WIFI NETWORK AND MANAGEMENT OF LETTIONI (Q2418108): Difference between revisions

From EU Knowledge Graph
Jump to navigation Jump to search
(‎Changed label, description and/or aliases in de, and other parts: Adding German translations)
(‎Changed label, description and/or aliases in nl, and other parts: Adding Dutch translations)
label / nllabel / nl
 
WIFI NETWERK EN LAN BEHEER VAN LESSEN
Property / summary
 
IMPLEMENTATIE VAN DE WIFI-NETWERKINFRASTRUCTUUR MET DEKKING TOT 100 VAN DE OMGEVINGEN VAN DE SCHOOL, BESTAANDE UIT 2 PLEXES OM FRUIBII MEER COLLABORATIEF ONDERWIJZEN VAN TECHNOLOGISCHE TOOLS EN DIENSTEN TE MAKEN DAGLIDALLE STUDENTEN DAIDALLE LERAREN UIT GEZINNEN VAN ATA-PERSONEEL DE OPLOSSING BIEDT SPECIALE BEDRADING INSTALLATIE EN BEHEER VIA MANAGER SWITCH INSTALLATIE EN CONFIGURATIE VAN HET POE-TOEGANGSPUNT (Dutch)
Property / summary: IMPLEMENTATIE VAN DE WIFI-NETWERKINFRASTRUCTUUR MET DEKKING TOT 100 VAN DE OMGEVINGEN VAN DE SCHOOL, BESTAANDE UIT 2 PLEXES OM FRUIBII MEER COLLABORATIEF ONDERWIJZEN VAN TECHNOLOGISCHE TOOLS EN DIENSTEN TE MAKEN DAGLIDALLE STUDENTEN DAIDALLE LERAREN UIT GEZINNEN VAN ATA-PERSONEEL DE OPLOSSING BIEDT SPECIALE BEDRADING INSTALLATIE EN BEHEER VIA MANAGER SWITCH INSTALLATIE EN CONFIGURATIE VAN HET POE-TOEGANGSPUNT (Dutch) / rank
 
Normal rank
Property / summary: IMPLEMENTATIE VAN DE WIFI-NETWERKINFRASTRUCTUUR MET DEKKING TOT 100 VAN DE OMGEVINGEN VAN DE SCHOOL, BESTAANDE UIT 2 PLEXES OM FRUIBII MEER COLLABORATIEF ONDERWIJZEN VAN TECHNOLOGISCHE TOOLS EN DIENSTEN TE MAKEN DAGLIDALLE STUDENTEN DAIDALLE LERAREN UIT GEZINNEN VAN ATA-PERSONEEL DE OPLOSSING BIEDT SPECIALE BEDRADING INSTALLATIE EN BEHEER VIA MANAGER SWITCH INSTALLATIE EN CONFIGURATIE VAN HET POE-TOEGANGSPUNT (Dutch) / qualifier
 
point in time: 12 January 2022
Timestamp+2022-01-12T00:00:00Z
Timezone+00:00
CalendarGregorian
Precision1 day
Before0
After0

Revision as of 10:37, 12 January 2022

Project Q2418108 in Italy
Language Label Description Also known as
English
WIFI NETWORK AND MANAGEMENT OF LETTIONI
Project Q2418108 in Italy

    Statements

    0 references
    18,495.45 Euro
    0 references
    18,495.45 Euro
    0 references
    100.0 percent
    0 references
    15 February 2016
    0 references
    13 December 2016
    0 references
    13 December 2016
    0 references
    LICEO SCIENTIFICO "G. MARINELLI" UDINE
    0 references

    46°3'21.56"N, 13°14'30.98"E
    0 references
    REALIZZAZIONE DELLINFRASTRUTTURA RETE WIFI CON COPERTURA AL 100 DEGLI AMBIENTI DELLISTITUTO SCOLASTICO COMPOSTO DA 2 PLESSI PER RENDERE MAGGIORMENTE FRUIBII IN MANIERA COLLABORATIVA STRUMENTI DIDATTICI TECNOLOGICI E SERVIZI DAGLIDALLE STUDENTI DAIDALLE DOCENTI DALLE FAMIGLIE DAL PERSONALE ATA LA SOLUZIONE PREVEDE CABLAGGIO DEDICATO INSTALLAZIONE E GESTIONE ATTRAVERSO MANAGER SWITCH INSTALLAZIONE E CONFIGURAZIONE DEGLI ACCESS POINT POE (Italian)
    0 references
    CONSTRUCTION OF THE WIFI NETWORK INFRASTRUCTURE COVERING 100 OF THE BUILDINGS OF THE SCHOOL ELLISTITUTO ENVIRONMENTS, MADE UP OF 2 UNITS TO MAKE TECHNOLOGICAL TEACHING TOOLS AND SERVICES MORE WIDELY WITH DAIDALLE STUDENTS DAIDALLE TEACHING STAFF FROM THE FAMILIES FROM THE ATA EMPLOYEES, THE SOLUTION INCLUDES DEDICATED INSTALLATION AND MANAGEMENT THROUGH MANAGEMENT OF SWITCHES AND CONFIGURATION OF THE ACCESS POINT POE. (English)
    0 references
    MISE EN ŒUVRE DE L’INFRASTRUCTURE RÉSEAU WIFI AVEC UNE COUVERTURE À 100 DES ENVIRONNEMENTS DE L’ÉCOLE COMPOSÉE DE 2 PLEX POUR RENDRE FRUIBII PLUS COLLABORATIF D’ENSEIGNEMENT DES OUTILS TECHNOLOGIQUES ET DES SERVICES DAGLIDALLE ÉTUDIANTS DAIDALLE ENSEIGNANTS DE FAMILLES DU PERSONNEL ATA LA SOLUTION FOURNIT L’INSTALLATION ET LA GESTION DE CÂBLAGE DÉDIÉ PAR L’INSTALLATION DE COMMUTATEURS DE GESTIONNAIRE ET LA CONFIGURATION DU POINT D’ACCÈS POE (French)
    24 December 2021
    0 references
    IMPLEMENTIERUNG DER WIFI-NETZWERKINFRASTRUKTUR MIT EINER ABDECKUNG VON 100 DER SCHULUMGEBUNGEN BESTEHEND AUS 2 PLEXIS, UM FRUIBII KOLLABORATIVER UNTERRICHT TECHNOLOGISCHER WERKZEUGE UND DIENSTLEISTUNGEN DAGLIDALLE SCHÜLER DAIDALLE LEHRER AUS FAMILIEN VON ATA-MITARBEITERN DIE LÖSUNG BIETET SPEZIELLE VERKABELUNG INSTALLATION UND MANAGEMENT DURCH MANAGER SWITCH INSTALLATION UND KONFIGURATION DES POE ACCESS POINT (German)
    10 January 2022
    0 references
    IMPLEMENTATIE VAN DE WIFI-NETWERKINFRASTRUCTUUR MET DEKKING TOT 100 VAN DE OMGEVINGEN VAN DE SCHOOL, BESTAANDE UIT 2 PLEXES OM FRUIBII MEER COLLABORATIEF ONDERWIJZEN VAN TECHNOLOGISCHE TOOLS EN DIENSTEN TE MAKEN DAGLIDALLE STUDENTEN DAIDALLE LERAREN UIT GEZINNEN VAN ATA-PERSONEEL DE OPLOSSING BIEDT SPECIALE BEDRADING INSTALLATIE EN BEHEER VIA MANAGER SWITCH INSTALLATIE EN CONFIGURATIE VAN HET POE-TOEGANGSPUNT (Dutch)
    12 January 2022
    0 references

    Identifiers