Improving the energy efficiency of public utility buildings in Piekoszów municipality (Q127880): Difference between revisions

From EU Knowledge Graph
Jump to navigation Jump to search
(‎Changed label, description and/or aliases in nl, and other parts: Adding Dutch translations)
(‎Changed label, description and/or aliases in it, and other parts: Adding Italian translations)
label / itlabel / it
 
Aumentare l'efficienza energetica degli edifici pubblici nel comune di Piekoszów
Property / summary
 
Il progetto prevede azioni di modernizzazione energetica globale di 3 edifici pubblici: Ufficio municipale (UG), scuola primaria di Łosien (SP in Łosien), dipartimento dei servizi municipali (ZUK). con una superficie totale di utilizzo di edifici 2 334,8 m², che sarà effettuata conformemente ai risultati degli audit energetici, nell'ambito di applicazione, tra l'altro, a: isolamento dell'impianto, sostituzione di finestre, porte esterne, ricostruzione di impianti di riscaldamento (compresa la sostituzione di fonti di calore — rimozione di forni per il riscaldamento a carbone, sostituzione del combustibile con biomassa), installazione di fonti di energia rinnovabili in edifici modificati dall'energia. L'investimento contribuirà a ridurre le emissioni di CO2 e altri inquinanti atmosferici e ad aumentare notevolmente il risparmio energetico — 81 % per il progetto. Il costo totale ammissibile del progetto è pari a 1951297,24 PLN lordo e include l'IVA. Il progetto oggetto del presente studio di fattibilità non costituisce un aiuto di Stato e non costituisce un grande progetto ai sensi dell'articolo 100 del regolamento (UE) n. 1303/2013. Sulla base dell'analisi finanziaria e tenendo conto di tutte le condizioni di cui all'articolo 61 del regolamento n. 1303/2013, questo progetto non rientra in nessuna delle categorie di progetti generatori di entrate. Nell'ambito dell'azione preparatoria, gli audit energetici sono stati sviluppati nel 2016 e nel secondo trimestre. Studio di fattibilità del 2017. I lavori di costruzione e i servizi di supervisione e promozione dell'edilizia sono previsti per il 2018. Il rispetto del progetto con il POR WŚ 2014-2020 è descritto nella sezione seguente. (Italian)
Property / summary: Il progetto prevede azioni di modernizzazione energetica globale di 3 edifici pubblici: Ufficio municipale (UG), scuola primaria di Łosien (SP in Łosien), dipartimento dei servizi municipali (ZUK). con una superficie totale di utilizzo di edifici 2 334,8 m², che sarà effettuata conformemente ai risultati degli audit energetici, nell'ambito di applicazione, tra l'altro, a: isolamento dell'impianto, sostituzione di finestre, porte esterne, ricostruzione di impianti di riscaldamento (compresa la sostituzione di fonti di calore — rimozione di forni per il riscaldamento a carbone, sostituzione del combustibile con biomassa), installazione di fonti di energia rinnovabili in edifici modificati dall'energia. L'investimento contribuirà a ridurre le emissioni di CO2 e altri inquinanti atmosferici e ad aumentare notevolmente il risparmio energetico — 81 % per il progetto. Il costo totale ammissibile del progetto è pari a 1951297,24 PLN lordo e include l'IVA. Il progetto oggetto del presente studio di fattibilità non costituisce un aiuto di Stato e non costituisce un grande progetto ai sensi dell'articolo 100 del regolamento (UE) n. 1303/2013. Sulla base dell'analisi finanziaria e tenendo conto di tutte le condizioni di cui all'articolo 61 del regolamento n. 1303/2013, questo progetto non rientra in nessuna delle categorie di progetti generatori di entrate. Nell'ambito dell'azione preparatoria, gli audit energetici sono stati sviluppati nel 2016 e nel secondo trimestre. Studio di fattibilità del 2017. I lavori di costruzione e i servizi di supervisione e promozione dell'edilizia sono previsti per il 2018. Il rispetto del progetto con il POR WŚ 2014-2020 è descritto nella sezione seguente. (Italian) / rank
 
