Investments in RES in WARMIA – PLUS (Q2717206): Difference between revisions

From EU Knowledge Graph
Jump to navigation Jump to search
(‎Changed label, description and/or aliases in nl, and other parts: Adding Dutch translations)
(‎Changed label, description and/or aliases in it, and other parts: Adding Italian translations)
label / itlabel / it
 
Investimenti in RES in Warmia — PLUS
Property / summary
 
L'opzione prescelta riguarda la costruzione di impianti fotovoltaici corredati di INFRASTRUCTURE PER L'AIR TEREN 0,5 ha — INDUSTRIAL TEREN TEREN Indirizzo di investimento: STOJPY, GM. Godkowo, d. n. 1/19 r. 10 KARWITY. Potenza nominale 133,80 kWp, Numero di moduli fotovoltaici 446 Numero di inverter DC/AC 4, area occupata 729,21 m². Il posto di osservazione deve essere progettato per: costruzione del polo di disconnessione SN 15 kV costruzione di una linea di cavi sotterranei SN 15 kV costruzione di una stazione di container transf freestanding. SN/nN costruzione di una linea di cavi sotterranei nN 0,4 kV YAKXS 4x185 mm² costruzione di un connettore di distribuzione freestanding costruzione di cavi sotterranei costruzione di una struttura di supporto a terra per pannelli fotovoltaici 446 pz pannelli fotovoltaici (potenza di un unico pannello 300 W) installazione di 4kpl. AC/DC inverter costruzione di cavi solari sotterranei 1x6 mm² costruzione di 5kpl. catalogo alberi fulmini di altezza. 13,5 m fuori terra, costruzione di FeZn cooper sotterraneo 30x4 mm numero di inverter 4 Potenza inverter — 27,6 kW Fasi di realizzazione del progetto: — presentazione della domanda di finanziamento — firma della convenzione di sovvenzione — selezione del contraente in conformità del principio di competitività — conclusione del contratto con il contraente e inizio dei lavori — esecuzione dei lavori secondo il calendario previsto — completamento del progetto e firma del protocollo finale — liquidazione finale del progetto Il progetto è in linea con le ipotesi inserite nella SzOOP RPOW ai fini di: Aumento della quota di FER nel bilancio energetico complessivo della regione. L'attuazione della sottomisura aumenterà la quota di energie rinnovabili nel bilancio della società, che aumenterà la quota di energie rinnovabili nel bilancio energetico. La regione. Ciò ridurrà le emissioni di gas nocivi e polveri nell'atmosfera e aumenterà la competitività dell'azienda attraverso l'uso di fonti energetiche rinnovabili locali. A seguito dell'investimento, i costi associati al consumo energetico diminuiranno. (Italian)
Property / summary: L'opzione prescelta riguarda la costruzione di impianti fotovoltaici corredati di INFRASTRUCTURE PER L'AIR TEREN 0,5 ha — INDUSTRIAL TEREN TEREN Indirizzo di investimento: STOJPY, GM. Godkowo, d. n. 1/19 r. 10 KARWITY. Potenza nominale 133,80 kWp, Numero di moduli fotovoltaici 446 Numero di inverter DC/AC 4, area occupata 729,21 m². Il posto di osservazione deve essere progettato per: costruzione del polo di disconnessione SN 15 kV costruzione di una linea di cavi sotterranei SN 15 kV costruzione di una stazione di container transf freestanding. SN/nN costruzione di una linea di cavi sotterranei nN 0,4 kV YAKXS 4x185 mm² costruzione di un connettore di distribuzione freestanding costruzione di cavi sotterranei costruzione di una struttura di supporto a terra per pannelli fotovoltaici 446 pz pannelli fotovoltaici (potenza di un unico pannello 300 W) installazione di 4kpl. AC/DC inverter costruzione di cavi solari sotterranei 1x6 mm² costruzione di 5kpl. catalogo alberi fulmini di altezza. 13,5 m fuori terra, costruzione di FeZn cooper sotterraneo 30x4 mm numero di inverter 4 Potenza inverter — 27,6 kW Fasi di realizzazione del progetto: — presentazione della domanda di finanziamento — firma della convenzione di sovvenzione — selezione del contraente in conformità del principio di competitività — conclusione del contratto con il contraente e inizio dei lavori — esecuzione dei lavori secondo il calendario previsto — completamento del progetto e firma del protocollo finale — liquidazione finale del progetto Il progetto è in linea con le ipotesi inserite nella SzOOP RPOW ai fini di: Aumento della quota di FER nel bilancio energetico complessivo della regione. L'attuazione della sottomisura aumenterà la quota di energie rinnovabili nel bilancio della società, che aumenterà la quota di energie rinnovabili nel bilancio energetico. La regione. Ciò ridurrà le emissioni di gas nocivi e polveri nell'atmosfera e aumenterà la competitività dell'azienda attraverso l'uso di fonti energetiche rinnovabili locali. A seguito dell'investimento, i costi associati al consumo energetico diminuiranno. (Italian) / rank
 
