Comprehensive energy modernisation of public buildings in Rozogi commune (Q132323): Difference between revisions

From EU Knowledge Graph
Jump to navigation Jump to search
(‎Changed label, description and/or aliases in nl, and other parts: Adding Dutch translations)
(‎Changed label, description and/or aliases in it, and other parts: Adding Italian translations)
label / itlabel / it
 
Ammodernamento energetico completo degli edifici pubblici nel comune di Rozogi
Property / summary
 
Sedi del progetto: 1. Amministrazione locale prescolare a Rozogy "La terra del sorriso" — ul. Wielbarska 1, Rozogi, trama: 73/3 2. Ufficio comunale — ul. 22 luglio 22, Rozogi, terreno: 244/1 Il progetto prevede i seguenti lavori di costruzione: isolamento delle pareti esterne, riscaldamento del tetto, riscaldamento dei pavimenti, isolamento dei soffitti, sostituzione di finestre e porte, ammodernamento dell'impianto CO sostituendo le caldaie ad olio esistenti per la biomassa, sostituzione dei riscaldatori esistenti con nuovi termostati con funzioni di adattamento e ottimizzazione, sostituzione dell'isolamento esistente nelle cantine per nuove caldaie, ammodernamento dell'illuminazione — installazione di apparecchi a LED, installazione di impianti fotovoltaici. Fasi di attuazione del progetto: —presentare una domanda di dof. firma di un contratto DIF. —selezione del contraente/contraente -Conclusione del contratto -esecuzione dei lavori -Completazione del progetto e firma del protocollo finale -Risoluzione finale dell'attuazione del progetto dell'ambito di applicazione materiale: — firma del contratto — esecuzione dei lavori — accettazione finale e firma di Proj. è in linea con le ipotesi inserite nel tema obiettivo SzOOP RPOWWM. 4, obiettivo specifico: Maggiore efficienza di energet. in usable. edifici pubblici. La presente direttiva mira a migliorare l'efficienza degli edifici oggetto della proposta. I lavori previsti si inseriscono nei tipi di progetti da realizzare e attuano gli indicatori fissati per l'attuazione. L'efficienza energetica è al centro della politica energetica europea ed è uno dei principali obiettivi delle perdite. Europa 2020. Un uso efficiente dell'energia può contribuire in modo significativo al conseguimento dell'obiettivo di basse emissioni di carbonio e alla lotta contro i cambiamenti climatici. Gli investimenti nell'efficienza energetica nell'edificio apportano notevoli risparmi energetici, sostenendo allo stesso tempo la crescita e lo sviluppo sostenibile. (Italian)
Property / summary: Sedi del progetto: 1. Amministrazione locale prescolare a Rozogy "La terra del sorriso" — ul. Wielbarska 1, Rozogi, trama: 73/3 2. Ufficio comunale — ul. 22 luglio 22, Rozogi, terreno: 244/1 Il progetto prevede i seguenti lavori di costruzione: isolamento delle pareti esterne, riscaldamento del tetto, riscaldamento dei pavimenti, isolamento dei soffitti, sostituzione di finestre e porte, ammodernamento dell'impianto CO sostituendo le caldaie ad olio esistenti per la biomassa, sostituzione dei riscaldatori esistenti con nuovi termostati con funzioni di adattamento e ottimizzazione, sostituzione dell'isolamento esistente nelle cantine per nuove caldaie, ammodernamento dell'illuminazione — installazione di apparecchi a LED, installazione di impianti fotovoltaici. Fasi di attuazione del progetto: —presentare una domanda di dof. firma di un contratto DIF. —selezione del contraente/contraente -Conclusione del contratto -esecuzione dei lavori -Completazione del progetto e firma del protocollo finale -Risoluzione finale dell'attuazione del progetto dell'ambito di applicazione materiale: — firma del contratto — esecuzione dei lavori — accettazione finale e firma di Proj. è in linea con le ipotesi inserite nel tema obiettivo SzOOP RPOWWM. 4, obiettivo specifico: Maggiore efficienza di energet. in usable. edifici pubblici. La presente direttiva mira a migliorare l'efficienza degli edifici oggetto della proposta. I lavori previsti si inseriscono nei tipi di progetti da realizzare e attuano gli indicatori fissati per l'attuazione. L'efficienza energetica è al centro della politica energetica europea ed è uno dei principali obiettivi delle perdite. Europa 2020. Un uso efficiente dell'energia può contribuire in modo significativo al conseguimento dell'obiettivo di basse emissioni di carbonio e alla lotta contro i cambiamenti climatici. Gli investimenti nell'efficienza energetica nell'edificio apportano notevoli risparmi energetici, sostenendo allo stesso tempo la crescita e lo sviluppo sostenibile. (Italian) / rank
 
