Construction of the Racibórz-Pszczyna Regional Road on the section running through Rybnik City – stage I (Q124480): Difference between revisions

From EU Knowledge Graph
Jump to navigation Jump to search
(‎Changed label, description and/or aliases in nl, and other parts: Adding Dutch translations)
(‎Changed label, description and/or aliases in it, and other parts: Adding Italian translations)
label / itlabel / it
 
Costruzione della strada regionale Racibórz-Pszczyna sul tratto che attraversa la città di Rybnik — fase I
Property / summary
 
Oggetto del progetto è la costruzione della prima fase della strada con una sezione di 2x2, che costituirà una nuova traccia della strada provinciale n. 935 sul tratto che attraversa la città di Rybnik e forma la sua tangenziale sud. A causa della necessità di integrare la strada pianificata nel sistema stradale esistente, una piccola parte della strada (circa 425 m) sarà situata nella città di Żory. La fase I comprende un tratto dalla rotatoria Raciborski sulla cosiddetta tangenziale di Żor settentrionale fino all'incrocio con la via Wodzisławska (DK 78) a Rybnik, per un totale di 10,221 km. Come parte dell'investimento, saranno costruiti 5 nodi senza collisioni, comunicando la nuova arteria con il sistema stradale esistente e 13 strutture di ponte in caso di collisione con strade, binari ferroviari e fiumi. L'obiettivo principale del progetto è consentire un accesso rapido e sicuro all'autostrada A1 nell'ambito del corridoio TEN-T. (Italian)
Property / summary: Oggetto del progetto è la costruzione della prima fase della strada con una sezione di 2x2, che costituirà una nuova traccia della strada provinciale n. 935 sul tratto che attraversa la città di Rybnik e forma la sua tangenziale sud. A causa della necessità di integrare la strada pianificata nel sistema stradale esistente, una piccola parte della strada (circa 425 m) sarà situata nella città di Żory. La fase I comprende un tratto dalla rotatoria Raciborski sulla cosiddetta tangenziale di Żor settentrionale fino all'incrocio con la via Wodzisławska (DK 78) a Rybnik, per un totale di 10,221 km. Come parte dell'investimento, saranno costruiti 5 nodi senza collisioni, comunicando la nuova arteria con il sistema stradale esistente e 13 strutture di ponte in caso di collisione con strade, binari ferroviari e fiumi. L'obiettivo principale del progetto è consentire un accesso rapido e sicuro all'autostrada A1 nell'ambito del corridoio TEN-T. (Italian) / rank
 
Normal rank
Property / summary: Oggetto del progetto è la costruzione della prima fase della strada con una sezione di 2x2, che costituirà una nuova traccia della strada provinciale n. 935 sul tratto che attraversa la città di Rybnik e forma la sua tangenziale sud. A causa della necessità di integrare la strada pianificata nel sistema stradale esistente, una piccola parte della strada (circa 425 m) sarà situata nella città di Żory. La fase I comprende un tratto dalla rotatoria Raciborski sulla cosiddetta tangenziale di Żor settentrionale fino all'incrocio con la via Wodzisławska (DK 78) a Rybnik, per un totale di 10,221 km. Come parte dell'investimento, saranno costruiti 5 nodi senza collisioni, comunicando la nuova arteria con il sistema stradale esistente e 13 strutture di ponte in caso di collisione con strade, binari ferroviari e fiumi. L'obiettivo principale del progetto è consentire un accesso rapido e sicuro all'autostrada A1 nell'ambito del corridoio TEN-T. (Italian) / qualifier
 
point in time: 15 January 2022
Timestamp+2022-01-15T00:00:00Z
Timezone+00:00
CalendarGregorian
Precision1 day
Before0
After0

Revision as of 13:44, 15 January 2022

Project Q124480 in Poland
Language Label Description Also known as
English
Construction of the Racibórz-Pszczyna Regional Road on the section running through Rybnik City – stage I
Project Q124480 in Poland

    Statements

    0 references
    289,989,933.34 zloty
    0 references
    69,597,584.00 Euro
    13 January 2020
    0 references
    389,666,666.67 zloty
    0 references
    93,520,000.0 Euro
    13 January 2020
    0 references
    74.42 percent
    0 references
    4 January 2016
    0 references
    30 June 2020
    0 references
    RYBNIK - MIASTO NA PRAWACH POWIATU
    0 references
    0 references

