(10360.14072017.115000021) PRIMARY SCHOOL SANTA BARBARA (Q2155703): Difference between revisions

From EU Knowledge Graph
Jump to navigation Jump to search
(‎Changed label, description and/or aliases in de, and other parts: Adding German translations)
(‎Changed label, description and/or aliases in es, and other parts: Adding Spanish translations)
label / eslabel / es
 
(10360.14072017.115000021) ESCUELA PRIMARIA DE SANTA BÁRBARA
Property / summary
 
TRANSFORMACIÓN DEL EDIFICIO EXISTENTE EN UN EDIFICIO CASI DE ENERGÍA CERO (NZEB) ASÍ? TAL COMO SE ESTABLECE EN EL ANEXO 1 DEL DECRETO MINISTERIAL DE 26 DE JUNIO DE 2015?REQUISITOS MÍNIMOS?. EN DETALLE, ¿QUIERES IR? PARA REALIZAR:- AISLAMIENTO DE LAS PAREDES PERIMETRALES MEDIANTE LA INSTALACIÓN DE UNA CAPA EXTERNA EN EPS 100 (?=0,034 W/MK,?=40 KG/M3), 16 CM DE ESPESOR;- AISLAMIENTO DE LA CUBIERTA MEDIANTE LA COLOCACIÓN DE UN PANEL EPS 100 DE 16 CM CON PANEL RIVERCLACK FINISH- INSTALACIÓN DE UN SISTEMA DE AUTOMATIZACIÓN DE EDIFICIOS CON TERMOSTATO Y VÁLVULAS TERMOSTÁTICAS INALÁMBRICAS EN CADA CUERPO DE CALEFACCIÓN CON POSIBILIDAD? GESTIÓN A DISTANCIA DE LOS SISTEMAS DE CONFORMIDAD CON LO DISPUESTO EN EL PUNTO 5.7.2 DE LAS NORMAS DE APLICACIÓN DE LA CUENTA TÉRMICA 2.0;- SUSTITUCIÓN DE LAS SUPERFICIES ACRISTALADAS ACTUALES POR MARCOS DE VENTANAS POR UN MARCO DE PVC DE 5 CÁMARAS Y 4+ 4/15/3+ 3 CON UN TRATAMIENTO EMISIVO BAJO Y LLENO DE GAS DE ARGÓN;- ACTUALIZACIÓN DE LA PLANTA TÉRMICA DEL GIMNASIO CON LA INSTALACIÓN DE U (Spanish)
Property / summary: TRANSFORMACIÓN DEL EDIFICIO EXISTENTE EN UN EDIFICIO CASI DE ENERGÍA CERO (NZEB) ASÍ? TAL COMO SE ESTABLECE EN EL ANEXO 1 DEL DECRETO MINISTERIAL DE 26 DE JUNIO DE 2015?REQUISITOS MÍNIMOS?. EN DETALLE, ¿QUIERES IR? PARA REALIZAR:- AISLAMIENTO DE LAS PAREDES PERIMETRALES MEDIANTE LA INSTALACIÓN DE UNA CAPA EXTERNA EN EPS 100 (?=0,034 W/MK,?=40 KG/M3), 16 CM DE ESPESOR;- AISLAMIENTO DE LA CUBIERTA MEDIANTE LA COLOCACIÓN DE UN PANEL EPS 100 DE 16 CM CON PANEL RIVERCLACK FINISH- INSTALACIÓN DE UN SISTEMA DE AUTOMATIZACIÓN DE EDIFICIOS CON TERMOSTATO Y VÁLVULAS TERMOSTÁTICAS INALÁMBRICAS EN CADA CUERPO DE CALEFACCIÓN CON POSIBILIDAD? GESTIÓN A DISTANCIA DE LOS SISTEMAS DE CONFORMIDAD CON LO DISPUESTO EN EL PUNTO 5.7.2 DE LAS NORMAS DE APLICACIÓN DE LA CUENTA TÉRMICA 2.0;- SUSTITUCIÓN DE LAS SUPERFICIES ACRISTALADAS ACTUALES POR MARCOS DE VENTANAS POR UN MARCO DE PVC DE 5 CÁMARAS Y 4+ 4/15/3+ 3 CON UN TRATAMIENTO EMISIVO BAJO Y LLENO DE GAS DE ARGÓN;- ACTUALIZACIÓN DE LA PLANTA TÉRMICA DEL GIMNASIO CON LA INSTALACIÓN DE U (Spanish) / rank
 