Normal rank
Property / summary: Sedi del progetto: 1. Amministrazione locale prescolare a Rozogy "La terra del sorriso" — ul. Wielbarska 1, Rozogi, trama: 73/3 2. Ufficio comunale — ul. 22 luglio 22, Rozogi, terreno: 244/1 Il progetto prevede i seguenti lavori di costruzione: isolamento delle pareti esterne, riscaldamento del tetto, riscaldamento dei pavimenti, isolamento dei soffitti, sostituzione di finestre e porte, ammodernamento dell'impianto CO sostituendo le caldaie ad olio esistenti per la biomassa, sostituzione dei riscaldatori esistenti con nuovi termostati con funzioni di adattamento e ottimizzazione, sostituzione dell'isolamento esistente nelle cantine per nuove caldaie, ammodernamento dell'illuminazione — installazione di apparecchi a LED, installazione di impianti fotovoltaici. Fasi di attuazione del progetto: —presentare una domanda di dof. firma di un contratto DIF. —selezione del contraente/contraente -Conclusione del contratto -esecuzione dei lavori -Completazione del progetto e firma del protocollo finale -Risoluzione finale dell'attuazione del progetto dell'ambito di applicazione materiale: — firma del contratto — esecuzione dei lavori — accettazione finale e firma di Proj. è in linea con le ipotesi inserite nel tema obiettivo SzOOP RPOWWM. 4, obiettivo specifico: Maggiore efficienza di energet. in usable. edifici pubblici. La presente direttiva mira a migliorare l'efficienza degli edifici oggetto della proposta. I lavori previsti si inseriscono nei tipi di progetti da realizzare e attuano gli indicatori fissati per l'attuazione. L'efficienza energetica è al centro della politica energetica europea ed è uno dei principali obiettivi delle perdite. Europa 2020. Un uso efficiente dell'energia può contribuire in modo significativo al conseguimento dell'obiettivo di basse emissioni di carbonio e alla lotta contro i cambiamenti climatici. Gli investimenti nell'efficienza energetica nell'edificio apportano notevoli risparmi energetici, sostenendo allo stesso tempo la crescita e lo sviluppo sostenibile. (Italian) / qualifier
 
point in time: 15 January 2022
Timestamp+2022-01-15T00:00:00Z
Timezone+00:00
CalendarGregorian
Precision1 day
Before0
After0

Revision as of 15:06, 15 January 2022

Project Q132323 in Poland
Language Label Description Also known as
English
Comprehensive energy modernisation of public buildings in Rozogi commune
Project Q132323 in Poland

    Statements

    0 references
    837,244.62 zloty
    0 references
    200,938.71 Euro
    13 January 2020
    0 references
    1,034,913.0 zloty
    0 references
    248,379.12 Euro
    13 January 2020
    0 references
    80.9 percent
    0 references
    22 November 2016
    0 references
    15 December 2020
    0 references
    GMINA ROZOGI
    0 references
    0 references

