Modernización del sistema de agua caliente Modernización del tabique Techo externo Modernización de la partición Techo externo Modernización de los tabiques Pared exterior Modernización de los tabiques Modernización de los tabiques Modernización de los tabiques Modernización de los tabiques Modernización de los tabiques Modernización de los tabiques Modernización de los tabiques Dach Modernización del sistema de calefacción Otras obras de construcción relacionadas con el aislamiento térmico de la fotomodernización de la planta. 1. Cantidad de energía ahorrada cieplnej:430,60 GJ/año 2. Producción de electricidad de nueva construcción/nueva capacidad de generación de instalaciones FER — MWht/tok 11.14 3. Reducción anual estimada de las emisiones de gases de efecto invernadero de 38,58 toneladas de CO2/año. 4 Producción de electricidad a partir de la capacidad de generación de nuevas instalaciones de FER — MWht/tok 11,14 5. Producción de energía térmica a partir de la capacidad de nueva construcción/nueva generación de instalaciones que utilizan FER: 26,60 MWh/año. 6 Producción de electricidad a partir de una nueva capacidad de generación de instalaciones FER — MWht/tok 11,14 7. Producción de energía térmica a partir de la capacidad de generación de nuevas instalaciones de FER — MWht/tok 26,60 MWh/año. 8. Reducción del consumo de energía primaria en edificios públicos- kwh/año 160838.33 (Spanish)
18 January 2022
0 references
Identifiers
RPLU.05.02.00-06-0092/16
0 references