Reconstruction of Voivodeship Road No. 109 on the Trzebusz – Trzebiatów section (Q138028): Difference between revisions
Jump to navigation
Jump to search
(Changed label, description and/or aliases in nl, and other parts: Adding Dutch translations) |
(Changed label, description and/or aliases in it, and other parts: Adding Italian translations) |
||||||||||||||
label / it | label / it | ||||||||||||||
Ricostruzione della strada provinciale n. 109 sul tratto Trzebusz — Trzebiatów | |||||||||||||||
Property / summary | |||||||||||||||
Oggetto dell'investimento è la ricostruzione e l'estensione della strada provinciale n. 109 insieme al passaggio attraverso la città di Nowielice ad una lunghezza di 2 723 m. Si tratta di una strada con parametri della strada principale "G". L'inizio della ricostruzione della strada si trova in km 6+ 396,38, mentre la fine nel 9+ 119,75 pique. L'inizio dello sviluppo relativo al drenaggio della strada si trova in km 6+ 300. Il percorso si dirige verso la città di Trzebiatów attraverso le aree coltivate e attraverso il villaggio di Nowielice. L'ambito dei lavori di pavimentazione comprende: la fresatura correttiva (locale), l'estensione della pavimentazione esistente, l'allineamento della base esistente con la massa bituminosa, la realizzazione di uno strato vincolante, la realizzazione di uno strato di usura con SMA, la realizzazione di una nuova costruzione a superficie completa su sezioni spogliate, la revisione della linea ciclabile esistente e la ricostruzione locale, la costruzione e la ricostruzione di sentieri pedonali. L'investimento riguarda inoltre: costruzione di elementi di sedazione del traffico (passi per pedoni sotto forma di asilo, isolotti che drenano il traffico nelle insenature della località), ricostruzione delle baie degli autobus, ricostruzione delle uscite esistenti, demolizione parziale della carreggiata esistente (nei luoghi di scoperte, nell'area del passaggio a livello, per la costruzione di una sezione fognaria nell'area del passaggio a livello), demolizione della pista di pedalata esistente, ricostruzione del ponte sul fiume Sarni consistente nell'estensione del ponte fino a una linea pedonale, costruzione di un sistema di scarico dell'acqua piovana (impianti di fognatura e di pulizia dell'acqua piovana), eliminazione di collisioni con reti d'arma del terreno (gas, elettricità), riarrangiamento del palo di illuminazione esistente, costruzione di drenaggio pluviale, abbattimento di alberi e cespugli in conflitto, ricostruzione di culverti esistenti, esecuzione di culverti sotto uscite, pulizia di culverti esistenti, regolazione dei fossi di drenaggio esistenti, esecuzione di marcature orizzontali e verticali. (Italian) | |||||||||||||||
Property / summary: Oggetto dell'investimento è la ricostruzione e l'estensione della strada provinciale n. 109 insieme al passaggio attraverso la città di Nowielice ad una lunghezza di 2 723 m. Si tratta di una strada con parametri della strada principale "G". L'inizio della ricostruzione della strada si trova in km 6+ 396,38, mentre la fine nel 9+ 119,75 pique. L'inizio dello sviluppo relativo al drenaggio della strada si trova in km 6+ 300. Il percorso si dirige verso la città di Trzebiatów attraverso le aree coltivate e attraverso il villaggio di Nowielice. L'ambito dei lavori di pavimentazione comprende: la fresatura correttiva (locale), l'estensione della pavimentazione esistente, l'allineamento della base esistente con la massa bituminosa, la realizzazione di uno strato vincolante, la realizzazione di uno strato di usura con SMA, la realizzazione di una nuova costruzione a superficie completa su sezioni spogliate, la revisione della linea ciclabile esistente e la ricostruzione locale, la costruzione e la ricostruzione di sentieri pedonali. L'investimento riguarda inoltre: costruzione di elementi di sedazione del traffico (passi per pedoni sotto forma di asilo, isolotti che drenano il