Photovoltaic installation for REG FORM Company with limited liability limited partnership (Q118602): Difference between revisions

From EU Knowledge Graph
Jump to navigation Jump to search
(‎Changed label, description and/or aliases in nl, and other parts: Adding Dutch translations)
(‎Changed label, description and/or aliases in it, and other parts: Adding Italian translations)
label / itlabel / it
 
Impianto fotovoltaico per REG FORM Sp. z o.o.
Property / summary
 
L'obiettivo principale del progetto è l'avvio da parte del richiedente della produzione di energia elettrica per autoconsumo utilizzando FER. A seguito dell'installazione, l'investitore sarà in grado di produrre la propria energia elettrica, che risponderà in parte alle esigenze di buon funzionamento dell'azienda, garantirà la sicurezza energetica dell'azienda e avrà un impatto positivo sull'ambiente riducendo le emissioni di sostanze nocive. Il progetto consisterà nell'installazione di un impianto fotovoltaico sul terreno appartenente al Richiedente a Mielec, ul. Inwestor 5. Per l'azienda è stato progettato un impianto fotovoltaico composto da 524 moduli fotovoltaici su una superficie di 878,6 m² con una capacità totale di almeno 151,96 kWp, ossia 0,15 MWe. L'investimento sarà completato entro la fine del 2020. L'investitore del progetto, REG FORM Sp. z o.o Sp. k., ha selezionato l'appaltatore dell'investimento, che si svolgerà in tre fasi: Fase I — realizzazione del progetto di costruzione, fase II — costruzione di un impianto fotovoltaico e acquisizione dei necessari documenti amministrativi, fase III — supervisione degli investitori dell'intero progetto (attività svolte in parallelo alle fasi I e II). Portata del progetto: — moduli policristallini con una potenza unitaria di 290 W — 524 pz. — strutture di supporto 152 kpl, — inverter 30 kW — 5 pz, — quadri CC — 5 pz, — quadri CA — 5 pz, — installazione a terra — 5 pz, — cablaggio CC — 1880 mb, — cablaggio CA, compreso il passaggio del cavo dall'impianto fotovoltaico alla connessione nella stazione trafo — 1 kpl, — sistema di monitoraggio della produzione — 1 pz., — esecuzione di collegamenti cablaggio tra pannelli, inverter e connessioni, — installazione di strutture di supporto e pannelli fotovoltaici Collegamento: collegamento esistente nella stazione trafo situata sul terreno di EWID. 3191 ad una distanza di ca. 0,07 km da terra impianto fotovoltaico. (Italian)
Property / summary: L'obiettivo principale del progetto è l'avvio da parte del richiedente della produzione di energia elettrica per autoconsumo utilizzando FER. A seguito dell'installazione, l'investitore sarà in grado di produrre la propria energia elettrica, che risponderà in parte alle esigenze di buon funzionamento dell'azienda, garantirà la sicurezza energetica dell'azienda e avrà un impatto positivo sull'ambiente riducendo le emissioni di sostanze nocive. Il progetto consisterà nell'installazione di un impianto fotovoltaico sul terreno appartenente al Richiedente a Mielec, ul. Inwestor 5. Per l'azienda è stato progettato un impianto fotovoltaico composto da 524 moduli fotovoltaici su una superficie di 878,6 m² con una capacità totale di almeno 151,96 kWp, ossia 0,15 MWe. L'investimento sarà completato entro la fine del 2020. L'investitore del progetto, REG FORM Sp. z o.o Sp. k., ha selezionato l'appaltatore dell'investimento, che si svolgerà in tre fasi: Fase I — realizzazione del progetto di costruzione, fase II — costruzione di un impianto fotovoltaico e acquisizione dei necessari documenti amministrativi, fase III — supervisione degli investitori dell'intero progetto (attività svolte in parallelo alle fasi I e II). Portata del progetto: — moduli policristallini con una potenza unitaria di 290 W — 524 pz. — strutture di supporto 152 kpl, — inverter 30 kW — 5 pz, — quadri CC — 5 pz, — quadri CA — 5 pz, — installazione a terra — 5 pz, — cablaggio CC — 1880 mb, — cablaggio CA, compreso il passaggio del cavo dall'impianto fotovoltaico alla connessione nella stazione trafo — 1 kpl, — sistema di monitoraggio della produzione — 1 pz., — esecuzione di collegamenti cablaggio tra pannelli, inverter e connessioni, — installazione di strutture di supporto e pannelli fotovoltaici Collegamento: collegamento esistente nella stazione trafo situata sul terreno di EWID. 3191 ad una distanza di ca. 0,07 km da terra impianto fotovoltaico. (Italian) / rank
 
