(A19_074_2015_0740081_1090) (Q2065859): Difference between revisions

From EU Knowledge Graph
Jump to navigation Jump to search
(‎Changed label, description and/or aliases in de, and other parts: Adding German translations)
(‎Changed label, description and/or aliases in es, and other parts: Adding Spanish translations)
label / eslabel / es
 
(A19_074_2015_0740081_1090) ARLIHOTELPUNTALA
Property / summary
 
EL PROYECTO PREVÉ LA RENOVACIÓN INTERNA TOTAL DE UN HOTEL EXISTENTE, PERO HASTA LA FECHA CERRADO DURANTE MÁS DE DOS AÑOS LA PROPIEDAD ARLI SRL DE HECHO NO HA GESTIONADO DIRECTAMENTE LA MISMA, SINO QUE TAMBIÉN SE CONVERTIRÁ EN GERENTE PARA COMPLETAR LAS OBRAS DE RECALIFICACIÓN DEL SISTEMA ELÉCTRICO SE RECONSTRUIRÁ COMPLETAMENTE, ASÍ COMO WINDOWS Y WINDOWS UTILIZANDO MATERIALES ECOCOMPATIBLES Y CON MENOS IMPACTO ENERGÉTICO Y MEDIOAMBIENTAL. LA ILUMINACIÓN SE REVISARÁ COMPLETAMENTE, TANTO EN LOS PUNTOS DE LUZ CON ILUMINACIÓN LED COMO EN LOS MODOS DE ENCENDIDO/APAGADO PARA OPTIMIZAR EL CONSUMO (Spanish)
Property / summary: EL PROYECTO PREVÉ LA RENOVACIÓN INTERNA TOTAL DE UN HOTEL EXISTENTE, PERO HASTA LA FECHA CERRADO DURANTE MÁS DE DOS AÑOS LA PROPIEDAD ARLI SRL DE HECHO NO HA GESTIONADO DIRECTAMENTE LA MISMA, SINO QUE TAMBIÉN SE CONVERTIRÁ EN GERENTE PARA COMPLETAR LAS OBRAS DE RECALIFICACIÓN DEL SISTEMA ELÉCTRICO SE RECONSTRUIRÁ COMPLETAMENTE, ASÍ COMO WINDOWS Y WINDOWS UTILIZANDO MATERIALES ECOCOMPATIBLES Y CON MENOS IMPACTO ENERGÉTICO Y MEDIOAMBIENTAL. LA ILUMINACIÓN SE REVISARÁ COMPLETAMENTE, TANTO EN LOS PUNTOS DE LUZ CON ILUMINACIÓN LED COMO EN LOS MODOS DE ENCENDIDO/APAGADO PARA OPTIMIZAR EL CONSUMO (Spanish) / rank
 
Normal rank
Property / summary: EL PROYECTO PREVÉ LA RENOVACIÓN INTERNA TOTAL DE UN HOTEL EXISTENTE, PERO HASTA LA FECHA CERRADO DURANTE MÁS DE DOS AÑOS LA PROPIEDAD ARLI SRL DE HECHO NO HA GESTIONADO DIRECTAMENTE LA MISMA, SINO QUE TAMBIÉN SE CONVERTIRÁ EN GERENTE PARA COMPLETAR LAS OBRAS DE RECALIFICACIÓN DEL SISTEMA ELÉCTRICO SE RECONSTRUIRÁ COMPLETAMENTE, ASÍ COMO WINDOWS Y WINDOWS UTILIZANDO MATERIALES ECOCOMPATIBLES Y CON MENOS IMPACTO ENERGÉTICO Y MEDIOAMBIENTAL. LA ILUMINACIÓN SE REVISARÁ COMPLETAMENTE, TANTO EN LOS PUNTOS DE LUZ CON ILUMINACIÓN LED COMO EN LOS MODOS DE ENCENDIDO/APAGADO PARA OPTIMIZAR EL CONSUMO (Spanish) / qualifier
 
point in time: 25 January 2022
Timestamp+2022-01-25T00:00:00Z
Timezone+00:00
CalendarGregorian
Precision1 day
Before0
After0

Revision as of 07:38, 25 January 2022

Project Q2065859 in Italy
Language Label Description Also known as
English
(A19_074_2015_0740081_1090)
Project Q2065859 in Italy

    Statements

    0 references
    25,978.79 Euro
    0 references
    51,957.58 Euro
    0 references
    50.0 percent
    0 references
    13 March 2015
    0 references
    6 December 2018
    0 references
    13 March 2017
    0 references
    ARLI S.R.L.
    0 references
    0 references
    0 references