traffico nelle insenature della località), ricostruzione delle baie degli autobus, ricostruzione delle uscite esistenti, demolizione parziale della carreggiata esistente (nei luoghi di scoperte, nell'area del passaggio a livello, per la costruzione di una sezione fognaria nell'area del passaggio a livello), demolizione della pista di pedalata esistente, ricostruzione del ponte sul fiume Sarni consistente nell'estensione del ponte fino a una linea pedonale, costruzione di un sistema di scarico dell'acqua piovana (impianti di fognatura e di pulizia dell'acqua piovana), eliminazione di collisioni con reti d'arma del terreno (gas, elettricità), riarrangiamento del palo di illuminazione esistente, costruzione di drenaggio pluviale, abbattimento di alberi e cespugli in conflitto, ricostruzione di culverti esistenti, esecuzione di culverti sotto uscite, pulizia di culverti esistenti, regolazione dei fossi di drenaggio esistenti, esecuzione di marcature orizzontali e verticali. (Italian) / rank | |||||||||||||||
Normal rank | |||||||||||||||
Property / summary: Oggetto dell'investimento è la ricostruzione e l'estensione della strada provinciale n. 109 insieme al passaggio attraverso la città di Nowielice ad una lunghezza di 2 723 m. Si tratta di una strada con parametri della strada principale "G". L'inizio della ricostruzione della strada si trova in km 6+ 396,38, mentre la fine nel 9+ 119,75 pique. L'inizio dello sviluppo relativo al drenaggio della strada si trova in km 6+ 300. Il percorso si dirige verso la città di Trzebiatów attraverso le aree coltivate e attraverso il villaggio di Nowielice. L'ambito dei lavori di pavimentazione comprende: la fresatura correttiva (locale), l'estensione della pavimentazione esistente, l'allineamento della base esistente con la massa bituminosa, la realizzazione di uno strato vincolante, la realizzazione di uno strato di usura con SMA, la realizzazione di una nuova costruzione a superficie completa su sezioni spogliate, la revisione della linea ciclabile esistente e la ricostruzione locale, la costruzione e la ricostruzione di sentieri pedonali. L'investimento riguarda inoltre: costruzione di elementi di sedazione del traffico (passi per pedoni sotto forma di asilo, isolotti che drenano il traffico nelle insenature della località), ricostruzione delle baie degli autobus, ricostruzione delle uscite esistenti, demolizione parziale della carreggiata esistente (nei luoghi di scoperte, nell'area del passaggio a livello, per la costruzione di una sezione fognaria nell'area del passaggio a livello), demolizione della pista di pedalata esistente, ricostruzione del ponte sul fiume Sarni consistente nell'estensione del ponte fino a una linea pedonale, costruzione di un sistema di scarico dell'acqua piovana (impianti di fognatura e di pulizia dell'acqua piovana), eliminazione di collisioni con reti d'arma del terreno (gas, elettricità), riarrangiamento del palo di illuminazione esistente, costruzione di drenaggio pluviale, abbattimento di alberi e cespugli in conflitto, ricostruzione di culverti esistenti, esecuzione di culverti sotto uscite, pulizia di culverti esistenti, regolazione dei fossi di drenaggio esistenti, esecuzione di marcature orizzontali e verticali. (Italian) / qualifier | |||||||||||||||
point in time: 15 January 2022
|
Revision as of 16:04, 15 January 2022
Project Q138028 in Poland
Language | Label | Description | Also known as |
---|---|---|---|
English | Reconstruction of Voivodeship Road No. 109 on the Trzebusz – Trzebiatów section |
Project Q138028 in Poland |
Statements
8,133,184.17 zloty
0 references
8,133,184.17 zloty
0 references
100.0 percent
0 references
12 February 2016
0 references
31 December 2017
0 references
WOJEWÓDZTWO ZACHODNIOPOMORSKIE
0 references