Normal rank
Property / summary: TRANSFORMACIÓN DEL EDIFICIO EXISTENTE EN UN EDIFICIO CASI DE ENERGÍA CERO (NZEB) ASÍ? TAL COMO SE ESTABLECE EN EL ANEXO 1 DEL DECRETO MINISTERIAL DE 26 DE JUNIO DE 2015?REQUISITOS MÍNIMOS?. EN DETALLE, ¿QUIERES IR? PARA REALIZAR:- AISLAMIENTO DE LAS PAREDES PERIMETRALES MEDIANTE LA INSTALACIÓN DE UNA CAPA EXTERNA EN EPS 100 (?=0,034 W/MK,?=40 KG/M3), 16 CM DE ESPESOR;- AISLAMIENTO DE LA CUBIERTA MEDIANTE LA COLOCACIÓN DE UN PANEL EPS 100 DE 16 CM CON PANEL RIVERCLACK FINISH- INSTALACIÓN DE UN SISTEMA DE AUTOMATIZACIÓN DE EDIFICIOS CON TERMOSTATO Y VÁLVULAS TERMOSTÁTICAS INALÁMBRICAS EN CADA CUERPO DE CALEFACCIÓN CON POSIBILIDAD? GESTIÓN A DISTANCIA DE LOS SISTEMAS DE CONFORMIDAD CON LO DISPUESTO EN EL PUNTO 5.7.2 DE LAS NORMAS DE APLICACIÓN DE LA CUENTA TÉRMICA 2.0;- SUSTITUCIÓN DE LAS SUPERFICIES ACRISTALADAS ACTUALES POR MARCOS DE VENTANAS POR UN MARCO DE PVC DE 5 CÁMARAS Y 4+ 4/15/3+ 3 CON UN TRATAMIENTO EMISIVO BAJO Y LLENO DE GAS DE ARGÓN;- ACTUALIZACIÓN DE LA PLANTA TÉRMICA DEL GIMNASIO CON LA INSTALACIÓN DE U (Spanish) / qualifier
 
point in time: 25 January 2022
Timestamp+2022-01-25T00:00:00Z
Timezone+00:00
CalendarGregorian
Precision1 day
Before0
After0

Revision as of 13:25, 25 January 2022

Project Q2155703 in Italy
Language Label Description Also known as
English
(10360.14072017.115000021) PRIMARY SCHOOL SANTA BARBARA
Project Q2155703 in Italy

    Statements

    0 references
    120,806.67 Euro
    0 references
    493,088.44 Euro
    0 references
    24.5 percent
    0 references
    3 April 2018
    0 references
    3 April 2020
    0 references
    16 November 2020
    0 references
    COMUNE DI CAVRIGLIA
    0 references
    0 references
    0 references