Normal rank
Property / summary: L'obiettivo principale del progetto è l'avvio da parte del richiedente della produzione di energia elettrica per autoconsumo utilizzando FER. A seguito dell'installazione, l'investitore sarà in grado di produrre la propria energia elettrica, che risponderà in parte alle esigenze di buon funzionamento dell'azienda, garantirà la sicurezza energetica dell'azienda e avrà un impatto positivo sull'ambiente riducendo le emissioni di sostanze nocive. Il progetto consisterà nell'installazione di un impianto fotovoltaico sul terreno appartenente al Richiedente a Mielec, ul. Inwestor 5. Per l'azienda è stato progettato un impianto fotovoltaico composto da 524 moduli fotovoltaici su una superficie di 878,6 m² con una capacità totale di almeno 151,96 kWp, ossia 0,15 MWe. L'investimento sarà completato entro la fine del 2020. L'investitore del progetto, REG FORM Sp. z o.o Sp. k., ha selezionato l'appaltatore dell'investimento, che si svolgerà in tre fasi: Fase I — realizzazione del progetto di costruzione, fase II — costruzione di un impianto fotovoltaico e acquisizione dei necessari documenti amministrativi, fase III — supervisione degli investitori dell'intero progetto (attività svolte in parallelo alle fasi I e II). Portata del progetto: — moduli policristallini con una potenza unitaria di 290 W — 524 pz. — strutture di supporto 152 kpl, — inverter 30 kW — 5 pz, — quadri CC — 5 pz, — quadri CA — 5 pz, — installazione a terra — 5 pz, — cablaggio CC — 1880 mb, — cablaggio CA, compreso il passaggio del cavo dall'impianto fotovoltaico alla connessione nella stazione trafo — 1 kpl, — sistema di monitoraggio della produzione — 1 pz., — esecuzione di collegamenti cablaggio tra pannelli, inverter e connessioni, — installazione di strutture di supporto e pannelli fotovoltaici Collegamento: collegamento esistente nella stazione trafo situata sul terreno di EWID. 3191 ad una distanza di ca. 0,07 km da terra impianto fotovoltaico. (Italian) / qualifier
 
point in time: 15 January 2022
Timestamp+2022-01-15T00:00:00Z
Timezone+00:00
CalendarGregorian
Precision1 day
Before0
After0

Revision as of 11:45, 15 January 2022

Project Q118602 in Poland
Language Label Description Also known as
English
Photovoltaic installation for REG FORM Company with limited liability limited partnership
Project Q118602 in Poland