Normal rank
Property / summary: Il progetto prevede azioni di modernizzazione energetica globale di 3 edifici pubblici: Ufficio municipale (UG), scuola primaria di Łosien (SP in Łosien), dipartimento dei servizi municipali (ZUK). con una superficie totale di utilizzo di edifici 2 334,8 m², che sarà effettuata conformemente ai risultati degli audit energetici, nell'ambito di applicazione, tra l'altro, a: isolamento dell'impianto, sostituzione di finestre, porte esterne, ricostruzione di impianti di riscaldamento (compresa la sostituzione di fonti di calore — rimozione di forni per il riscaldamento a carbone, sostituzione del combustibile con biomassa), installazione di fonti di energia rinnovabili in edifici modificati dall'energia. L'investimento contribuirà a ridurre le emissioni di CO2 e altri inquinanti atmosferici e ad aumentare notevolmente il risparmio energetico — 81 % per il progetto. Il costo totale ammissibile del progetto è pari a 1951297,24 PLN lordo e include l'IVA. Il progetto oggetto del presente studio di fattibilità non costituisce un aiuto di Stato e non costituisce un grande progetto ai sensi dell'articolo 100 del regolamento (UE) n. 1303/2013. Sulla base dell'analisi finanziaria e tenendo conto di tutte le condizioni di cui all'articolo 61 del regolamento n. 1303/2013, questo progetto non rientra in nessuna delle categorie di progetti generatori di entrate. Nell'ambito dell'azione preparatoria, gli audit energetici sono stati sviluppati nel 2016 e nel secondo trimestre. Studio di fattibilità del 2017. I lavori di costruzione e i servizi di supervisione e promozione dell'edilizia sono previsti per il 2018. Il rispetto del progetto con il POR WŚ 2014-2020 è descritto nella sezione seguente. (Italian) / qualifier
 
point in time: 15 January 2022
Timestamp+2022-01-15T00:00:00Z
Timezone+00:00
CalendarGregorian
Precision1 day
Before0
After0

Revision as of 14:25, 15 January 2022

Project Q127880 in Poland
Language Label Description Also known as
English
Improving the energy efficiency of public utility buildings in Piekoszów municipality
Project Q127880 in Poland

