Property / summary
 
Il progetto comprende 1 progetto di investimento, realizzato su un edificio esistente. Il progetto si concentrerà sulla profonda modernizzazione energetica dell'edificio della scuola primaria n. 5 a Namysłów. L'ambito del lavoro comprende: ammodernamento dell'installazione interna, riscaldamento del tetto dei locali mansarda incorporati, riscaldamento del soffitto della terrazza, riscaldamento delle pareti esterne del piano terra e l'esecuzione di una parete verde piantando la parete occidentale con viti autoadesive, I pavimenti e soffitta, riscaldamento dei tetti del tetto smerigliato coperto di carta, riscaldamento delle pareti esterne del piano terra sotto la terrazza, riscaldamento del soffitto sopra la soffitta, isolamento delle pareti esterne del seminterrato, esecuzione di un sistema di ventilazione meccanica con recupero di calore, riscaldamento del tetto dei locali mansardati esistenti, sostituzione di finestre esterne in PVC, riscaldamento delle pareti esterne a terra, riscaldamento del pavimento al piano interrato, ammodernamento dell'installazione di acqua calda mediante l'installazione di un set solare aggiuntivo (RES) basato su un riscaldatore bivalente con l'esecuzione di distribuzioni di acqua calda al punto di estrazione, sostituzione delle porte d'ingresso esterne esistenti, sostituzione di sorgenti luminose e apparecchi di illuminazione per il LED ad efficienza energetica. Va sottolineato che tutti i lavori sono il risultato di audit energetici effettuati da persone con le qualifiche richieste (ad es. J. Janeczek, J. Nowak e Andrzej Turowicz). La relazione di audit è stata redatta in data 2017-01-17 ed è allegata alla documentazione di candidatura. L'attuazione del progetto è prevista per circa 6 mesi nel 2018. Il progetto non è un progetto di partenariato. La portata dei lavori previsti è coerente con gli audit energetici e i progetti di costruzione. I prodotti che verranno creati attraverso la realizzazione del progetto sono: 1 edificio modificato da energia, 1 unità costruita per la generazione di calore da fonti rinnovabili, 0,0054 MWt di capacità aggiuntiva per generare calore da fonti rinnovabili, 751 m² di superficie utile per gli edifici sottoposti a Termomoder (Italian)
Property / summary: Il progetto comprende 1 progetto di investimento, realizzato su un edificio esistente. Il progetto si concentrerà sulla profonda modernizzazione energetica dell'edificio della scuola primaria n. 5 a Namysłów. L'ambito del lavoro comprende: ammodernamento dell'installazione interna, riscaldamento del tetto dei locali mansarda incorporati, riscaldamento del soffitto della terrazza, riscaldamento delle pareti esterne del piano terra e l'esecuzione di una parete verde piantando la parete occidentale con viti autoadesive, I pavimenti e soffitta, riscaldamento dei tetti del tetto smerigliato coperto di carta, riscaldamento delle pareti esterne del piano terra sotto la terrazza, riscaldamento del soffitto sopra la soffitta, isolamento delle pareti esterne del seminterrato, esecuzione di un sistema di ventilazione meccanica con recupero di calore, riscaldamento del tetto dei locali mansardati esistenti, sostituzione di finestre esterne in PVC, riscaldamento delle pareti esterne a terra, riscaldamento del pavimento al piano interrato, ammodernamento dell'installazione di acqua calda mediante l'installazione di un set solare aggiuntivo (RES) basato su un riscaldatore bivalente con l'esecuzione di distribuzioni di acqua calda al punto di estrazione, sostituzione delle porte d'ingresso esterne esistenti, sostituzione di sorgenti luminose e apparecchi di illuminazione per il LED ad efficienza energetica. Va sottolineato che tutti i lavori sono il risultato di audit energetici effettuati da persone con le qualifiche richieste (ad es. J. Janeczek, J. Nowak e Andrzej Turowicz). La relazione di audit è stata redatta in data 2017-01-17 ed è allegata alla documentazione di candidatura. L'attuazione del progetto è prevista per circa 6 mesi nel 2018. Il progetto non è un progetto di partenariato. La portata dei lavori previsti è coerente con gli audit energetici e i progetti di costruzione. I prodotti che verranno creati attraverso la realizzazione del progetto sono: 1 edificio modificato da energia, 1 unità costruita per la generazione di calore da fonti rinnovabili, 0,0054 MWt di capacità aggiuntiva per generare calore da fonti rinnovabili, 751 m² di superficie utile per gli edifici sottoposti a Termomoder (Italian) / rank
 