    Statements

    0 references
    509,575.0 zloty
    0 references
    122,298.0 Euro
    13 January 2020
    0 references
    599,500.0 zloty
    0 references
    143,880.0 Euro
    13 January 2020
    0 references
    85.0 percent
    0 references
    1 September 2017
    0 references
    31 December 2020
    0 references
    REG FORM SPÓŁKA Z OGRANICZONĄ ODPOWIEDZIALNOŚCIĄ SP. K.
    0 references
    0 references
    Głównym celem projektu jest rozpoczęcie przez Wnioskodawcę produkcji energii elektrycznej na potrzeby własne z wykorzystaniem OZE. W wyniku montażu instalacji Inwestor będzie w stanie wyprodukować na potrzeby własne energię elektryczną, która częściowo zaspokoi potrzeby Przedsiębiorstwa do prawidłowego funkcjonowania, zapewni bezpieczeństwo energetyczne przedsiębiorstwa oraz wpłynie pozytywnie na środowisko naturalne poprzez ograniczenie emisji substancji szkodliwych. Przedsięwzięcie polegać będzie na instalacji systemu fotowoltaicznego na gruncie należącym do Wnioskodawcy w Mielcu przy ulicy Inwestorów 5. Dla potrzeb Przedsiębiorstwa zaprojektowany został system fotowoltaiczny składający się z 524 modułów PV na powierzchni 878,6 m2 o łącznej mocy min. 151,96 kWp, tj 0,15 MWe. Inwestycja zostanie zrealizowana do końca 2020 r. Inwestor projektu, REG FORM Sp. z o.o Sp. k., wybrał z zachowaniem zasad konkurencyjności wykonawcę inwestycji, która zostanie zrealizowana w trzech etapach: Etap I –wykonanie projektu budowlanego, Etap II – budowa instalacji fotowoltaicznej oraz uzyskanie niezbędnych dokumentów administracyjnych, Etap III – nadzór inwestorski nad całością przedsięwzięcia (działania wykonywane równolegle z etapami I i II). Zakres projektu: - moduły polikrystaliczne o mocy jednostkowej 290W - 524 szt. - konstrukcje wsporcze 152 kpl, - falowniki 30 kW - 5 szt., - rozdzielnice DC - 5 szt., - rozdzielnice AC - 5 szt., - instalacja uziemiająca - 5 szt., - okablowanie DC - 1880 mb, - okablowanie AC, w tym trasa kablowa od systemu PV do przyłącza w stacji trafo - 1 kpl, - system monitoringu produkcji - 1szt., - wykonanie podłączeń okablowania pomiędzy panelami, falownikami i przyłącza, - montaż konstrukcji wsporczych i paneli PV Miejsce przyłączenia: istniejące przyłącze w stacji trafo, znajdującej się na działce ewid. 3191 w odległości ok. 0,07 km od gruntowej instalacji fotowoltaicznej. (Polish)
    0 references
    The main objective of the project is to start production of electricity for own use using RES by the Applicant. As a result of installation, the Investor will be able to produce for its own electricity, which will partially satisfy the Company’s needs to function properly, ensure the company’s energy security and have a positive impact on the environment by reducing emissions of harmful substances. The project will consist of the installation of a photovoltaic system on land belonging to the Applicant in Mielec at ul. Investor 5. For the company’s needs, a photovoltaic system consisting of 524 PV modules on an area of 878.6 m² with a total power of at least 151.96 kWp, i.e. 0.15 MWe, was designed. The investment will be completed by the end of 2020. The Investor of the project, REG FORM Sp. z o.o. Sp. z o.o Sp. k., selected the contractor, which will be carried out in three stages, in accordance with the principles of competitiveness: Stage I – execution of the construction project, Stage II – construction of a photovoltaic installation and obtaining necessary administrative documents, Stage III – investor supervision over the entire project (actions carried out in parallel with stages I and II). Scope of the project: — polycrystalline modules with unit power of 290 W – 524 pcs. — support structures 152 kpl, – inverters 30 kW – 5 pcs, – DC switchgear – 5 pcs, – AC switchgear – 5 pcs., – ground installation – 5 pcs, – DC wiring – 1880 mb, – AC wiring, including cable route from PV system to connection in the trafo station – 1 kpl, – production monitoring system – 1pcs, – execution of connections between wiring and wiring between the trafo station – 1 kpl. there is an existing connection in the trafo station located on the evid’s plot. 3191 at a distance of approx. 0.07 km from the ground photovoltaic installation. (English)