    Statements

    0 references
    1,658,307.67 zloty
    0 references
    397,993.84 Euro
    13 January 2020
    0 references
    1,950,950.2 zloty
    0 references
    468,228.05 Euro
    13 January 2020
    0 references
    85.0 percent
    0 references
    25 July 2016
    0 references
    31 October 2018
    0 references
    GMINA PIEKOSZÓW
    0 references
    Projekt zakłada działania dotyczące kompleksowej modernizacji energetycznej 3 budynków publicznych: Urzędu Gminy (UG), Szkoły Podstawowej w Łosieniu (SP w Łosieniu), Zakładu Usług Komunalnych (ZUK). o łącznej pow. użytk. budynków 2334,8 m2., która będzie dokonana zgodnie z wynikami audytów energetycznych, w zakresie związanym m.in. z: ociepleniem obiektu, wymianą okien, drzwi zewnętrznych, przebudową systemów grzewczych (wraz z wymianą źródła ciepła – likwidacja pieców grzewczych na węgiel, zastąpienie paliwa biomasą), instalacją OZE w modernizowanych energetycznie budynkach. Inwestycja przyczyni się do zmniejszenia emisji CO2 i innych zanieczyszczeń powietrza oraz do znacznego zwiększenia oszczędności energii - wartość dla projektu 81%. Całkowity koszt kwalifikowalny projektu wynosi 1951297,24 zł. brutto i zawiera podatek VAT. Projekt objęty niniejszym studium wykonalności nie stanowi pomocy publicznej oraz nie należy do dużych projektów w rozumieniu art. 100 rozporządzenia nr 1303/2013. Na podstawie analizy finansowej oraz przy uwzględnieniu wszystkich przesłanek wskazanych w art. 61 rozporządzenia nr 1303/2013 niniejszy projekt nie należy do żadnej z kategorii projektów generujących dochód. W ramach działań przygotowawczych w 2016 r. opracowano audyty energetyczne, a w II kw. 2017 r. studium wykonalności. Roboty budowlane oraz usługi nadzoru budowlanego i działań promocyjnych zaplanowano na 2018 r. Zgodność projektu z RPO WŚ 2014-2020 została opisana w punkcie poniżej. (Polish)
    0 references
    The project envisages actions concerning comprehensive energy modernisation of 3 public buildings: Municipal Office (UG), Primary School in Łosień (SP in Łosień), Department of Municipal Services (ZUK) with a total area of 2334.8 m² buildings, which will be carried out in accordance with the results of energy audits, in the scope of, among others: warming of the facility, replacement of windows, external doors, reconstruction of heating systems (including the exchange of heat source – liquidation of heating furnaces with coal, replacement of fuel with biomass), installation of RES in energy-conditioning buildings. The investment will reduce CO2 emissions and other air pollutants and significantly increase energy savings – a value for the project of 81 %. The total eligible cost of the project is PLN 1951297.24. gross and includes VAT. The project covered by this feasibility study does not constitute State aid and does not belong to large projects within the meaning of Article 100 of Regulation No 1303/2013. On the basis of the financial analysis and taking into account all the conditions set out in Article 61 of Regulation No 1303/2013, this project does not fall within any category of revenue-generating projects. As part of the preparatory actions in 2016, energy audits were developed and in the second quarter. 2017 feasibility study. Construction works and supervision services and promotional activities are planned for 2018. The compatibility of the project with ROP WW 2014-2020 is described in the section below. (English)
    21 October 2020
    0 references
    Le projet comporte des actions de modernisation énergétique globale de 3 bâtiments publics: Bureau municipal (UG), école primaire de Łosien (SP in Łosien), département des services municipaux (ZUK), avec une superficie totale d’utilisation des bâtiments 2 334,8 m², qui sera effectuée conformément aux résultats des audits énergétiques, dans le cadre, entre autres, de: isolation de l’installation, remplacement des fenêtres, portes extérieures, reconstruction des systèmes de chauffage (y compris le remplacement de la source de chaleur — enlèvement des fours de chauffage au charbon, remplacement du combustible par la biomasse), installation de SER dans des bâtiments à modification énergétique. L’investissement contribuera à réduire les émissions de CO2 et d’autres polluants atmosphériques et à augmenter considérablement les économies d’énergie — 81 % pour le projet. Le coût total éligible du projet est de 1951297,24 PLN brut et comprend la TVA. Le projet couvert par cette étude de faisabilité ne constitue pas une aide d’État et n’est pas un grand projet au sens de l’article 100 du règlement (UE) no 1303/2013. Sur la base de l’analyse financière et compte tenu de toutes les conditions énoncées à l’article 61 du règlement no 1303/2013, ce projet ne relève d’aucune des catégories de projets générateurs de recettes. Dans le cadre de l’action préparatoire, des audits énergétiques ont été réalisés en 2016 et au deuxième trimestre. Étude de faisabilité 2017. Les travaux de construction et les services de supervision et de promotion de la construction sont prévus pour 2018. La conformité du projet avec le ROP WŚ 2014-2020 est décrite dans la section ci-dessous. (French)