    50°6'38.2"N, 18°33'11.5"E
    0 references
    Przedmiotem projektu jest budowa I etapu drogi o przekroju 2x2, która będzie stanowiła nowy ślad drogi wojewódzkiej nr 935 na odcinku przebiegającym przez Miasto Rybnik i tworzyła jego południową obwodnicę. Z uwagi na konieczność włączenia planowanej drogi do istniejącego układu drogowego niewielki fragment drogi (ok.425 m) będzie zlokalizowany na terenie Miasta Żory. Etap I obejmuje odcinek od ronda Raciborskiego na tzw. północnej obwodnicy Żor do skrzyżowania z ul.Wodzisławską (DK 78) w Rybniku - w sumie 10,221 km. W ramach inwestycji zostanie wybudowanych 5 bezkolizyjnych węzłów, komunikujących nową arterię z dotychczasowym układem drogowym oraz 13 obiektów mostowych na kolizjach z drogami, torami kolejowymi i rzekami. Podstawowym celem projektu jest umożliwienie szybkiego i bezpiecznego dojazdu do autostrady A1 będącej częścią korytarza sieci TEN-T. (Polish)
    0 references
    The subject of the project is the construction of the first stage of the 2x2 road, which will constitute a new footprint of Voivodeship Road No. 935 on the section running through Rybnik City and forming its southern bypass. Due to the need to incorporate the planned road into the existing road system, a small section of the road (approximately 425 m) will be located in Żory City. Stage I includes a section from the Raciborski roundabout on the so-called northern ring road Żor to the junction with Wodzisławska Street (DK 78) in Rybnik – a total of 10.221 km. As part of the investment, 5 collision-free junctions will be built, communicating a new artery with the existing road system and 13 bridges on collisions with roads, railway tracks and rivers. The primary objective of the project is to enable fast and secure access to the A1 motorway, which is part of the TEN-T corridor. (English)
    21 October 2020
    0 references
    L’objet du projet est la construction de la première étape de la route avec une section de 2x2, qui constituera une nouvelle trace de la route provinciale no 935 sur le tronçon traversant la ville de Rybnik et formant son contournement sud. En raison de la nécessité d’incorporer la route prévue dans le réseau routier existant, une petite partie de la route (environ 425 m) sera située dans la ville de 'ory. La première étape comprend une section du rond-point de Raciborski sur la route périphérique dite nord-ouest jusqu’à l’intersection avec la rue Wodzisławska (DK 78) à Rybnik — un total de 10,221 km. Dans le cadre de l’investissement, 5 nœuds exempts de collision seront construits, communiquant la nouvelle artère avec le réseau routier existant et 13 ouvrages de pont lors de collisions avec des routes, des voies ferrées et des rivières. L’objectif premier du projet est de permettre un accès rapide et sûr à l’autoroute A1 dans le cadre du corridor RTE-T. (French)
    2 December 2021
    0 references
    Gegenstand des Projekts ist der Bau der ersten Etappe der Straße mit einem Querschnitt von 2x2, der eine neue Spur der Provinzstraße Nr. 935 auf dem durch die Stadt Rybnik verlaufenden Abschnitt bilden wird und die südliche Umgehungsstraße bildet. Aufgrund der Notwendigkeit, die geplante Straße in das bestehende Straßensystem zu integrieren, wird ein kleiner Teil der Straße (ca. 425 m) in der Stadt Żory liegen. Etappe I umfasst einen Abschnitt vom Kreisverkehr Raciborski auf der sogenannten nördlichen Żor Ringstraße bis zur Kreuzung mit der Wodzisławska Straße (DK 78) in Rybnik – insgesamt 10,221 km. Im Rahmen der Investition werden 5 kollisionsfreie Knoten gebaut, die die neue Arterie mit dem bestehenden Straßensystem und 13 Brückenstrukturen bei Zusammenstößen mit Straßen, Bahnschienen und Flüssen kommunizieren. Hauptziel des Projekts ist es, im Rahmen des TEN-V-Korridors einen schnellen und sicheren Zugang zur Autobahn A1 zu ermöglichen. (German)
    8 December 2021
    0 references
    Het doel van het project is de aanleg van de eerste etappe van de weg met een dwarsdoorsnede van 2x2, die een nieuw spoor zal vormen van provinciale weg nr. 935 op het traject dat door de stad Rybnik loopt en de zuidelijke rondweg vormt. Vanwege de noodzaak om de geplande weg in het bestaande wegennet op te nemen, zal een klein deel van de weg (ca. 425 m) in de stad Șory worden gelegen. Etappe I omvat een deel van de rotonde Raciborski op de zogenaamde noordelijke ringweg naar de kruising met Wodzisławska Street (DK 78) in Rybnik — een totaal van 10,221 km. Als onderdeel van de investering zullen 5 botsingsvrije knooppunten worden gebouwd, waarbij de nieuwe slagader wordt gecommuniceerd met het bestaande wegensysteem en 13 brugstructuren bij botsingen met wegen, spoorwegen en rivieren. De belangrijkste doelstelling van het project is snelle en veilige toegang tot de snelweg A1 als onderdeel van de TEN-T-corridor. (Dutch)
    17 December 2021
    0 references
    Oggetto del progetto è la costruzione della prima fase della strada con una sezione di 2x2, che costituirà una nuova traccia della strada provinciale n. 935 sul tratto che attraversa la città di Rybnik e forma la sua tangenziale sud. A causa della necessità di integrare la strada pianificata nel sistema stradale esistente, una piccola parte della strada (circa 425 m) sarà situata nella città di Żory. La fase I comprende un tratto dalla rotatoria Raciborski sulla cosiddetta tangenziale di Żor settentrionale fino all'incrocio con la via Wodzisławska (DK 78) a Rybnik, per un totale di 10,221 km. Come parte dell'investimento, saranno costruiti 5 nodi senza collisioni, comunicando la nuova arteria con il sistema stradale esistente e 13 strutture di ponte in caso di collisione con strade, binari ferroviari e fiumi. L'obiettivo principale del progetto è consentire un accesso rapido e sicuro all'autostrada A1 nell'ambito del corridoio TEN-T. (Italian)
    15 January 2022
    0 references

    Identifiers

    RPSL.06.01.00-24-01HF/16
    0 references