Przedmiotem inwestycji jest przebudowa i rozbudowa drogi wojewódzkiej nr 109 wraz z przejściem przez m. Nowielice na długości 2723 m. Jest to droga o parametrach drogi głównej "G". Początek przebudowy drogi znajduje się w km 6+396,38, natomiast koniec w pikiecie 9+119,75. Początek opracowania związany z odwodnieniem drogi zlokalizowany jest w km 6+300. Trasa przebiega w kierunku miasta Trzebiatów przez tereny uprawne oraz przez miejscowość Nowielice. Zakres robót nawierzchniowych obejmuje: korekcyjne (miejscowe) frezowanie nawierzchni, wykonanie poszerzeń istniejącej nawierzchni, wyrównanie istniejącej podbudowy masą bitumiczną, wykonanie warstwy wiążącej, wykonanie warstwy ścieralnej z SMA, wykonanie nowej pełnej konstrukcji nawierzchni na odcinkach rozbieranych, remont istniejącego ciągu rowerowego oraz lokalnie przebudowę, budowę i przebudowę ciągów pieszych. Ponadto niniejsza inwestycja swoim zakresem obejmuje: budowę elementów uspokojenia ruchu (przejścia dla pieszych w formie azyli, wysepki kanalizujące ruch na wlotach do miejscowości), przebudowę zatok autobusowych, przebudowę istniejących zjazdów, częściową rozbiórkę istniejącej jezdni (w miejscach przełomów, w rejonie przejazdu kolejowego, pod wykonanie odcinka kanalizacji w rejonie przejazdu kolejowego), rozbiórkę istniejącej kładki pieszo-rowerowej, przebudowę mostu na rzece Sarni polegająca na poszerzeniu mostu pod ciąg pieszo-rowerowy, budowę systemu odprowadzania ścieków opadowych (kanalizacja deszczowa oraz urządzenia oczyszczające), likwidację kolizji z sieciami uzbrojenia terenu (gaz, elektryka), przestawienie istniejącego słupa oświetleniowego, budowę kanalizacji deszczowej, wycinkę kolidujących drzew oraz krzewów, przebudowę istniejącego przepustu, wykonanie przepustów pod zjazdami, oczyszczenie istniejącego przepustu, regulacja istniejących rowów odwadniających, wykonanie oznakowania poziomego i pionowego. (Polish)
0 references
The subject of the investment is the reconstruction and extension of the Voivodeship Road No. 109 together with the crossing of Nowielice on the length of 2723 m. It is a road with parameters of the main road “G”. The beginning of the reconstruction of the road is in km 6 + 396.38, and the end in picket 9 + 119.75. The beginning of the development related to dehydration of the road is located in km 6+ 300. The route runs towards the town of Trzebiatów through the cultivated areas and through Nowielice. The scope of surface works includes: corrective (local) surface milling, execution of extensions of existing surfaces, equalisation of existing bituminous substructure, binding layer, construction of abrasive layer with SMA, execution of a new full pavement structure on undressed sections, renovation of the existing cycle line and local reconstruction, construction and reconstruction of pedestrian lines. In addition, this investment covers: construction of elements of tranquillity of traffic (passes for pedestrians in the form of azil, islets draining traffic to the village), reconstruction of bus bays, reconstruction of existing exits, partial demolition of the existing roadside (in places of breakthroughs, in the area of railway crossing, for construction of drainage section in the area of railway crossing), demolition of the existing bridge of the lining, reconstruction of the bridge on the river Sarni consisting of the extension of the bridge-continuation, (English)
21 October 2020
0 references
L’objet de l’investissement est la reconstruction et l’extension de la route provinciale no 109 ainsi que le passage à travers la ville de Nowielice sur une longueur de 2 723 m. C’est une route avec les paramètres de la route principale «G». Le début de la reconstruction de la route se situe au km 6+ 396.38, tandis que la fin de la route 9+ 119.75 pique. Le début du développement lié au drainage de la route se situe au km 6+ 300. La route mène vers la ville de Trzebiatów à travers les zones cultivées et à travers le village de Nowielice. Le champ d’application des travaux de chaussée comprend: fraisage (local) correcteur de chaussées, extension de la chaussée existante, alignement