    2 December 2021
    0 references
    Das Projekt umfasst Maßnahmen zur umfassenden Energiemodernisierung von drei öffentlichen Gebäuden: Gemeindeamt (UG), Grundschule in Łosien (SP in Łosien), Department of Municipal Services (ZUK). mit einer Gesamtfläche der Nutzung von Gebäuden 2 334,8 m², die gemäß den Ergebnissen der Energieaudits durchgeführt werden, im Rahmen unter anderem: Isolierung der Anlage, Austausch von Fenstern, Außentüren, Rekonstruktion von Heizsystemen (einschließlich Austausch von Wärmequellen – Entfernung von Kohleheizöfen, Austausch von Brennstoffen durch Biomasse), Installation von RES in energiemodifizierten Gebäuden. Die Investition wird dazu beitragen, die CO2-Emissionen und andere Luftschadstoffe zu reduzieren und die Energieeinsparungen deutlich zu erhöhen – 81 % für das Projekt. Die förderfähigen Gesamtkosten des Projekts belaufen sich auf 1951297.24 PLN brutto und beinhalten die Mehrwertsteuer. Das von dieser Machbarkeitsstudie erfasste Projekt stellt keine staatliche Beihilfe dar und ist kein Großprojekt im Sinne von Artikel 100 der Verordnung (EU) Nr. 1303/2013. Auf der Grundlage der Finanzanalyse und unter Berücksichtigung aller in Art. 61 der Verordnung Nr. 1303/2013 genannten Bedingungen fällt dieses Projekt nicht unter eine der Kategorien von einnahmenschaffenden Projekten. Im Rahmen der vorbereitenden Maßnahme wurden im Jahr 2016 und im zweiten Quartal Energieaudits entwickelt. Machbarkeitsstudie 2017. Bauarbeiten und Dienstleistungen der Bauaufsicht und Werbemaßnahmen sind für 2018 geplant. Die Einhaltung des Projekts mit dem ROP WŚ 2014-2020 ist im folgenden Abschnitt beschrieben. (German)
    8 December 2021
    0 references
    Het project omvat acties voor de algehele modernisering van de energie van 3 openbare gebouwen: Gemeentelijk bureau (UG), Primaire School in Łosien (SP in Łosien), afdeling gemeentelijke diensten (ZUK), met een totale oppervlakte van 2 334,8 m², die zal worden uitgevoerd in overeenstemming met de resultaten van energie-audits, in het kader van onder meer: isolatie van de installatie, vervanging van ramen, buitendeuren, wederopbouw van verwarmingssystemen (met inbegrip van vervanging van warmtebron — verwijdering van kolenverwarmingsovens, vervanging van brandstof door biomassa), installatie van RES in energiegemodificeerde gebouwen. De investering zal bijdragen tot de vermindering van de CO2-uitstoot en andere luchtverontreinigende stoffen en tot een aanzienlijke verhoging van de energiebesparingen — 81 % voor het project. De totale subsidiabele kosten van het project bedragen 1951297,24 PLN bruto en inclusief btw. Het project waarop deze haalbaarheidsstudie betrekking heeft, vormt geen staatssteun en is geen groot project in de zin van artikel 100 van Verordening (EU) nr. 1303/2013. Op basis van de financiële analyse en rekening houdend met alle voorwaarden van artikel 61 van Verordening (EU) nr. 1303/2013 valt dit project niet onder een van de categorieën inkomstengenererende projecten. In het kader van de voorbereidende actie werden energieaudits ontwikkeld in 2016 en Q2. Haalbaarheidsstudie 2017 Bouwwerkzaamheden en diensten op het gebied van toezicht op de bouw en promotieactiviteiten staan gepland voor 2018. Naleving van het project met het ROP WŚ 2014-2020 wordt beschreven in het onderstaande deel. (Dutch)
    17 December 2021
    0 references
    Il progetto prevede azioni di modernizzazione energetica globale di 3 edifici pubblici: Ufficio municipale (UG), scuola primaria di Łosien (SP in Łosien), dipartimento dei servizi municipali (ZUK). con una superficie totale di utilizzo di edifici 2 334,8 m², che sarà effettuata conformemente ai risultati degli audit energetici, nell'ambito di applicazione, tra l'altro, a: isolamento dell'impianto, sostituzione di finestre, porte esterne, ricostruzione di impianti di riscaldamento (compresa la sostituzione di fonti di calore — rimozione di forni per il riscaldamento a carbone, sostituzione del combustibile con biomassa), installazione di fonti di energia rinnovabili in edifici modificati dall'energia. L'investimento contribuirà a ridurre le emissioni di CO2 e altri inquinanti atmosferici e ad aumentare notevolmente il risparmio energetico — 81 % per il progetto. Il costo totale ammissibile del progetto è pari a 1951297,24 PLN lordo e include l'IVA. Il progetto oggetto del presente studio di fattibilità non costituisce un aiuto di Stato e non costituisce un grande progetto ai sensi dell'articolo 100 del regolamento (UE) n. 1303/2013. Sulla base dell'analisi finanziaria e tenendo conto di tutte le condizioni di cui all'articolo 61 del regolamento n. 1303/2013, questo progetto non rientra in nessuna delle categorie di progetti generatori di entrate. Nell'ambito dell'azione preparatoria, gli audit energetici sono stati sviluppati nel 2016 e nel secondo trimestre. Studio di fattibilità del 2017. I lavori di costruzione e i servizi di supervisione e promozione dell'edilizia sono previsti per il 2018. Il rispetto del progetto con il POR WŚ 2014-2020 è descritto nella sezione seguente. (Italian)
    15 January 2022
    0 references

    Identifiers

    RPSW.06.01.00-26-0009/16
    0 references