    20 October 2020
    0 references
    L’objectif principal du projet est le démarrage par la requérante de la production d’électricité à des fins d’autoconsommation utilisant des SER. Grâce à l’installation, l’investisseur sera en mesure de produire son propre électricité, qui répondra en partie aux besoins de la Société pour le bon fonctionnement, assurera la sécurité énergétique de l’entreprise et aura un impact positif sur l’environnement en réduisant les émissions de substances nocives. Le projet consistera à installer un système photovoltaïque sur le terrain appartenant à la requérante à Mielec, ul. Inwestor 5. Un système photovoltaïque composé de 524 modules photovoltaïques d’une superficie de 878,6 m² d’une capacité totale d’au moins 151,96 kWp, soit 0,15 MWe, a été conçu pour l’entreprise. L’investissement sera achevé d’ici la fin 2020. L’investisseur du projet, REG FORM Sp. z o.o Sp. k., a sélectionné le contractant de l’investissement, qui se déroulera en trois étapes: Phase I — mise en œuvre du projet de construction, phase II — construction d’une installation photovoltaïque et obtention des documents administratifs nécessaires, phase III — supervision de l’ensemble du projet par les investisseurs (activités menées parallèlement aux phases I et II). Portée du projet: — modules polycristallins avec une puissance unitaire de 290 W — 524 pcs. — structures de soutènement 152 kpl, — onduleurs 30 kW — 5 pcs, — appareillage DC — 5 pcs, — appareillage secteur — 5 pièces, — installation au sol — 5 pièces, — câblage continu — 1880 mb, — câblage secteur, y compris la voie de câble du système PV à la connexion dans la station de trafo — 1 kpl, — système de surveillance de la production — 1 pcs., — exécution des connexions de câblage entre panneaux, onduleurs et connexions, — installation de structures de support et de panneaux PV Connexion: raccordement existant dans la station de trafo située sur le terrain de l’EWID. 3191 à une distance d’env. 0,07 km de l’installation photovoltaïque au sol. (French)
    2 December 2021
    0 references
    Hauptziel des Projekts ist der Beginn der Stromerzeugung durch den Antragsteller für den Eigenverbrauch mit EE. Als Ergebnis der Installation wird der Investor in der Lage sein, seinen eigenen Strom zu produzieren, der teilweise den Bedürfnissen des Unternehmens nach einem ordnungsgemäßen Betrieb gerecht wird, die Energieversorgungssicherheit des Unternehmens gewährleistet und durch die Verringerung der Schadstoffemissionen positive Auswirkungen auf die Umwelt haben wird. Das Projekt besteht in der Installation einer Photovoltaikanlage auf dem Grundstück des Antragstellers in Mielec, ul. Inwestor 5. Für das Unternehmen wurde eine Photovoltaikanlage aus 524 PV-Modulen mit einer Fläche von 878,6 m² mit einer Gesamtleistung von mindestens 151,96 kWp, d. h. 0,15 MWe, entwickelt. Die Investition wird bis Ende 2020 abgeschlossen. Der Investor des Projekts, REG FORM Sp. z o.o Sp. k., hat den Auftragnehmer der Investition ausgewählt, der in drei Phasen durchgeführt wird: Phase I – Durchführung des Bauvorhabens, Phase II – Bau einer Fotovoltaik-Anlage und Erhalt der erforderlichen Verwaltungsdokumente, Stufe III – Anlegeraufsicht über das gesamte Projekt (Maßnahmen, die parallel zu den Phasen I und II durchgeführt werden). Umfang des Projekts: — polykristalline Module mit einer Einheitsleistung von 290 W – 524 Stk. — Stützkonstruktionen 152 kpl, – Wechselrichter 30 kW – 5 Stück, – Gleichstromschaltanlage – 5 Stück, – Wechselstromschaltanlage – 5 Stück, – Bodeninstallation – 5 Stück, – Gleichstromverdrahtung – 1880 mb, – Wechselstromverdrahtung, inklusive Kabelweg von der PV-Anlage an die Verbindung in der trafo Station – 1 kpl, – Produktionsüberwachungssystem – 1 Stk., – Ausführung von Verdrahtungsverbindungen zwischen Paneelen, Wechselrichtern und Anschlüssen, – Montage von Stützstrukturen und PV-Panels Anschluss: bestehende Verbindung im Treffo-Bahnhof auf dem Grundstück von EWID. 3191 in einer Entfernung von ca. 0,07 km von der Photovoltaikanlage entfernt. (German)