Normal rank
Property / summary: L'opzione prescelta riguarda la costruzione di impianti fotovoltaici corredati di INFRASTRUCTURE PER L'AIR TEREN 0,5 ha — INDUSTRIAL TEREN TEREN Indirizzo di investimento: STOJPY, GM. Godkowo, d. n. 1/19 r. 10 KARWITY. Potenza nominale 133,80 kWp, Numero di moduli fotovoltaici 446 Numero di inverter DC/AC 4, area occupata 729,21 m². Il posto di osservazione deve essere progettato per: costruzione del polo di disconnessione SN 15 kV costruzione di una linea di cavi sotterranei SN 15 kV costruzione di una stazione di container transf freestanding. SN/nN costruzione di una linea di cavi sotterranei nN 0,4 kV YAKXS 4x185 mm² costruzione di un connettore di distribuzione freestanding costruzione di cavi sotterranei costruzione di una struttura di supporto a terra per pannelli fotovoltaici 446 pz pannelli fotovoltaici (potenza di un unico pannello 300 W) installazione di 4kpl. AC/DC inverter costruzione di cavi solari sotterranei 1x6 mm² costruzione di 5kpl. catalogo alberi fulmini di altezza. 13,5 m fuori terra, costruzione di FeZn cooper sotterraneo 30x4 mm numero di inverter 4 Potenza inverter — 27,6 kW Fasi di realizzazione del progetto: — presentazione della domanda di finanziamento — firma della convenzione di sovvenzione — selezione del contraente in conformità del principio di competitività — conclusione del contratto con il contraente e inizio dei lavori — esecuzione dei lavori secondo il calendario previsto — completamento del progetto e firma del protocollo finale — liquidazione finale del progetto Il progetto è in linea con le ipotesi inserite nella SzOOP RPOW ai fini di: Aumento della quota di FER nel bilancio energetico complessivo della regione. L'attuazione della sottomisura aumenterà la quota di energie rinnovabili nel bilancio della società, che aumenterà la quota di energie rinnovabili nel bilancio energetico. La regione. Ciò ridurrà le emissioni di gas nocivi e polveri nell'atmosfera e aumenterà la competitività dell'azienda attraverso l'uso di fonti energetiche rinnovabili locali. A seguito dell'investimento, i costi associati al consumo energetico diminuiranno. (Italian) / qualifier
 
point in time: 15 January 2022
Timestamp+2022-01-15T00:00:00Z
Timezone+00:00
CalendarGregorian
Precision1 day
Before0
After0

Revision as of 21:55, 15 January 2022

Project Q2717206 in Poland
Language Label Description Also known as
English
Investments in RES in WARMIA – PLUS
Project Q2717206 in Poland

    Statements

    0 references
    700,795.25 zloty
    0 references
    155,786.78 Euro
    0.2223 Euro
    0 references
    824,465.0 zloty
    0 references
    183,278.57 Euro
    0.2223 Euro
    0 references
    85.0 percent
    0 references
    27 November 2018
    0 references
    31 December 2020
    0 references
    FIRMA HANDLOWO - USŁUGOWA WARMIA - PLUS TOMASZ CHOJECKI
    0 references
    0 references

