TRANSVERSAL DIRECTOR OF BASILICATA (Q2021708): Difference between revisions

From EU Knowledge Graph
Jump to navigation Jump to search
(‎Changed label, description and/or aliases in nl, and other parts: Adding Dutch translations)
(‎Changed label, description and/or aliases in de, and other parts: Adding German translations)
label / delabel / de
 
QUERRICHTUNG LUCANA
Property / summary
 
MIT DEM VORLIEGENDEN PROJEKTVORSCHLAG WIRD DER BAU DER NEUEN 150-KV-STROMVERSORGUNGSLINIE „TRANSVERSALE LUCANA“ EINGEFÜHRT, DIE DURCH DIE ÜBERTRAGUNG ZWISCHEN 380 KV UND 150 KV TEILE DER REGION BASILICATA ÜBER DAS BESTEHENDE 380150 KV TRANSFORMATORENKRAFTWERK IN GENZANO (PZ) UND DIE 150 KV-SORTUNGSANLAGEN, DIE MIT DEM „OPPIDO (PZ)“ UND „VAGLIO (PZ)“ AUSGESTATTET SIND, ZU DEN INTERVENTIONEN IN DEN VERTEILERNETZEN VON NELL GEHÖREN, UM DIE NUTZUNG DER DEZENTRALEN ERZEUGUNG AUS ERNEUERBAREN QUELLEN ZU ERHÖHEN, SOWEIT MELV NICHT IN DER LAGE IST, ZUMINDEST DAS MLV-NETZ ZU REGISTRIEREN. (German)
Property / summary: MIT DEM VORLIEGENDEN PROJEKTVORSCHLAG WIRD DER BAU DER NEUEN 150-KV-STROMVERSORGUNGSLINIE „TRANSVERSALE LUCANA“ EINGEFÜHRT, DIE DURCH DIE ÜBERTRAGUNG ZWISCHEN 380 KV UND 150 KV TEILE DER REGION BASILICATA ÜBER DAS BESTEHENDE 380150 KV TRANSFORMATORENKRAFTWERK IN GENZANO (PZ) UND DIE 150 KV-SORTUNGSANLAGEN, DIE MIT DEM „OPPIDO (PZ)“ UND „VAGLIO (PZ)“ AUSGESTATTET SIND, ZU DEN INTERVENTIONEN IN DEN VERTEILERNETZEN VON NELL GEHÖREN, UM DIE NUTZUNG DER DEZENTRALEN ERZEUGUNG AUS ERNEUERBAREN QUELLEN ZU ERHÖHEN, SOWEIT MELV NICHT IN DER LAGE IST, ZUMINDEST DAS MLV-NETZ ZU REGISTRIEREN. (German) / rank
 
Normal rank
Property / summary: MIT DEM VORLIEGENDEN PROJEKTVORSCHLAG WIRD DER BAU DER NEUEN 150-KV-STROMVERSORGUNGSLINIE „TRANSVERSALE LUCANA“ EINGEFÜHRT, DIE DURCH DIE ÜBERTRAGUNG ZWISCHEN 380 KV UND 150 KV TEILE DER REGION BASILICATA ÜBER DAS BESTEHENDE 380150 KV TRANSFORMATORENKRAFTWERK IN GENZANO (PZ) UND DIE 150 KV-SORTUNGSANLAGEN, DIE MIT DEM „OPPIDO (PZ)“ UND „VAGLIO (PZ)“ AUSGESTATTET SIND, ZU DEN INTERVENTIONEN IN DEN VERTEILERNETZEN VON NELL GEHÖREN, UM DIE NUTZUNG DER DEZENTRALEN ERZEUGUNG AUS ERNEUERBAREN QUELLEN ZU ERHÖHEN, SOWEIT MELV NICHT IN DER LAGE IST, ZUMINDEST DAS MLV-NETZ ZU REGISTRIEREN. (German) / qualifier
 
point in time: 24 December 2021
Timestamp+2021-12-24T00:00:00Z
Timezone+00:00
CalendarGregorian
Precision1 day
Before0
After0

Revision as of 00:15, 24 December 2021

Project Q2021708 in Italy
Language Label Description Also known as
English
TRANSVERSAL DIRECTOR OF BASILICATA
Project Q2021708 in Italy