    53°28'56.6"N, 21°21'34.9"E
    0 references
    Miejsca realizacji projektu: 1.Przedszkole Samorządowe w Rozogach "Kraina Uśmiechu" – ul. Wielbarska 1, Rozogi, działka: 73/3 2.Urząd Gminy – ul. 22 Lipca 22, Rozogi, działka: 244/1 W ramach projektu przewiduje się wykonanie następujących prac budowlanych: docieplenie ścian zewnętrznych, docieplenie dachu, docieplenie stropodachu, docieplenie stropów, wymianę okien i drzwi, modernizację cwu, modernizację instalacji CO poprzez wymianę istniejących kotłów olejowych ba kotły na biomasę, wymianę istniejących grzejników na nowe z termostatami z funkcjami adaptacyjną i optymalizującą, wymianę istniejącej izolacji na przewodach rozprowadzających do piwnic na nową, modernizacja oświetlenie - montaż opraw LED, montaż instalacji PV. szczegółowy opis robót zawarto w SW oraz harmonogramie rzeczowo-finansowym. Etapy realizacji projektu: -złożenie wniosku o dof. -podpisanie umowy o dof. -wybór wykonawcy/wykonawców -zawarcie umowy -realizacja prac -zakończenie projektu i podpisanie prot. końcowego -końcowe rozliczenie proj. sposób wdrażania zakresu rzeczowego: - podpisanie umowy - realizacja prac - odbiór końcowy i podpisanie prot. Proj. wpisuje się w założenia wpisane w SzOOP RPOWWM Cel temat. 4, cel szczegółowy: Zwiększona efektywność energet. w budynkach użytecz.publicznej. Przedmiotowa inwes. zmierza do poprawy efektyw. budynków objętych wnioskiem. Przewidziane prace wpisują się w typy projektów przewidzianych do realizacji oraz realizują założone do realizacji wskaźniki. Efektywność energet. leży u podstaw europejskiej polityki energet. i jest jednym z głównych celów strat. „Europa 2020”. Efektywne zużycie energii może znacząco przyczynić się do osiągnięcia celu w postaci gosp. niskoemisyjnej i walki ze zmianami klimatycz. Inwestycja na rzecz efektywności energet. w budynku przynosi znaczne oszczędności energii,jednocześnie wspierając wzrost gosp. i zrównoważony rozwój. (Polish)
    0 references
    Places of implementation of the project: 1.The Local Government Preschool in Rozogach “The Land of the Smile” – ul. Camel 1, Rozogi, parcel: 73/3 2.Gmina Office – ul. 22 July 22, Rozogi, parcel: 244/1 The project envisages the following construction works: insulation of external walls, roof warming, warming of ceilings, warming of ceilings, replacement of windows and doors, modernisation of the installation of CO by replacing existing boilers for biomass, replacement of existing heaters with thermostats with adaptive and optimisation functions, replacement of existing insulation on the cellars for new, modernisation of lighting – installation of LED luminaires and detailed installation of PV. Stages of project implementation: —submission of an application for DOF. —signing of the DOF agreement. —selection of contractors/contractors -conclusion of contract -implementation of works -completion of the project and signing of the final minutes -final settlement of the project method of implementation of the material scope: — signing of the contract – execution of works – final acceptance and signing of the protocol. The project is part of the assumptions entered in the Polish Academy of Sciences. 4, specific objective: Increased efficiency of energet. in buildings of public use. This inwes is aimed at improving the efficiency of the proposed buildings. The planned work fits into the types of projects to be implemented and implements the indicators set for implementation. Energy efficiency is at the heart of European energy policy and is one of the main goals of losses. Europe 2020. Efficient energy consumption can make a significant contribution to achieving the goal of low-carbon gossip and combating climate change. The investment for energy efficiency in the building brings significant energy savings, while at the same time supporting housing growth and sustainable development. (English)
    21 October 2020
    0 references