    54°4'51.2"N, 19°54'11.5"E
    0 references
    Wybrany wariant dotyczy budowy SYSTEMÓW FOTOWOLTAICZNYCH Z TOWARZYSZĄCĄ INFRASTRUKTURĄ NA POWIERZCHNI TERENU 0,5ha – TEREN ZABUDOWY PRZEMYSŁOWEJ Adres inwestycji: STOJPY, GM. GODKOWO, dz. nr 1/19 obr. 10 KARWITY. Moc znamionowa 133,80 kWp, Ilość modułów fotowoltaicznych 446 Ilość inwerterów DC/AC 4, powierzchnia zajmowana 729,21 m2. Na działce projektuje się: budowę wolnostojącego słupa rozłącznikowego SN 15kV budowę podziemnej linii kablowej SN 15kV budowę wolnostojącej kontenerowej stacji transf. SN/nN budowę podziemnej linii kablowej nN 0,4kV YAKXS 4x185mm2 budowę wolnostojącego złącza rozdzielczego budowę podziemnych linii kablowych budowę naziemnej katalogowej konstrukcji wsporczej pod panele fotowoltaiczne montaż 446szt. paneli fotowoltaicznych (moc pojedynczego panela 300W) montaż 4kpl. inwerterów AC/DC budowę podziemnych kabli solarnych 1x6mm2 budowę 5kpl. katalogowych masztów odgromowych o wys. 13,5m ponad gruntem, budowę podziemnej bednarki FeZn 30x4mm ilość inwerterów 4 Moc jednostkowa inwertera - 27,6 kW Etapy realizacji projektu: - złożenie wniosku o dofinansowanie - podpisanie umowy o dofinansowanie - wybór wykonawcy zgodnie z zasadą konkurencyjności - zawarcie umowy z wykonawcą i rozpoczęcie prac - realizacja prac zgodnie z założonym harmonogramem - zakończenie projektu i podpisanie protokołu końcowego - końcowe rozliczenie projektu Projekt wpisuje się w założenia wpisane w SzOOP RPOWiM realizując założony cel: Zwiększony udział OZE w ogólnym bilansie energetycznym regionu. Realizacja poddziałania pozwoli na zwiększenie udziału energii odnawialnej w bilansie energ. przedsiębiorstwa, co wpłynie na zwiększenie udziału energii odnawialnej w bilansie energ. Regionu. Wpłynie to na ograniczenie emisji szkodliwych gazów i pyłów do atmosfery oraz dzięki wykorzystaniu lokalnych źródeł energii odnawialnej zwiększy konkurencyjność firmy. W wyniku realizacji inwestycji spadną koszty związane z zużyciem energii. (Polish)
    0 references
    The selected option concerns the construction of photovoltaic systems with accompanying INFRASTRUCTURE FOR THE AIR TEREN 0.5 ha – INDUSTRIAL TEREN TEREN Investment address: STOJPY, GM. Godkowo, d. No. 1/19 r. 10 KARWITY. Rated power 133.80 kWp, Number of photovoltaic modules 446 Number of DC/AC inverters 4, occupied area 729.21 m². The plot shall be designed for: construction of the SN 15 kV freestanding disconnection pole construction of an underground cable line SN 15 kV construction of a freestanding transf container station. SN/nN construction of an underground cable line nN 0.4 kV YAKXS 4x185 mm² construction of a freestanding distribution connector construction of underground cable lines construction of a ground-based supporting structure for photovoltaic panels assembling 446pcs photovoltaic panels (power of a single panel 300 W) installation of 4kpl. AC/DC inverters construction of underground solar cables 1x6 mm² construction of 5kpl. catalogue lightning masts of height. 13.5 m above ground, construction of FeZn underground cooper 30x4 mm number of inverters 4 Inverter power – 27.6 kW Stages of project implementation: — submission of the application for funding – signature of the grant agreement – selection of the contractor in accordance with the principle of competitiveness – conclusion of the contract with the contractor and commencement of works – implementation of the works in accordance with the planned timetable – completion of the project and signing of the final protocol – final settlement of the project The project is in line with the assumptions entered in the SzOOP RPOW for the purpose of: Increased share of RES in the region’s overall energy balance. The implementation of the sub-measure will increase the share of renewable energy in the balance sheet of the company, which will increase the share of renewable energy in the energy balance sheet. The region. This will reduce emissions of harmful gases and dusts into the atmosphere and increase the competitiveness of the company through the use of local renewable energy sources. As a result of the investment, the costs associated with energy consumption will decrease. (English)
    8 July 2021
    0 references