de la base existante avec masse bitumineuse, fabrication d’une couche de liaison, fabrication d’une couche d’usure avec SMA, réalisation d’une nouvelle construction de surface complète sur des tronçons dénudés, révision de la ligne cyclable existante et reconstruction locale, construction et reconstruction de sentiers piétonniers. En outre, cet investissement couvre: construction d’éléments de sédation de la circulation (passages pour piétons sous forme d’asile, îlots drainant la circulation aux entrées de la localité), reconstruction de baies d’autobus, reconstruction des sorties existantes, démolition partielle de la route existante (dans les lieux de percées, dans la zone du passage à niveau, pour la construction d’un tronçon d’égouts dans la zone du passage à niveau), démolition de la piste piétonne existante, reconstruction du pont sur la rivière Sarni consistant en l’extension du pont jusqu’à une ligne piétonnière, construction d’un système d’évacuation des eaux pluviales (égout d’égout et équipement de nettoyage), élimination des collisions avec les réseaux d’armes de terrain (gaz, électricité), réaménagement du poteau d’éclairage existant, construction d’égouts pluviaux, abattage d’arbres et de buissons en conflit, reconstruction des ponceaux existants, exécution des ponceaux sous les issues, nettoyage des ponceaux existants, réglage des fossés de drainage existants, exécution de marquages horizontaux et verticaux. (French)
2 December 2021
0 references
Gegenstand der Investition ist der Wiederaufbau und die Erweiterung der Provinzstraße Nr. 109 zusammen mit dem Durchgang durch die Stadt Nowielice auf einer Länge von 2 723 m. Es ist eine Straße mit Parametern der Hauptstraße „G“. Der Beginn des Umbaus der Straße befindet sich in km 6+ 396.38, während das Ende in der 9+ 119,75 pique. Der Beginn der Entwicklung im Zusammenhang mit der Entwässerung der Straße befindet sich in km 6+ 300. Die Route verläuft in Richtung Trzebiatów durch die Anbaugebiete und durch das Dorf Nowielice. Der Umfang der Straßenbauarbeiten umfasst: korrigierendes (lokales) Straßenfräsen, Erweiterung des bestehenden Gehsteigs, Ausrichtung der bestehenden Basis mit bituminöser Masse, Herstellung einer Bindeschicht, Herstellung einer Verschleißschicht mit SMA, Herstellung einer neuen Vollflächenkonstruktion auf gestreiften Abschnitten, Überholung der bestehenden Radlinie und lokale Rekonstruktion, Bau und Wiederaufbau von Fußgängerwegen. Darüber hinaus umfasst diese Investition: Bau von Verkehrssedierungselementen (Pässe für Fußgänger in Form von Asyln, Inselchen, die den Verkehr an den Eingängen zur Lokalität entwässern), Umbau von Busbuchten, Umbau bestehender Ausgänge, teilweiser Abriss der bestehenden Straße (in den Durchbrüchen, im Bereich des Bahnübergangs, für den Bau eines Kanalisationsabschnitts im Bereich der Bahnübergang), Abriss der bestehenden Fussradstrecke, Wiederaufbau der Brücke auf dem Sarni-Fluss, bestehend aus dem Ausbau der Brücke auf eine Fußgänger-Radlinie, Bau eines Regenwasserableitungssystems (Regenwasserkanal und Reinigungsausrüstung), Beseitigung von Kollisionen mit Geländewaffennetzwerken (Gas, Elektrik), Umlagerung des vorhandenen Beleuchtungsstöckes, Bau der Regenentwässerung, Abfällung von widersprüchlichen Bäumen und Sträuchern, Rekonstruktion vorhandener Schiefer, Ausführung von Abzweigungen unter Ausgängen, Reinigung vorhandener Spulen, Anpassung bestehender Entwässerungsgräben, Ausführung horizontaler und vertikaler Markierungen. (German)
13 December 2021
0 references