    43°46'11.53"N, 11°15'20.09"E
    0 references
    TRASFORMAZIONE DELL?EDIFICIO ESISTENTE IN EDIFICIO AD ENERGIA QUASI ZERO (NZEB) COS? COME PREVISTO ALL?ALLEGATO 1 DEL D.M. 26 GIUGNO 2015 ?REQUISITI MINIMI?. NEL DETTAGLIO SI ANDR? AD ESEGUIRE:- COIBENTAZIONE DELLE PARETI PERIMETRALI ATTRAVERSO L?INSTALLAZIONE DI UN CAPPOTTO ESTERNO IN EPS 100 (?=0,034 W/MK, ?=40 KG/M3), DELLO SPESSORE DI 16 CM;- COIBENTAZIONE DELLA COPERTURA MEDIANTE POSA DI PANNELLO IN EPS 100 DA 16 CM CON FINITURA IN PANNELLO TIPO RIVERCLACK- INSTALLAZIONE DI UN SISTEMA DI BUILDING AUTOMATION CON CRONOTERMOSTATO E VALVOLE TERMOSTATICHE WIRELESS SU OGNI CORPO SCALDANTE CON POSSIBILIT? DI TELEGESTIONE DEGLI IMPIANTI DA REMOTO CONFORMEMENTE A QUANTO PREVISTO AL PAR. 5.7.2 DELLE REGOLE APPLICATIVE DEL CONTO TERMICO 2.0;- SOSTITUZIONE DEGLI ATTUALI SUPERFICI VETRATE CON SERRAMENTI AVENTI TELAIO IN PVC A 5 CAMERE CAVE E VETROCAMERA 4+4/15/3+3 CON TRATTAMENTO BASSO EMISSIVO RIEMPITA IN GAS ARGON;- AGGIORNAMENTO DELLA CENTRALE TERMICA DELLA PALESTRA CON L?INSTALLAZIONE DI U (Italian)
    0 references
    CONVERSION OF THE EXISTING BUILDING INTO NZEBS (NZEBS)? AS PROVIDED FOR IN ANNEX 1 TO THE MINISTERIAL DECREE OF 26 JUNE 2015? IN DETAIL, IS ANDR? DO YOU HAVE OUTER WALLS IN EPS 100 (? = 0,034 W/MK,? = 40 KG/M3), CM THICK; — INSULATION OF THE PERIMETER OF 16 CM; — INSULATION OF THE COVER BY INSTALLATION OF A CM PANEL IN EPS 100 CM FROM 16 CM IN TYPE FINISHING WITH A BUILDING AUTOMATION SYSTEM AND A SYSTEM OF BUILDING AUTOMATION WITH CHRONOTHERMOSTAT AND WIRELESS THERMOSTATIC VALVES OVER EACH BODY WHICH IS READY TO DO SO? REMOTE MANAGEMENT OF THE REMOTE INSTALLATIONS IN ACCORDANCE WITH PARAGRAPH 5.7.2 OF THE IMPLEMENTING RULES FOR THE THERMAL ACCOUNT 2.0; — REPLACEMENT OF THE CURRENT GLASS SURFACES WITH FRAMES WITH PVC FRAMES TO 5 HOLLOW CHAMBERS AND VETROCAMERA 4 + 4/15/3 + 3 WITH LOW EMISSIONS FILLED IN ARGON; UPDATE OF THE THERMAL POWER STATION OF THE GYM WITH L? INSTALLATION OF U (English)
    0 references
    TRANSFORMATION DU BÂTIMENT EXISTANT EN UN BÂTIMENT À ÉNERGIE QUASI NULLE (NZEB) DONC? COMME PRÉVU À L’ANNEXE 1 DE L’ARRÊTÉ MINISTÉRIEL DU 26 JUIN 2015?EXIGENCES MINIMALES?. EN DÉTAIL, ALLEZ-VOUS Y ALLER? POUR EFFECTUER:- L’ISOLATION DES PAROIS DU PÉRIMÈTRE PAR L’INSTALLATION D’UNE COUCHE EXTÉRIEURE EN EPS 100 (?=0,034 W/MK,?=40 KG/M3), D’UNE ÉPAISSEUR DE 16 CM;- L’ISOLATION DU COUVERCLE PAR POSE D’UN PANNEAU EPS 100 DE 16 CM AVEC PANNEAU RIVERCLACK FINISH- INSTALLATION D’UN SYSTÈME D’AUTOMATISATION DU BÂTIMENT AVEC THERMOSTAT ET VANNES THERMOSTATIQUES SANS FIL SUR CHAQUE CORPS CHAUFFANT AVEC POSSIBILITÉ? GESTION À DISTANCE DES SYSTÈMES CONFORMÉMENT AUX DISPOSITIONS DU PARAGRAPHE 5.7.2 DES RÈGLES D’APPLICATION DU COMPTE THERMIQUE 2.0;- REMPLACEMENT DES SURFACES VITRÉES ACTUELLES PAR DES CADRES DE FENÊTRE PAR UN CADRE EN PVC À 5 CHAMBRES ET 4+ 4/15/3+ 3 AVEC UN TRAITEMENT FAIBLEMENT ÉMISSIF REMPLI DE GAZ D’ARGON;- MISE À JOUR DE L’INSTALLATION THERMIQUE DU GYMNASE AVEC L’INSTALLATION DE U (French)
    23 December 2021
    0 references