    L’option retenue concerne la construction de systèmes photovoltaïques accompagnés d’INFRASTRUCTURE FOR THE AIR TEREN 0,5 ha — INDUSTRIAL TEREN TEREN Adresse d’investissement: STOJPY, GM. Godkowo, d. No 1/19 r. 10 KARWITY. Puissance nominale 133,80 kWp, nombre de modules photovoltaïques 446 Nombre d’onduleurs DC/AC 4, superficie occupée 729,21 m². La parcelle doit être conçue pour: construction d’un poteau de déconnexion autoportant SN 15 kV d’une ligne de câble souterraine SN 15 kV construction d’une station de conteneurs transf autoportants. SN/nN construction d’une ligne de câble souterrain nN 0,4 kV YAKXS 4x185 mm² construction d’un connecteur de distribution autonome construction de lignes de câbles souterrains construction d’une structure de support au sol pour panneaux photovoltaïques assemblant 446pcs panneaux photovoltaïques (puissance d’un seul panneau 300 W) installation d’onduleurs AC/DC 4kpl. construction de câbles solaires souterrains 1x6 mm² construction de mâts de foudre catalogue 5 kpl de hauteur. 13,5 m au-dessus du sol, construction d’une coopératrice souterraine FeZn 30x4 mm nombre d’onduleurs 4 Puissance de l’onduleur — 27,6 kW Étapes de mise en œuvre du projet: — présentation de la demande de financement — signature de la convention de subvention — sélection du contractant selon le principe de compétitivité — conclusion du contrat avec le contractant et début des travaux — exécution des travaux selon le calendrier prévu — achèvement du projet et signature du protocole final — règlement final du projet Le projet est conforme aux hypothèses figurant dans le RPOW SzOOP aux fins: Augmentation de la part des SER dans le bilan énergétique global de la région. La mise en œuvre de la sous-mesure augmentera la part des énergies renouvelables dans le bilan de l’entreprise, ce qui augmentera la part des énergies renouvelables dans le bilan énergétique. La région. Cela permettra de réduire les émissions de gaz et de poussières nocifs dans l’atmosphère et d’accroître la compétitivité de l’entreprise grâce à l’utilisation de sources d’énergie renouvelables locales. À la suite de l’investissement, les coûts associés à la consommation d’énergie diminueront. (French)
    4 December 2021
    0 references
    Die gewählte Option betrifft den Bau von Photovoltaikanlagen mit begleitender INFRASTRUCTURE FOR THE AIR TEREN 0,5 ha – INDUSTRIAL TEREN TEREN Investitionsadresse: STOJPY, GM. Godkowo, d. Nr. 1/19 r. 10 KARWITÄT. Nennleistung 133,80 kWp, Anzahl der Photovoltaik-Module 446 Anzahl DC/AC Wechselrichter 4, belegte Fläche 729,21 m². Die Parzelle muss für Folgendes ausgelegt sein: Bau des freistehenden Trennstocks SN 15 kV einer unterirdischen Kabellinie SN 15 kV Bau einer freistehenden Transf-Containerstation. SN/nN Bau einer unterirdischen Kabellinie nN 0,4 kV YAKXS 4x185 mm² Bau eines freistehenden Verteileranschlusses Bau einer unterirdischen Kabelleitung Bau einer bodengestützten Tragkonstruktion für Photovoltaik-Paneele zusammenbauen 446pcs Photovoltaik-Paneele (Leistung einer einzelnen Panel 300 W) Installation von 4kpl. AC/DC Wechselrichter Bau von unterirdischen Solarkabeln 1x6 mm² Bau von 5kpl. Katalog Blitzmasten der Höhe. 13,5 m über dem Boden, Bau der FeZn-Untertagekooper 30x4 mm Anzahl Wechselrichter 4 Wechselrichterleistung – 27,6 kW Phasen der Projektdurchführung: — Einreichung des Förderantrags – Unterzeichnung der Finanzhilfevereinbarung – Auswahl des Auftragnehmers nach dem Grundsatz der Wettbewerbsfähigkeit – Abschluss des Vertrags mit dem Auftragnehmer und Beginn der Arbeiten – Durchführung der Arbeiten gemäß dem vorgesehenen Zeitplan – Abschluss des Projekts und Unterzeichnung des Schlussprotokolls – Abschluss des Projekts Das Projekt steht im Einklang mit den im SzOOP RPOW enthaltenen Annahmen für folgende Zwecke: Erhöhung des Anteils erneuerbarer Energiequellen an der Gesamtenergiebilanz der Region. Die Umsetzung der Teilmaßnahme wird den Anteil erneuerbarer Energien in der Bilanz des Unternehmens erhöhen, wodurch der Anteil erneuerbarer Energien in der Energiebilanz erhöht wird. Die Region. Dies wird die Emissionen schädlicher Gase und Stäube in die Atmosphäre verringern und die Wettbewerbsfähigkeit des Unternehmens durch den Einsatz lokaler erneuerbarer Energiequellen erhöhen. Infolge der Investition werden die mit dem Energieverbrauchs verbundenen Kosten sinken. (German)
    16 December 2021
    0 references