Het doel van de investering is de wederopbouw en uitbreiding van de provinciale weg nr. 109 samen met de doorgang door de stad Nowielice op een lengte van 2 723 m. Het is een weg met parameters van de hoofdweg „G”. Het begin van de wederopbouw van de weg is gelegen in km 6+ 396,38, terwijl het einde in de 9+ 119,75 pique. Het begin van de ontwikkeling in verband met de afwatering van de weg bevindt zich in km 6+ 300. De route loopt naar de stad Trzebiatów door de bebouwde gebieden en door het dorp Nowielice. Het toepassingsgebied van de bestratingswerkzaamheden omvat: correctieve (lokale) bestrating frezen, uitbreiding van bestaande bestrating, uitlijning van de bestaande basis met bitumineuze massa, het maken van een bindlaag, het maken van een slijtlaag met SMA, het maken van een nieuwe volledige oppervlakte constructie op gestripte secties, revisie van de bestaande cycluslijn en lokale wederopbouw, bouw en reconstructie van voetgangerspaden. Bovendien heeft deze investering betrekking op: bouw van verkeerssedatie-elementen (bruggen voor voetgangers in de vorm van asiel, eilandjes die het verkeer aan de inham’s naar de plaats aftappen), reconstructie van busbekkens, wederopbouw van bestaande uitgangen, gedeeltelijke sloop van de bestaande weg (op de plaatsen van doorbraken, in het gebied van de spoorwegovergang, voor de aanleg van een rioolgedeelte in het gebied van de overweg), sloop van de bestaande voetfietsbaan, wederopbouw van de brug op de Sarni, bestaande uit de uitbreiding van de brug tot een voetgangerscycluslijn, de bouw van een afvoersysteem voor regenwater (regenwaterzuiveringsinstallatie en reinigingsapparatuur); verwijdering van botsingen met terreinwapennetwerken (gas, elektriciteit), herschikking van de bestaande verlichtingspaal, aanleg van regenafvoer, het kappen van conflicterende bomen en struiken, reconstructie van bestaande duikers, uitvoering van duikers onder uitgangen, reiniging van bestaande duikers, aanpassing van bestaande drainage sloten, uitvoering van horizontale en verticale markeringen. (Dutch)
17 December 2021
0 references
Oggetto dell'investimento è la ricostruzione e l'estensione della strada provinciale n. 109 insieme al passaggio attraverso la città di Nowielice ad una lunghezza di 2 723 m. Si tratta di una strada con parametri della strada principale "G". L'inizio della ricostruzione della strada si trova in km 6+ 396,38, mentre la fine nel 9+ 119,75 pique. L'inizio dello sviluppo relativo al drenaggio della strada si trova in km 6+ 300. Il percorso si dirige verso la città di Trzebiatów attraverso le aree coltivate e attraverso il villaggio di Nowielice. L'ambito dei lavori di pavimentazione comprende: la fresatura correttiva (locale), l'estensione della pavimentazione esistente, l'allineamento della base esistente con la massa bituminosa, la realizzazione di uno strato vincolante, la realizzazione di uno strato di usura con SMA, la realizzazione di una nuova costruzione a superficie completa su sezioni spogliate, la revisione della linea ciclabile esistente e la ricostruzione locale, la costruzione e la ricostruzione di sentieri pedonali. L'investimento riguarda inoltre: costruzione di elementi di sedazione del traffico (passi per pedoni sotto forma di asilo, isolotti che drenano il traffico nelle insenature della località), ricostruzione delle baie degli autobus, ricostruzione delle uscite esistenti, demolizione parziale della carreggiata esistente (nei luoghi di scoperte, nell'area del passaggio a livello, per la costruzione di una sezione fognaria nell'area del passaggio a livello), demolizione della pista di pedalata esistente, ricostruzione del ponte sul fiume Sarni consistente nell'estensione del ponte fino a una linea pedonale, costruzione di un sistema di scarico dell'acqua piovana (impianti di fognatura e di pulizia dell'acqua piovana), eliminazione di collisioni con reti d'arma del terreno (gas, elettricità), riarrangiamento del palo di illuminazione esistente, costruzione di drenaggio pluviale, abbattimento di alberi e cespugli in conflitto, ricostruzione di culverti esistenti, esecuzione di culverti sotto uscite, pulizia di culverti esistenti, regolazione dei fossi di drenaggio esistenti, esecuzione di marcature orizzontali e verticali. (Italian)
15 January 2022
0 references
Identifiers
RPZP.05.01.00-32-0002/16
0 references