    TRANSFORMATIE VAN HET BESTAANDE GEBOUW TOT EEN BIJNA-ENERGIENEUTRAAL GEBOUW (NZEB) DUS? ZOALS BEPAALD IN BIJLAGE 1 BIJ HET MINISTERIEEL BESLUIT VAN 26 JUNI 2015?MINIMUMVEREISTEN?. IN DETAIL, WIL JE GAAN? UIT TE VOEREN:- ISOLATIE VAN DE OMTREK MUREN DOOR DE INSTALLATIE VAN EEN EXTERNE LAAG IN EPS 100 (?=0,034 W/MK,?=40 KG/M3), 16 CM DIK;- ISOLATIE VAN DE AFDEKKING DOOR HET LEGGEN VAN EEN 16 CM EPS 100 PANEEL MET RIVERCLACK PANEEL FINISH- INSTALLATIE VAN EEN GEBOUW AUTOMATISERINGSSYSTEEM MET THERMOSTAAT EN DRAADLOZE THERMOSTATISCHE KLEPPEN OP ELKE VERWARMINGSLICHAAM MET MOGELIJKHEID? BEHEER OP AFSTAND VAN DE SYSTEMEN OVEREENKOMSTIG DE BEPALINGEN VAN PUNT 5.7.2 VAN DE REGELS VOOR DE TOEPASSING VAN DE THERMISCHE REKENING 2.0;- VERVANGING VAN DE HUIDIGE BEGLAZINGSOPPERVLAKKEN DOOR RAAMKOZIJNEN MET EEN PVC-FRAME MET 5 KAMERS EN 4+ 4/15/3+ 3 MET EEN LAGE EMISSIEVRIJE BEHANDELING GEVULD MET ARGONGAS;- UPDATEN VAN DE THERMISCHE INSTALLATIE VAN DE SPORTSCHOOL MET DE INSTALLATIE VAN U (Dutch)
    24 December 2021
    0 references
    UMWANDLUNG DES BESTEHENDEN GEBÄUDES IN EIN FAST NULLENERGIEGEBÄUDE (NZEB) SO? GEMÄSS ANHANG 1 DES MINISTERIALERLASSES VOM 26. JUNI 2015?MINDESTANFORDERUNGEN?. IM DETAIL, GEHEN SIE? DURCHZUFÜHREN:- ISOLIERUNG DER PERIMETERWÄNDE DURCH EINBAU EINER AUSSENSCHICHT IN EPS 100 (?=0.034 W/MK,?=40 KG/M3), 16 CM DICK;- ISOLIERUNG DER ABDECKUNG DURCH VERLEGUNG EINES 16 CM EPS 100 PANELS MIT RIVERCLACK PANEL FINISH- INSTALLATION EINES GEBÄUDEAUTOMATIONSSYSTEMS MIT THERMOSTAT UND DRAHTLOSEN THERMOSTATVENTILEN AN JEDEM HEIZKÖRPER MIT MÖGLICHKEIT? FERNSTEUERUNG DER SYSTEME GEMÄSS ABSATZ 5.7.2 DER REGELN FÜR DIE ANWENDUNG DES WÄRMEKONTOS 2.0;- ERSETZUNG DER STROMVERGLASTEN FLÄCHEN DURCH FENSTERRAHMEN MIT EINEM 5-KAMMER-PVC-RAHMEN UND 4+ 4/15/3+ 3 DURCH MIT ARGONGAS GEFÜLLTE NIEDRIG EMISSIVE BEHANDLUNG;- AKTUALISIERUNG DER WÄRMEANLAGE DES FITNESSSTUDIOS MIT DEM EINBAU VON U (German)
    25 December 2021
    0 references
    TRANSFORMACIÓN DEL EDIFICIO EXISTENTE EN UN EDIFICIO CASI DE ENERGÍA CERO (NZEB) ASÍ? TAL COMO SE ESTABLECE EN EL ANEXO 1 DEL DECRETO MINISTERIAL DE 26 DE JUNIO DE 2015?REQUISITOS MÍNIMOS?. EN DETALLE, ¿QUIERES IR? PARA REALIZAR:- AISLAMIENTO DE LAS PAREDES PERIMETRALES MEDIANTE LA INSTALACIÓN DE UNA CAPA EXTERNA EN EPS 100 (?=0,034 W/MK,?=40 KG/M3), 16 CM DE ESPESOR;- AISLAMIENTO DE LA CUBIERTA MEDIANTE LA COLOCACIÓN DE UN PANEL EPS 100 DE 16 CM CON PANEL RIVERCLACK FINISH- INSTALACIÓN DE UN SISTEMA DE AUTOMATIZACIÓN DE EDIFICIOS CON TERMOSTATO Y VÁLVULAS TERMOSTÁTICAS INALÁMBRICAS EN CADA CUERPO DE CALEFACCIÓN CON POSIBILIDAD? GESTIÓN A DISTANCIA DE LOS SISTEMAS DE CONFORMIDAD CON LO DISPUESTO EN EL PUNTO 5.7.2 DE LAS NORMAS DE APLICACIÓN DE LA CUENTA TÉRMICA 2.0;- SUSTITUCIÓN DE LAS SUPERFICIES ACRISTALADAS ACTUALES POR MARCOS DE VENTANAS POR UN MARCO DE PVC DE 5 CÁMARAS Y 4+ 4/15/3+ 3 CON UN TRATAMIENTO EMISIVO BAJO Y LLENO DE GAS DE ARGÓN;- ACTUALIZACIÓN DE LA PLANTA TÉRMICA DEL GIMNASIO CON LA INSTALACIÓN DE U (Spanish)
    25 January 2022
    0 references

    Identifiers