    De gekozen optie betreft de bouw van fotovoltaïsche systemen met bijbehorende INFRASTRUCTURE VOOR HET AIR-TEREN 0,5 ha — INDUSTRIAL TEREN TEREN Investeringsadres: STOJPY, GM. Godkowo, ovl. nr. 1/19 r. 10 KARWITY. Nominaal vermogen 133,80 kWp, Aantal fotovoltaïsche modules 446 Aantal DC/AC omvormers 4, bezet gebied 729,21 m². Het perceel moet zijn ontworpen voor: bouw van de vrijstaande SN 15 kV scheidingspool constructie van een ondergrondse kabelbaan SN 15 kV bouw van een vrijstaand transf containerstation. SN/nN bouw van een ondergrondse kabellijn nN 0,4 kV YAKXS 4x185 mm² bouw van een vrijstaande distributieconnector constructie van ondergrondse kabellijnen bouw van een grond-gebaseerde ondersteunende structuur voor fotovoltaïsche panelen assembleren 446pcs fotovoltaïsche panelen (vermogen van een enkel paneel 300 W) installatie van 4kpl. AC/DC omvormers bouw van ondergrondse zonnekabels 1x6 mm² bouw van 5kpl. catalogus bliksem masten van hoogte. 13,5 m boven de grond, bouw van FeZn ondergrondse kuiper 30x4 mm aantal omvormers 4 Omvormer vermogen — 27,6 kW Fases van projectuitvoering: indiening van de financieringsaanvraag — ondertekening van de subsidieovereenkomst — selectie van de contractant overeenkomstig het beginsel van concurrentievermogen — sluiting van het contract met de contractant en aanvang van de werkzaamheden — uitvoering van de werkzaamheden volgens het geplande tijdschema — voltooiing van het project en ondertekening van het definitieve protocol — definitieve afwikkeling van het project Het project is in overeenstemming met de veronderstellingen die in het SzOOP RPOW zijn opgenomen met het oog op: Een groter aandeel van hernieuwbare energiebronnen in de totale energiebalans van de regio. De tenuitvoerlegging van de submaatregel zal het aandeel hernieuwbare energie in de balans van de onderneming vergroten, waardoor het aandeel hernieuwbare energie in de energiebalans zal toenemen. De regio. Dit zal de uitstoot van schadelijke gassen en stof in de atmosfeer verminderen en het concurrentievermogen van het bedrijf vergroten door het gebruik van lokale hernieuwbare energiebronnen. Als gevolg van de investering zullen de kosten in verband met het energieverbruik dalen. (Dutch)
    18 December 2021
    0 references
    L'opzione prescelta riguarda la costruzione di impianti fotovoltaici corredati di INFRASTRUCTURE PER L'AIR TEREN 0,5 ha — INDUSTRIAL TEREN TEREN Indirizzo di investimento: STOJPY, GM. Godkowo, d. n. 1/19 r. 10 KARWITY. Potenza nominale 133,80 kWp, Numero di moduli fotovoltaici 446 Numero di inverter DC/AC 4, area occupata 729,21 m². Il posto di osservazione deve essere progettato per: costruzione del polo di disconnessione SN 15 kV costruzione di una linea di cavi sotterranei SN 15 kV costruzione di una stazione di container transf freestanding. SN/nN costruzione di una linea di cavi sotterranei nN 0,4 kV YAKXS 4x185 mm² costruzione di un connettore di distribuzione freestanding costruzione di cavi sotterranei costruzione di una struttura di supporto a terra per pannelli fotovoltaici 446 pz pannelli fotovoltaici (potenza di un unico pannello 300 W) installazione di 4kpl. AC/DC inverter costruzione di cavi solari sotterranei 1x6 mm² costruzione di 5kpl. catalogo alberi fulmini di altezza. 13,5 m fuori terra, costruzione di FeZn cooper sotterraneo 30x4 mm numero di inverter 4 Potenza inverter — 27,6 kW Fasi di realizzazione del progetto: — presentazione della domanda di finanziamento — firma della convenzione di sovvenzione — selezione del contraente in conformità del principio di competitività — conclusione del contratto con il contraente e inizio dei lavori — esecuzione dei lavori secondo il calendario previsto — completamento del progetto e firma del protocollo finale — liquidazione finale del progetto Il progetto è in linea con le ipotesi inserite nella SzOOP RPOW ai fini di: Aumento della quota di FER nel bilancio energetico complessivo della regione. L'attuazione della sottomisura aumenterà la quota di energie rinnovabili nel bilancio della società, che aumenterà la quota di energie rinnovabili nel bilancio energetico. La regione. Ciò ridurrà le emissioni di gas nocivi e polveri nell'atmosfera e aumenterà la competitività dell'azienda attraverso l'uso di fonti energetiche rinnovabili locali. A seguito dell'investimento, i costi associati al consumo energetico diminuiranno. (Italian)
    15 January 2022
    0 references

    Identifiers

    RPWM.04.01.00-28-0142/18
    0 references