    42°45'50.15"N, 10°52'44.72"E
    0 references
    IL PROGETTO PREVEDE LA TOTALE RIQUALIFICAZIONE INTERNA DI UN ALBERGO GIA ESISTENTE MA AD OGGI CHIUSO DA OLTRE DUE ANNI LA PROPRIETA ARLI SRL NON GESTIVA DIRETTAMENTE INFATTI LO STESSO MA NE DIVENTERA ANCHE GESTORE A COMPLETAMENTO OPERE DI RIQUALIFICAZIONE L'IMPIANTO ELETTRICO VERRA COMPLETAMENTE RIFATTO, COSI COME GLI INFISSI E LE FINESTRE UTILIZZANDO MATERIALI ECO COMPATIBILI E A MINOR IMPATTO ENERGETICO ED AMBIENTALE. L'ILLUMINAZIONE VERRA RIVISTA COMPLETAMENTE, SIA NEI PUNTI LUCE CON ILLUMINAZIONE A LED CHE NELLE MODALITA DI ACCENSIONE/SPEGNIMENTO PER L'OTTIMIZZAZIONE DEI CONSUMI (Italian)
    0 references
    THE PROJECT PROVIDES FOR THE TOTAL INTERNAL REDEPLOYMENT OF A HOTEL ALREADY IN EXISTENCE, BUT HAS NOW BEEN CLOSED FOR MORE THAN TWO YEARS BY THE OWNERSHIP OF THE PROPERTY ARLI SRL, NOT DIRECTLY MANAGING THE PROJECT ITSELF, BUT IS ALSO NOT MANAGING IT, BUT IS ALSO MANAGING THE ELECTRICITY SYSTEM TO COMPLETE THE POWER PLANT IN ORDER TO COMPLETE THE ELECTRICITY SYSTEM, AS WELL AS THE WINDOWS AND WINDOWS USING COMPATIBLE ECO MATERIALS WITH A LOWER ENERGY AND ENVIRONMENTAL IMPACT. THE ILLUMINATION WILL BE COMPLETELY REVISED, BOTH IN THE LIGHT AND IN THE LIGHT BULBS, AND IN THE LIGHT/OFF MODE FOR OPTIMISATION OF CONSUMPTION. (English)
    0 references
    LE PROJET PRÉVOIT LE RÉAMÉNAGEMENT INTERNE TOTAL D’UN HÔTEL EXISTANT, MAIS À CE JOUR FERMÉ PENDANT PLUS DE DEUX ANS, LA PROPRIÉTÉ ARLI SRL N’A PAS GÉRÉ DIRECTEMENT LA MÊME CHOSE, MAIS DEVIENDRA ÉGALEMENT GESTIONNAIRE POUR ACHEVER LES TRAVAUX DE REQUALIFICATION, LE SYSTÈME ÉLECTRIQUE SERA ENTIÈREMENT RECONSTRUIT, AINSI QUE WINDOWS ET WINDOWS À L’AIDE DE MATÉRIAUX ÉCO-COMPATIBLES ET AVEC MOINS D’IMPACT ÉNERGÉTIQUE ET ENVIRONNEMENTAL. L’ÉCLAIRAGE SERA ENTIÈREMENT RÉVISÉ, TANT DANS LES POINTS LUMINEUX AVEC ÉCLAIRAGE MENÉ QUE DANS LES MODES MARCHE/ARRÊT POUR OPTIMISER LA CONSOMMATION (French)
    16 December 2021
    0 references
    HET PROJECT VOORZIET IN DE TOTALE INTERNE HERONTWIKKELING VAN EEN BESTAAND HOTEL, MAAR TOT OP HEDEN GESLOTEN VOOR MEER DAN TWEE JAAR, HEEFT ARLI SRL IN FEITE NIET DIRECT HETZELFDE BEHEERD, MAAR ZAL OOK MANAGER WORDEN OM HERKWALIFICATIEWERKZAAMHEDEN TE VOLTOOIEN, HET ELEKTRISCHE SYSTEEM ZAL VOLLEDIG WORDEN HERBOUWD, EVENALS WINDOWS EN WINDOWS MET BEHULP VAN ECO-COMPATIBELE MATERIALEN EN MET MINDER ENERGIE- EN MILIEU-IMPACT. DE VERLICHTING WORDT VOLLEDIG HERZIEN, ZOWEL IN DE LICHTPUNTEN MET LED-VERLICHTING ALS IN DE AAN/UITSTANDEN OM HET VERBRUIK TE OPTIMALISEREN (Dutch)
    23 December 2021
    0 references
    DAS PROJEKT SIEHT DIE GESAMTE INTERNE SANIERUNG EINES BESTEHENDEN HOTELS VOR, ABER BIS HEUTE FÜR MEHR ALS ZWEI JAHRE GESCHLOSSEN DIE IMMOBILIE ARLI SRL IN DER TAT NICHT DIREKT VERWALTET DAS GLEICHE, SONDERN WIRD AUCH MANAGER FÜR KOMPLETTE UMSCHULUNGSARBEITEN WERDEN, DAS ELEKTRISCHE SYSTEM WIRD KOMPLETT UMGEBAUT WERDEN, SOWIE WINDOWS UND WINDOWS MIT UMWELTFREUNDLICHEN MATERIALIEN UND MIT WENIGER ENERGIE- UND UMWELTAUSWIRKUNGEN. DIE BELEUCHTUNG WIRD KOMPLETT ÜBERARBEITET, SOWOHL IN DEN LICHTPUNKTEN MIT LED-BELEUCHTUNG ALS AUCH IM EIN-/AUS-MODUS ZUR OPTIMIERUNG DES VERBRAUCHS (German)
    24 December 2021
    0 references
    EL PROYECTO PREVÉ LA RENOVACIÓN INTERNA TOTAL DE UN HOTEL EXISTENTE, PERO HASTA LA FECHA CERRADO DURANTE MÁS DE DOS AÑOS LA PROPIEDAD ARLI SRL DE HECHO NO HA GESTIONADO DIRECTAMENTE LA MISMA, SINO QUE TAMBIÉN SE CONVERTIRÁ EN GERENTE PARA COMPLETAR LAS OBRAS DE RECALIFICACIÓN DEL SISTEMA ELÉCTRICO SE RECONSTRUIRÁ COMPLETAMENTE, ASÍ COMO WINDOWS Y WINDOWS UTILIZANDO MATERIALES ECOCOMPATIBLES Y CON MENOS IMPACTO ENERGÉTICO Y MEDIOAMBIENTAL. LA ILUMINACIÓN SE REVISARÁ COMPLETAMENTE, TANTO EN LOS PUNTOS DE LUZ CON ILUMINACIÓN LED COMO EN LOS MODOS DE ENCENDIDO/APAGADO PARA OPTIMIZAR EL CONSUMO (Spanish)
    25 January 2022
    0 references

    Identifiers