    Lieux du projet: 1. L’école préscolaire de l’administration locale à Rozogy «Le pays du sourire» — ul. Wielbarska 1, Rozogi, parcelle: 73/3 2. Bureau de la municipalité — ul. 22 juillet 22, Rozogi, parcelle: 244/1 Le projet prévoit les travaux de construction suivants: isolation des murs extérieurs, réchauffement du toit, réchauffement des planchers, isolation des plafonds, remplacement des fenêtres et des portes, modernisation de l’installation CO par remplacement des chaudières à huile existantes pour la biomasse, remplacement des appareils de chauffage existants par de nouveaux thermostats avec fonctions adaptatives et d’optimisation, remplacement de l’isolation existante sur les caves pour les nouvelles, modernisation de l’éclairage — installation de luminaires LED, installation d’installations photovoltaïques. Une description détaillée des travaux est incluse dans le SW et le calendrier matériel et financier. Étapes de la mise en œuvre du projet: —présenter une demande de dof. signature d’un contrat. —sélection du contractant/contractants -Conclusion du contrat -Mise en œuvre des travaux — Achèvement du projet et signature du protocole final -Réglementation définitive de la mise en œuvre du projet du champ d’application matériel: — signature du contrat — exécution des travaux — réception finale et signature de la Proj. est conforme aux hypothèses figurant dans le thème objectif SzOOP RPOWWM. 4, objectif spécifique: Efficacité accrue de l’énerget. dans les bâtiments publics. Ce projet vise à améliorer l’efficacité des bâtiments couverts par la proposition. Les travaux prévus s’inscrivent dans les types de projets à réaliser et mettent en œuvre les indicateurs fixés pour la mise en œuvre. L’efficacité énergétique est au cœur de la politique énergétique européenne et constitue l’un des principaux objectifs des pertes. Europe 2020. Une utilisation efficace de l’énergie peut contribuer de manière significative à la réalisation de l’objectif de réduction des émissions de carbone et à la lutte contre le changement climatique. Les investissements dans l’efficacité énergétique dans le bâtiment génèrent d’importantes économies d’énergie tout en soutenant la croissance et le développement durable. (French)
    2 December 2021
    0 references
    Veranstaltungsorte des Projekts: 1. Gemeindevorschule in Rozogy „Das Land des Lächelns“ – ul. Wielbarska 1, Rozogi, Grundstück: 73/3 2. Gemeindeamt – ul. 22. Juli 22, Rozogi, Grundstück: 244/1 Das Projekt sieht folgende Bauarbeiten vor: Isolierung von Außenwänden, Erwärmung des Daches, Erwärmung der Böden, Isolierung der Decken, Austausch von Fenstern und Türen, Modernisierung der CO-Anlage durch Ersetzen bestehender Ölkessel für Biomasse, Austausch bestehender Heizgeräte durch neue Thermostaten durch adaptive und Optimierungsfunktionen, Ersatz der vorhandenen Isolierung auf den Kellern für neue, Modernisierung der Beleuchtung – Installation von LED-Leuchten, Installation von PV-Anlagen. Eine detaillierte Beschreibung der Arbeiten ist in der SW sowie im Material- und Finanzplan enthalten. Phasen der Projektdurchführung: —einen Antrag auf Dof einreichen. Unterzeichnung eines Dof-Vertrags. —Auswahl des Auftragnehmers/Auftragnehmers – Vertragsschluss – Durchführung der Arbeiten – Abschluss des Projekts und Unterzeichnung des Schlussprotokolls – Abschluss der Durchführung des Projekts in Bezug auf den sachlichen Anwendungsbereich: — die Unterzeichnung des Vertrags – Ausführung der Arbeiten – endgültige Abnahme und Unterzeichnung von Proj. steht im Einklang mit den im SzOOP RPOWM-Zielthema enthaltenen Annahmen. 4, spezifisches Ziel: Steigerung der Effizienz von energet. in nutzbar. öffentlichen Gebäuden. Dies zielt darauf ab, die Effizienz der unter den Vorschlag fallenden Gebäude zu verbessern. Die geplanten Arbeiten passen in die Art der durchzuführenden Projekte und setzen die für die Durchführung festgelegten Indikatoren um. Die Energieeffizienz steht im Mittelpunkt der europäischen Energiepolitik und ist eines der Hauptziele von Verlusten. Europa 2020. Eine effiziente Energienutzung kann einen wesentlichen Beitrag zur Erreichung des CO2-armen Ziels und zur Bekämpfung des Klimawandels leisten. Investitionen in die Energieeffizienz in das Gebäude führen zu erheblichen Energieeinsparungen und unterstützen gleichzeitig Wachstum und nachhaltige Entwicklung. (German)
    9 December 2021
    0 references
