EXTENSION WORKS HOTEL CHERZ (Q2075431): Difference between revisions

From EU Knowledge Graph
Jump to navigation Jump to search
(‎Changed label, description and/or aliases in nl, and other parts: Adding Dutch translations)
(‎Changed label, description and/or aliases in de, and other parts: Adding German translations)
label / delabel / de
 
ERWEITERUNGS- UND MODERNISIERUNGSARBEITEN DES HOTELS MONTE CHERZ
Property / summary
 
DAS PROJEKT BEINHALTET EINE ERWEITERUNG DES GEBÄUDES IN MONTE IN RICHTUNG NORDEN FÜR DEN BAU EINES SEPARATEN GEBÄUDES, ABER VERBUNDEN MIT DEM BESTEHENDEN, ALS RÄUME FÜR DAS PERSONAL IM ERDGESCHOSS, WELLNESS-CENTER MIT SCHWIMMBAD IM ERSTEN STOCK UND KONFERENZRAUM IM ZWEITEN STOCK GENUTZT WERDEN. (German)
Property / summary: DAS PROJEKT BEINHALTET EINE ERWEITERUNG DES GEBÄUDES IN MONTE IN RICHTUNG NORDEN FÜR DEN BAU EINES SEPARATEN GEBÄUDES, ABER VERBUNDEN MIT DEM BESTEHENDEN, ALS RÄUME FÜR DAS PERSONAL IM ERDGESCHOSS, WELLNESS-CENTER MIT SCHWIMMBAD IM ERSTEN STOCK UND KONFERENZRAUM IM ZWEITEN STOCK GENUTZT WERDEN. (German) / rank
 
Normal rank
Property / summary: DAS PROJEKT BEINHALTET EINE ERWEITERUNG DES GEBÄUDES IN MONTE IN RICHTUNG NORDEN FÜR DEN BAU EINES SEPARATEN GEBÄUDES, ABER VERBUNDEN MIT DEM BESTEHENDEN, ALS RÄUME FÜR DAS PERSONAL IM ERDGESCHOSS, WELLNESS-CENTER MIT SCHWIMMBAD IM ERSTEN STOCK UND KONFERENZRAUM IM ZWEITEN STOCK GENUTZT WERDEN. (German) / qualifier
 
point in time: 24 December 2021
Timestamp+2021-12-24T00:00:00Z
Timezone+00:00
CalendarGregorian
Precision1 day
Before0
After0

Revision as of 13:52, 24 December 2021

Project Q2075431 in Italy
Language Label Description Also known as
English
EXTENSION WORKS HOTEL CHERZ
Project Q2075431 in Italy

    Statements

    0 references
    129,931.19 Euro
    0 references
    259,862.38 Euro
    0 references
    50.0 percent
    0 references
    31 May 2019
    0 references
    1 April 2021
    0 references
    HOTEL MONTE CHERZ DI DE DORIGO GIORGIO AND C. SNC
    0 references
    0 references
    0 references

    46°30'23.87"N, 11°56'12.52"E
    0 references
    IL PROGETTO PREVEDE UN AMPLIAMENTO DELL¿IMMOBILE A MONTE DELL¿EDIFICIO VERSO NORD PER LA REALIZZAZIONE DI UN CORPO DI FABBRICA A SE STANTE MA COLLEGATO ALL¿ESISTENTE DA ADIBIRE A CAMERE PER IL PERSONALE AL PIANO TERRA, CENTRO BENESSERE CON PISCINA AL PRIMO PIANO E SALA CONGRESSI AL SECONDO PIANO. (Italian)
    0 references
    THE PROJECT PROVIDES FOR AN EXTENSION OF THE PROPERTY TO BE EXTENDED UPSTREAM OF THE BUILDING TO THE NORTH FOR THE PURPOSE OF CARRYING OUT A SEPARATE WORKS OF CONSTRUCTION WORKS IN ITS OWN RIGHT BUT ATTACHED TO THE EXISTING ZONE TO BE USED BY CHAMBERS FOR STAFF ON THE GROUND FLOOR, WELLNESS WITH A SWIMMING POOL AT THE FIRST FLOOR AND CONFERENCE ROOM ON THE SECOND FLOOR. (English)
    0 references
    LE PROJET COMPREND UNE EXTENSION DE L’IMMEUBLE À MONTE DU BÂTIMENT VERS LE NORD POUR LA CONSTRUCTION D’UN BÂTIMENT SÉPARÉ MAIS RELIÉ À L’EXISTANT POUR SERVIR DE LOCAUX POUR LE PERSONNEL AU REZ-DE-CHAUSSÉE, CENTRE DE BIEN-ÊTRE AVEC PISCINE AU PREMIER ÉTAGE ET SALLE DE CONFÉRENCE AU DEUXIÈME ÉTAGE. (French)
    16 December 2021
    0 references
    HET PROJECT OMVAT EEN UITBREIDING VAN HET GEBOUW IN MONTE VAN HET GEBOUW NAAR HET NOORDEN VOOR DE BOUW VAN EEN APART GEBOUW, MAAR VERBONDEN MET HET BESTAANDE TE GEBRUIKEN ALS KAMERS VOOR PERSONEEL OP DE BEGANE GROND, WELLNESSCENTRUM MET ZWEMBAD OP DE EERSTE VERDIEPING EN CONFERENTIERUIMTE OP DE TWEEDE VERDIEPING. (Dutch)
    23 December 2021
    0 references
    DAS PROJEKT BEINHALTET EINE ERWEITERUNG DES GEBÄUDES IN MONTE IN RICHTUNG NORDEN FÜR DEN BAU EINES SEPARATEN GEBÄUDES, ABER VERBUNDEN MIT DEM BESTEHENDEN, ALS RÄUME FÜR DAS PERSONAL IM ERDGESCHOSS, WELLNESS-CENTER MIT SCHWIMMBAD IM ERSTEN STOCK UND KONFERENZRAUM IM ZWEITEN STOCK GENUTZT WERDEN. (German)
    24 December 2021
    0 references

    Identifiers

    B91G19000120009
    0 references