NEW LAND COVER SAN FRANCESCO VIA MILITE UNKNOWN, FIRST PART OF THE FIRST LOT, ROP ERDF 2014 2020, INVESTMENT FOR GROWTH AND EMPLOYMENT OBJECTIVE AXIS 5 OT5 OB SPEC 5 1 (Q2040751): Difference between revisions

From EU Knowledge Graph
Jump to navigation Jump to search
(‎Changed label, description and/or aliases in nl, and other parts: Adding Dutch translations)
(‎Changed label, description and/or aliases in de, and other parts: Adding German translations)
label / delabel / de
 
NEUE HOCHWASSERABDECKUNG SAN FRANCESCO VIA MILITE UNBEKANNTER ERSTER AUSZUG AUS DEM ERSTEN LOS, EFRE 2014 2020 ZIELINVESTITIONEN IN WACHSTUM UND BESCHÄFTIGUNG ACHSE 5 OT5 OB SPEC 5 1
Property / summary
 
DAS ENDGÜLTIGE PROJEKT ZUM WIEDERAUFBAU DER TERMINALABDECKUNG DES SAN FRANCESCO TORRENT IST TEIL DES BREITEREN PROJEKTS DER HYDRAULISCHEN DISTEMATION DES T.SAN FRANCESCO, FÜR DAS DER TECHNISCHE AUSSCHUSS FÜR BECKEN AM 09.02.2017 EINE BEFÜRWORTENDE STELLUNGNAHME ABGEGEBEN HAT. DIE INTERVENTION BESTEHT IN DER REALISIERUNG EINER NEUEN EINSTÖCKIGEN, ABSENKENDEN GRUNDGEFÄLLE REGULARISIERUNG UND LÖST DIE STRUKTURELLEN MÄNGEL DER AKTUELLEN STRUKTUR. DER ERSTE AUSZUG VON DER MÜNDUNG ZUR PIAZZA PASTENE DES ERSTEN LOSES, DAS DIE EISENBAHNLINIE FÜR CA. 79 METER ERREICHT, BEWAHRT DIE FUNKTIONALITÄT DER DISMOUNTERS VON MONTE. DAS HYDRAULISCHE RISIKO WIRD ABGEMILDERT, DA DIE BEIDEN AUSZÜGE DER ERSTEN CHARGE ABGESCHLOSSEN SIND UND DER 200ENNAL-DURCHSATZ GEWÄHRLEISTET IST. (German)
Property / summary: DAS ENDGÜLTIGE PROJEKT ZUM WIEDERAUFBAU DER TERMINALABDECKUNG DES SAN FRANCESCO TORRENT IST TEIL DES BREITEREN PROJEKTS DER HYDRAULISCHEN DISTEMATION DES T.SAN FRANCESCO, FÜR DAS DER TECHNISCHE AUSSCHUSS FÜR BECKEN AM 09.02.2017 EINE BEFÜRWORTENDE STELLUNGNAHME ABGEGEBEN HAT. DIE INTERVENTION BESTEHT IN DER REALISIERUNG EINER NEUEN EINSTÖCKIGEN, ABSENKENDEN GRUNDGEFÄLLE REGULARISIERUNG UND LÖST DIE STRUKTURELLEN MÄNGEL DER AKTUELLEN STRUKTUR. DER ERSTE AUSZUG VON DER MÜNDUNG ZUR PIAZZA PASTENE DES ERSTEN LOSES, DAS DIE EISENBAHNLINIE FÜR CA. 79 METER ERREICHT, BEWAHRT DIE FUNKTIONALITÄT DER DISMOUNTERS VON MONTE. DAS HYDRAULISCHE RISIKO WIRD ABGEMILDERT, DA DIE BEIDEN AUSZÜGE DER ERSTEN CHARGE ABGESCHLOSSEN SIND UND DER 200ENNAL-DURCHSATZ GEWÄHRLEISTET IST. (German) / rank
 