    7 December 2021
    0 references
    Het hoofddoel van het project is de start door de aanvrager van de elektriciteitsproductie voor eigen verbruik met behulp van RES. Als gevolg van de installatie zal de investeerder in staat zijn om zijn eigen elektriciteit te produceren, die gedeeltelijk zal voldoen aan de behoeften van de onderneming voor een goede werking, de energiezekerheid van het bedrijf zal waarborgen en een positief effect op het milieu zal hebben door de uitstoot van schadelijke stoffen te verminderen. Het project zal bestaan uit de installatie van een fotovoltaïsch systeem op de grond van verzoekster in Mielec, ul. Inwestor 5. Een fotovoltaïsch systeem bestaande uit 524 PV-modules met een oppervlakte van 878,6 m² met een totale capaciteit van ten minste 151,96 kWp, d.w.z. 0,15 MWe, is ontworpen voor de onderneming. De investering zal eind 2020 voltooid zijn. De investeerder van het project, REG FORM Sp. z o.o Sp. k., heeft de contractant van de investering geselecteerd, die in drie fasen zal worden uitgevoerd: Fase I — uitvoering van het bouwproject, fase II — bouw van een fotovoltaïsche installatie en het verkrijgen van de nodige administratieve documenten, fase III — toezicht van de investeerders op het gehele project (activiteiten die parallel met de fasen I en II worden uitgevoerd). Reikwijdte van het project: polykristallijne modules met een eenheidsvermogen van 290 W — 524 stuks. — draagconstructies 152 kpl, — omvormers 30 kW — 5 stuks, — DC schakelinrichtingen — 5 stuks, — AC schakelinrichtingen — 5 stuks, — grondinstallatie — 5 stuks, — DC bedrading — 1880 mb, — AC bedrading, inclusief kabelroute van het PV-systeem naar de aansluiting in het trafo station — 1 kpl, — productie monitoring systeem — 1 st., — uitvoering van bedrading verbindingen tussen panelen, omvormers en aansluitingen, — installatie van ondersteunende structuren en PV panelen Aansluiting: bestaande aansluiting in het trafostation op het perceel van EWID. 3191 op een afstand van ca. 0,07 km van de grond fotovoltaïsche installatie. (Dutch)
    17 December 2021
    0 references
    L'obiettivo principale del progetto è l'avvio da parte del richiedente della produzione di energia elettrica per autoconsumo utilizzando FER. A seguito dell'installazione, l'investitore sarà in grado di produrre la propria energia elettrica, che risponderà in parte alle esigenze di buon funzionamento dell'azienda, garantirà la sicurezza energetica dell'azienda e avrà un impatto positivo sull'ambiente riducendo le emissioni di sostanze nocive. Il progetto consisterà nell'installazione di un impianto fotovoltaico sul terreno appartenente al Richiedente a Mielec, ul. Inwestor 5. Per l'azienda è stato progettato un impianto fotovoltaico composto da 524 moduli fotovoltaici su una superficie di 878,6 m² con una capacità totale di almeno 151,96 kWp, ossia 0,15 MWe. L'investimento sarà completato entro la fine del 2020. L'investitore del progetto, REG FORM Sp. z o.o Sp. k., ha selezionato l'appaltatore dell'investimento, che si svolgerà in tre fasi: Fase I — realizzazione del progetto di costruzione, fase II — costruzione di un impianto fotovoltaico e acquisizione dei necessari documenti amministrativi, fase III — supervisione degli investitori dell'intero progetto (attività svolte in parallelo alle fasi I e II). Portata del progetto: — moduli policristallini con una potenza unitaria di 290 W — 524 pz. — strutture di supporto 152 kpl, — inverter 30 kW — 5 pz, — quadri CC — 5 pz, — quadri CA — 5 pz, — installazione a terra — 5 pz, — cablaggio CC — 1880 mb, — cablaggio CA, compreso il passaggio del cavo dall'impianto fotovoltaico alla connessione nella stazione trafo — 1 kpl, — sistema di monitoraggio della produzione — 1 pz., — esecuzione di collegamenti cablaggio tra pannelli, inverter e connessioni, — installazione di strutture di supporto e pannelli fotovoltaici Collegamento: collegamento esistente nella stazione trafo situata sul terreno di EWID. 3191 ad una distanza di ca. 0,07 km da terra impianto fotovoltaico. (Italian)
    15 January 2022
    0 references

    Identifiers

    RPPK.03.01.00-18-0513/17
    0 references