    Statements

    0 references
    22,130,624.24 Euro
    0 references
    29,956,466.09 Euro
    0 references
    73.88 percent
    0 references
    18 September 2017
    0 references
    31 July 2019
    0 references
    TERNA - RETE ELETTRICA NAZIONALE
    0 references
    0 references

    40°38'18.24"N, 15°48'7.96"E
    0 references
    LA PROPOSTA PROGETTUALE IN ESAME INERISCE LA REALIZZAZIONE DEL NUOVO ELETTRODOTTO A 150 KV DENOMINATO 'TRASVERSALE LUCANA', CHE, INNESTANDOSI TRA PORZIONI DI RETE A 380 KV E A 150 KV AFFERENTI ALLA REGIONE BASILICATA ATTRAVERSO L'ESISTENTE STAZIONE ELETTRICA DI TRASFORMAZIONE 380150 KV DI GENZANO (PZ) E LE STAZIONI ELETTRICHE DI SMISTAMENTO A 150 KV DENOMINATE 'OPPIDO (PZ)' E 'VAGLIO (PZ)', RISULTA STRETTAMENTE COMPLEMENTARE AGLI INTERVENTI SULLE RETI DI DISTRIBUZIONE NELL'AREA DI INTERESSE VOLTI AD INCREMENTARE LO SFRUTTAMENTO DI GENERAZIONE DISTRIBUITA DA FONTI RINNOVABILI CONNESSA A TALI RETI NELLA MISURA IN CUI POTRà CONSENTIRE DI EVITARE QUOTA PARTE DELLA MANCATA PRODUZIONE EOLICA (MPE) CHE SI REGISTRA ANNUALMENTE SULLE DUE DIRETTRICI A 150 KV 'CP MELFI - CP POTENZA' E 'CP MELFI - CP ALTAMURA' IN CONCOMITANZA DEI CONSISTENTI FENOMENI DI RISALITA DI ENERGIA DALLA RETE DI DISTRIBUZIONE VERSO LA RETE DI TRASMISSIONE CHE SI SONO REGISTRATI NEGLI ULTIMI ANNI, E PER ALMENO L'1% DELLE O (Italian)
    0 references
    THE PROJECT PROPOSAL UNDER EXAMINATION IS CONCERNED WITH THE CONSTRUCTION OF THE NEW 150 KV ‘CANCANA’ POWER LINE, WHICH, IN COMBINATION WITH THE 380 KV AND 150 KV NETWORK PORTIONS OF THE BASILICATA REGION THROUGH THE EXISTING 380 150 KV TRANSFORMATION ELECTRICITY STATION (PZ) AND THE ‘OPPIDATE’ (PZ) AND SORTING POWER STATIONS, KNOWN AS ‘OPPIDO (PZ)’ AND ‘SCREENING’ (PZ)’, IS CLOSELY COMPLEMENTARY TO INTERVENTIONS ON DISTRIBUTION NETWORKS IN THE AREA OF INTEREST TO INCREASE THE EXPLOITATION OF DISTRIBUTED GENERATION FROM RENEWABLE ENERGY SOURCES CONNECTED TO THESE NETWORKS TO THE EXTENT THAT IT MAY BE POSSIBLE TO AVOID A SHARE OF THE WIND GENERATION (‘CP’) ‘CP’ AND ‘CP MELFI — CP ALTAMURA’ AT THE SAME TIME AS THE SIGNIFICANT RISE OF ENERGY BY THE DISTRIBUTION NETWORK TO THE TRANSMISSION NETWORK THAT HAVE OCCURRED IN RECENT YEARS, AND AT LEAST 1 % OF OR (English)
    0 references