Normal rank
Property / summary: DAS ENDGÜLTIGE PROJEKT ZUM WIEDERAUFBAU DER TERMINALABDECKUNG DES SAN FRANCESCO TORRENT IST TEIL DES BREITEREN PROJEKTS DER HYDRAULISCHEN DISTEMATION DES T.SAN FRANCESCO, FÜR DAS DER TECHNISCHE AUSSCHUSS FÜR BECKEN AM 09.02.2017 EINE BEFÜRWORTENDE STELLUNGNAHME ABGEGEBEN HAT. DIE INTERVENTION BESTEHT IN DER REALISIERUNG EINER NEUEN EINSTÖCKIGEN, ABSENKENDEN GRUNDGEFÄLLE REGULARISIERUNG UND LÖST DIE STRUKTURELLEN MÄNGEL DER AKTUELLEN STRUKTUR. DER ERSTE AUSZUG VON DER MÜNDUNG ZUR PIAZZA PASTENE DES ERSTEN LOSES, DAS DIE EISENBAHNLINIE FÜR CA. 79 METER ERREICHT, BEWAHRT DIE FUNKTIONALITÄT DER DISMOUNTERS VON MONTE. DAS HYDRAULISCHE RISIKO WIRD ABGEMILDERT, DA DIE BEIDEN AUSZÜGE DER ERSTEN CHARGE ABGESCHLOSSEN SIND UND DER 200ENNAL-DURCHSATZ GEWÄHRLEISTET IST. (German) / qualifier
 
point in time: 24 December 2021
Timestamp+2021-12-24T00:00:00Z
Timezone+00:00
CalendarGregorian
Precision1 day
Before0
After0

Revision as of 11:19, 24 December 2021

Project Q2040751 in Italy
Language Label Description Also known as
English
NEW LAND COVER SAN FRANCESCO VIA MILITE UNKNOWN, FIRST PART OF THE FIRST LOT, ROP ERDF 2014 2020, INVESTMENT FOR GROWTH AND EMPLOYMENT OBJECTIVE AXIS 5 OT5 OB SPEC 5 1
Project Q2040751 in Italy

    Statements

    0 references
    822,500.0 Euro
    0 references
    2,350,000.0 Euro
    0 references
    35.0 percent
    0 references
    29 December 2015
    0 references
    31 December 2022
    0 references
    COMUNE DI RAPALLO
    0 references
    0 references
    0 references