    Locaties van het project: 1. Lokale overheid Preschool in Rozogy „Het Land van Smile” — ul. Wielbarska 1, Rozogi, perceel: 73/3 2. Gemeentekantoor — ul. 22 juli 22, Rozogi, perceel: 244/1 Het project voorziet in de volgende bouwwerkzaamheden: isolatie van buitenmuren, opwarming van het dak, verwarming van vloeren, isolatie van plafonds, vervanging van ramen en deuren, modernisering van de CO-installatie door vervanging van bestaande olieketels voor biomassa, vervanging van bestaande verwarmingstoestellen door nieuwe thermostaten met adaptieve en optimalisatiefuncties, vervanging van de bestaande isolatie op de kelders voor nieuwe, modernisering van de verlichting — installatie van LED-armaturen, installatie van PV-installaties. Een gedetailleerde beschrijving van de werkzaamheden is opgenomen in de SW en het materiële en financiële schema. Fasen van de uitvoering van het project: —een aanvraag indienen voor dof. —ondertekent een dofcontract. —selectie van de contractant/contractanten — Sluiting van het contract -Uitvoering van de werkzaamheden — Voltooiing van het project en ondertekening van het definitieve protocol -eindafrekening van de uitvoering van het project voor de materiële werkingssfeer: — ondertekening van het contract — uitvoering van de werkzaamheden — definitieve oplevering en ondertekening van Proj. is in overeenstemming met de veronderstellingen die zijn opgenomen in het SzOOP RPOWWM Doelstellingsthema. 4, Specifieke doelstelling: Verhoogde efficiëntie van energet. in bruikbaar. openbare gebouwen. Dit voorstel beoogt de efficiëntie van de gebouwen waarop het voorstel betrekking heeft, te verbeteren. De geplande werkzaamheden passen in de soorten projecten die moeten worden uitgevoerd en implementeren de voor de uitvoering vastgestelde indicatoren. Energie-efficiëntie staat centraal in het Europese energiebeleid en is een van de belangrijkste doelstellingen van verlies. Europa 2020. Efficiënt energiegebruik kan een belangrijke bijdrage leveren aan de verwezenlijking van de koolstofarme doelstelling en de strijd tegen de klimaatverandering. Investeringen in energie-efficiëntie in het gebouw zorgen voor aanzienlijke energiebesparingen en ondersteunen tegelijkertijd groei en duurzame ontwikkeling. (Dutch)
    17 December 2021
    0 references
    Sedi del progetto: 1. Amministrazione locale prescolare a Rozogy "La terra del sorriso" — ul. Wielbarska 1, Rozogi, trama: 73/3 2. Ufficio comunale — ul. 22 luglio 22, Rozogi, terreno: 244/1 Il progetto prevede i seguenti lavori di costruzione: isolamento delle pareti esterne, riscaldamento del tetto, riscaldamento dei pavimenti, isolamento dei soffitti, sostituzione di finestre e porte, ammodernamento dell'impianto CO sostituendo le caldaie ad olio esistenti per la biomassa, sostituzione dei riscaldatori esistenti con nuovi termostati con funzioni di adattamento e ottimizzazione, sostituzione dell'isolamento esistente nelle cantine per nuove caldaie, ammodernamento dell'illuminazione — installazione di apparecchi a LED, installazione di impianti fotovoltaici. Fasi di attuazione del progetto: —presentare una domanda di dof. firma di un contratto DIF. —selezione del contraente/contraente -Conclusione del contratto -esecuzione dei lavori -Completazione del progetto e firma del protocollo finale -Risoluzione finale dell'attuazione del progetto dell'ambito di applicazione materiale: — firma del contratto — esecuzione dei lavori — accettazione finale e firma di Proj. è in linea con le ipotesi inserite nel tema obiettivo SzOOP RPOWWM. 4, obiettivo specifico: Maggiore efficienza di energet. in usable. edifici pubblici. La presente direttiva mira a migliorare l'efficienza degli edifici oggetto della proposta. I lavori previsti si inseriscono nei tipi di progetti da realizzare e attuano gli indicatori fissati per l'attuazione. L'efficienza energetica è al centro della politica energetica europea ed è uno dei principali obiettivi delle perdite. Europa 2020. Un uso efficiente dell'energia può contribuire in modo significativo al conseguimento dell'obiettivo di basse emissioni di carbonio e alla lotta contro i cambiamenti climatici. Gli investimenti nell'efficienza energetica nell'edificio apportano notevoli risparmi energetici, sostenendo allo stesso tempo la crescita e lo sviluppo sostenibile. (Italian)
    15 January 2022
    0 references

    Identifiers

    RPWM.04.03.01-28-0081/17
    0 references