    LA PROPOSITION DE PROJET INTRODUIT LA CONSTRUCTION DE LA NOUVELLE LIGNE DE PRODUCTION DE 150 KV APPELÉE «TRANSVERSALE LUCANA», QUI, PAR GREFFAGE ENTRE 380 KV ET 150 KV DE LA RÉGION DE BASILICATE PAR L’INTERMÉDIAIRE DE LA CENTRALE ÉLECTRIQUE DE TRANSFORMATEUR DE 380150 KV EXISTANTE À GENZANO (PZ) ET DES STATIONS DE TRI DE 150 KV APPELÉES «OPPIDO (PZ)» ET «VAGLIO (PZ)», EST STRICTEMENT COMPLÉMENTAIRE DES INTERVENTIONS SUR LES RÉSEAUX DE DISTRIBUTION DE NELL EN VUE D’ACCROÎTRE L’EXPLOITATION DE LA PRODUCTION DISTRIBUÉE À PARTIR DE SOURCES RENOUVELABLES À PARTIR DE CES RÉSEAUX, DANS LA MESURE OÙ MELV N’EST PAS EN MESURE D’ENREGISTRER AU MOINS LA PRODUCTION DE CE RÉSEAU, À PARTIR DE LA PRODUCTION DE CE DERNIER À PARTIR DU RÉSEAU DE PRODUCTION, QUI EST LE PLUS FAIBLE DE LA PRODUCTION DE L’ENTREPRISE COMMUNE À PARTIR DE LA PRODUCTION DE L’ÉNERGIE DONT LA PRODUCTION EST LA «TRANSVERSALE LUCANA», QUI, PAR LE GREFFAGE ENTRE 380 KV ET 150 KV DE LA RÉGION DE BASILICATE À TRAVERS LA CENTRALE ÉLECTRIQUE DE GENZANO (PZ) ET LES STATIONS DE TRI DE 150 KV, DÉNOMMÉES «OPPIDO (PZ)» ET «VAGLIO (PZ)», EST STRICTEMENT COMPLÉMENTAIRE AUX INTERVENTIONS SUR LES RÉSEAUX DE DISTRIBUTION DE CES RÉSEAUX, À LA PRODUCTION DE SOURCES RENOUVELABLES QUI, À PARTIR DE LA PRODUCTION DE CES RÉSEAUX, À LAQUELLE LA PRODUCTION DE CES SOURCES EST LIÉE À LA PRODUCTION DE CE DERNIER AU MOINS À PARTIR DE LA PRODUCTION DE CE DERNIER À PARTIR DE LA PRODUCTION DE CE DERNIER À PARTIR DE LA PRODUCTION DE CE DERNIER, (French)
    14 December 2021
    0 references
    HET ONDERHAVIGE PROJECTVOORSTEL VOORZIET IN DE AANLEG VAN HET NIEUWE ELEKTRICITEITSNET VAN 150 KV MET DE PRODUCTIE VAN „TRANSVERSALE” LUCANA, DAT DOOR DE DISTRIBUTIE TUSSEN 380 KV EN 150 KV VAN DE REGIO BASILICATA VIA DE BESTAANDE 380150 KV-TRANSFORMATORCENTRALE IN GENZANO (PZ) EN DE 150 KV-SORTEERSTATIONS „OPPIDO (PZ)” EN „VAGLIO (PZ)” STRIKT COMPLEMENTAIR IS MET DE INTERVENTIES OP DE DISTRIBUTIENETTEN VAN NELL, TENEINDE DE EXPLOITATIE VAN GEDISTRIBUEERDE PRODUCTIE UIT HERNIEUWBARE BRONNEN TE BEVORDEREN, VOOR ZOVER MELV NIET IN STAAT IS OM TEN MINSTE DE MLV’S-CENTRALES TE REGISTREREN. (Dutch)
    23 December 2021
    0 references
    MIT DEM VORLIEGENDEN PROJEKTVORSCHLAG WIRD DER BAU DER NEUEN 150-KV-STROMVERSORGUNGSLINIE „TRANSVERSALE LUCANA“ EINGEFÜHRT, DIE DURCH DIE ÜBERTRAGUNG ZWISCHEN 380 KV UND 150 KV TEILE DER REGION BASILICATA ÜBER DAS BESTEHENDE 380150 KV TRANSFORMATORENKRAFTWERK IN GENZANO (PZ) UND DIE 150 KV-SORTUNGSANLAGEN, DIE MIT DEM „OPPIDO (PZ)“ UND „VAGLIO (PZ)“ AUSGESTATTET SIND, ZU DEN INTERVENTIONEN IN DEN VERTEILERNETZEN VON NELL GEHÖREN, UM DIE NUTZUNG DER DEZENTRALEN ERZEUGUNG AUS ERNEUERBAREN QUELLEN ZU ERHÖHEN, SOWEIT MELV NICHT IN DER LAGE IST, ZUMINDEST DAS MLV-NETZ ZU REGISTRIEREN. (German)
    24 December 2021
    0 references

    Identifiers

    G33G17004260007
    0 references