    44°21'4.14"N, 9°13'46.81"E
    0 references
    IL PROGETTO DEFINITIVO DI RIFACIMENTO DELLA COPERTURA TERMINALE DEL TORRENTE SAN FRANCESCO SI INSERISCE NEL PIU' AMPIOPROGETTO DI DISTEMAZIONE IDRAULICA DEL T.SAN FRANCESCO PER CUI IL COMITATO TECNICO DI BACINO HA ESPRESSO PARERE FAVOREVOLE IN DATA 09/02/2017. INTERVENTO CONSISTE NELLA REALIZZAZIONE DI NUOVA TOMBINATURA A FORNICE UNICO, ABBASSAMENTO FONDO ALVEO REGOLARIZZAZIONE PENDENZA E RISOLVE LE CARENZE STRUTTURALI DELLA ATTUALE STRUTTURA. IL PRIMO STRALCIO DA FOCE A PIAZZA PASTENE DEL PRIMO LOTTO CHE RAGGIUNGE LA LINEA FERROVIARIA PER MT 79 CIRCA MANTIENE LA FUNZIONALITA DEGLI SCOLMATORI DI MONTE. VIENE MITIGATO IL RISCHIO IDRAULICO IN QUANTO COMPLETATI I DUE STRALCI DEL PRIMO LOTTO SI GARANTISCE IL DEFLUSSO DELLA PORTATA 200ENNALE. (Italian)
    0 references
    THE DEFINITIVE PROJECT FOR THE RECONSTRUCTION OF THE TERMINAL COVERAGE OF THE SAN FRANCESCO TORRENT IS PART OF A HYDRAULIC PHYSICAL CONSTRUCTION OF THE RIVER SAN FRANCESCO, FOR WHICH THE TECHNICAL COMMITTEE OF THE BASIN DELIVERED A FAVOURABLE OPINION ON 09/02/2017. THE INTERVENTION CONSISTS OF THE PRODUCTION OF A NEW TOMBLING OF A SINGLE TUBE, A LOWERING OF THE FUND’S SLOPE. IT RESOLVES THE STRUCTURAL WEAKNESSES OF THE CURRENT STRUCTURE. THE FIRST EXTRACT FROM THE MOUTH TO PIAZZA PABSTAND OF THE FIRST BATCH THAT REACHES THE RAILWAY LINE FOR MT 79 APPROXIMATELY MAINTAINS THE FUNCTIONALITY OF THE UPSTREAM SPILLWAYS. THE HYDRAULIC RISK IS MITIGATED AS THE TWO PARTS OF THE FIRST BATCH ARE COMPLETED TO ENSURE THAT THE 200ENNALE FLOW IS RUN OFF. (English)
    0 references
    LE PROJET FINAL DE RECONSTRUCTION DE LA COUVERTURE TERMINALE DU TORRENT SAN FRANCESCO FAIT PARTIE DU PROJET PLUS LARGE DE DISTEMATION HYDRAULIQUE DU T.SAN FRANCESCO POUR LEQUEL LE COMITÉ TECHNIQUE DU BASSIN A ÉMIS UN AVIS FAVORABLE LE 09/02/2017. L’INTERVENTION CONSISTE EN LA RÉALISATION D’UN NOUVEAU MOBILIER UNIQUE, EN ABAISSANT LA RÉGULARISATION DE LA PENTE INFÉRIEURE ET RÉSOUT LES CARENCES STRUCTURELLES DE LA STRUCTURE ACTUELLE. LE PREMIER EXTRAIT DE L’EMBOUCHURE À PIAZZA PASTENE DU PREMIER LOT QUI ATTEINT LA LIGNE DE CHEMIN DE FER POUR ENVIRON 79 MÈTRES MAINTIENT LA FONCTIONNALITÉ DES DISMOUNTERS DE MONTE. LE RISQUE HYDRAULIQUE EST ATTÉNUÉ À MESURE QUE LES DEUX EXTRAITS DU PREMIER LOT ONT ÉTÉ COMPLÉTÉS ET QUE LE DÉBIT 200ENNAL EST GARANTI. (French)
    16 December 2021
    0 references
    HET DEFINITIEVE PROJECT VOOR DE WEDEROPBOUW VAN DE TERMINAL VAN DE SAN FRANCESCO TORRENT MAAKT DEEL UIT VAN HET BREDERE PROJECT VAN HYDRAULISCHE DISTEMATION VAN DE T.SAN FRANCESCO, WAARVOOR HET TECHNISCH COMITÉ VOOR HET BEKKEN OP 9 FEBRUARI 2017 EEN GUNSTIG ADVIES HEEFT UITGEBRACHT. INTERVENTIE BESTAAT UIT HET REALISEREN VAN EEN NIEUWE SINGLE-FURNISHING, VERLAGING VAN DE BODEMHELLING REGULARISATIE EN LOST DE STRUCTURELE TEKORTKOMINGEN VAN DE HUIDIGE STRUCTUUR. HET EERSTE UITTREKSEL UIT DE MOND NAAR PIAZZA PASTENE VAN HET EERSTE PERCEEL DAT DE SPOORLIJN VOOR ONGEVEER 79 METER BEREIKT, BEHOUDT DE FUNCTIONALITEIT VAN DE DISMOUNTERS VAN MONTE. HET HYDRAULISCHE RISICO WORDT BEPERKT DOORDAT DE TWEE FRAGMENTEN VAN DE EERSTE PARTIJ ZIJN VOLTOOID EN HET 200ENNAL-DEBIET IS GEGARANDEERD. (Dutch)
    23 December 2021
    0 references
    DAS ENDGÜLTIGE PROJEKT ZUM WIEDERAUFBAU DER TERMINALABDECKUNG DES SAN FRANCESCO TORRENT IST TEIL DES BREITEREN PROJEKTS DER HYDRAULISCHEN DISTEMATION DES T.SAN FRANCESCO, FÜR DAS DER TECHNISCHE AUSSCHUSS FÜR BECKEN AM 09.02.2017 EINE BEFÜRWORTENDE STELLUNGNAHME ABGEGEBEN HAT. DIE INTERVENTION BESTEHT IN DER REALISIERUNG EINER NEUEN EINSTÖCKIGEN, ABSENKENDEN GRUNDGEFÄLLE REGULARISIERUNG UND LÖST DIE STRUKTURELLEN MÄNGEL DER AKTUELLEN STRUKTUR. DER ERSTE AUSZUG VON DER MÜNDUNG ZUR PIAZZA PASTENE DES ERSTEN LOSES, DAS DIE EISENBAHNLINIE FÜR CA. 79 METER ERREICHT, BEWAHRT DIE FUNKTIONALITÄT DER DISMOUNTERS VON MONTE. DAS HYDRAULISCHE RISIKO WIRD ABGEMILDERT, DA DIE BEIDEN AUSZÜGE DER ERSTEN CHARGE ABGESCHLOSSEN SIND UND DER 200ENNAL-DURCHSATZ GEWÄHRLEISTET IST. (German)
    24 December 2021
    0 references

    Identifiers

    J61B17000480006
    0 references