Normal rank
Property / summary: Il progetto comprende 1 progetto di investimento, realizzato su un edificio esistente. Il progetto si concentrerà sulla profonda modernizzazione energetica dell'edificio della scuola primaria n. 5 a Namysłów. L'ambito del lavoro comprende: ammodernamento dell'installazione interna, riscaldamento del tetto dei locali mansarda incorporati, riscaldamento del soffitto della terrazza, riscaldamento delle pareti esterne del piano terra e l'esecuzione di una parete verde piantando la parete occidentale con viti autoadesive, I pavimenti e soffitta, riscaldamento dei tetti del tetto smerigliato coperto di carta, riscaldamento delle pareti esterne del piano terra sotto la terrazza, riscaldamento del soffitto sopra la soffitta, isolamento delle pareti esterne del seminterrato, esecuzione di un sistema di ventilazione meccanica con recupero di calore, riscaldamento del tetto dei locali mansardati esistenti, sostituzione di finestre esterne in PVC, riscaldamento delle pareti esterne a terra, riscaldamento del pavimento al piano interrato, ammodernamento dell'installazione di acqua calda mediante l'installazione di un set solare aggiuntivo (RES) basato su un riscaldatore bivalente con l'esecuzione di distribuzioni di acqua calda al punto di estrazione, sostituzione delle porte d'ingresso esterne esistenti, sostituzione di sorgenti luminose e apparecchi di illuminazione per il LED ad efficienza energetica. Va sottolineato che tutti i lavori sono il risultato di audit energetici effettuati da persone con le qualifiche richieste (ad es. J. Janeczek, J. Nowak e Andrzej Turowicz). La relazione di audit è stata redatta in data 2017-01-17 ed è allegata alla documentazione di candidatura. L'attuazione del progetto è prevista per circa 6 mesi nel 2018. Il progetto non è un progetto di partenariato. La portata dei lavori previsti è coerente con gli audit energetici e i progetti di costruzione. I prodotti che verranno creati attraverso la realizzazione del progetto sono: 1 edificio modificato da energia, 1 unità costruita per la generazione di calore da fonti rinnovabili, 0,0054 MWt di capacità aggiuntiva per generare calore da fonti rinnovabili, 751 m² di superficie utile per gli edifici sottoposti a Termomoder (Italian) / qualifier
 
point in time: 15 January 2022
Timestamp+2022-01-15T00:00:00Z
Timezone+00:00
CalendarGregorian
Precision1 day
Before0
After0

Revision as of 11:05, 15 January 2022

Project Q114879 in Poland
Language Label Description Also known as
English
Thermomodernisation of Primary School No. 5 in Namysłów
Project Q114879 in Poland

    Statements

    0 references
    499,840.11 zloty
    0 references
    119,961.63 Euro
    13 January 2020
    0 references
    612,266.19 zloty
    0 references
    146,943.89 Euro
    13 January 2020
    0 references
    81.64 percent
    0 references
    4 May 2018
    0 references
    30 November 2018
    0 references
    GMINA NAMYSŁÓW
    0 references
    Projekt obejmuje 1 zadanie inwestycyjne, realizowane na istniejącym budynku. Przedmiotem projektu będzie głęboka modernizacja energetyczna budynku Szkoły Podstawowej Nr5 w Namysłowie. Zakres prac obejmuje: modernizację instalacji wewnętrznej c.o., docieplenie dachu dobudowanych pomieszczeń poddasza, docieplenie stropu tarasu, docieplenie ścian zewnętrznych parteru i wykonanie zielonej ściany poprzez obsadzenie ściany zachodniej pnączami samoczepnymi, I piętra i poddasza, docieplenie dachów lukarn krytych papą, docieplenie ścian zewnętrznych parteru pod tarasem, docieplenie stropu nad poddaszem, docieplenie ścian zewnętrznych piwnicy, wykonanie instalacji wentylacji nawiewno-wywiewnej mechanicznej z odzyskiem ciepła, docieplenie dachu istniejących pomieszczeń poddasza, wymiana okien zewnętrznych PCV, docieplenie ścian zewnętrznych przy gruncie, docieplenie podłogi na gruncie piwnicy, modernizacja instalacji c.w.u. poprzez zamontowanie dodatkowego zestawu solarnego(OZE) w oparciu o podgrzewacz biwalentny z wykonaniem rozprowadzeń c.w.u. do pkt poboru, wymiana istniejących drzwi zewnętrznych wejściowych, wymiana źródeł światła i opraw oświetleniowych na energooszczędne-LED. Należy podkreślić, że wszystkie prace wynikają z audytów energetycznych sporządzonych przez osoby posiadające wymagane kwalifikacje (tj. Panowie J. Janeczek, J. Nowak i Andrzej Turowicz). Raport z przeprowadzonego audytu został sporządzony w dn.2017-01-17 i stanowi załącznik do dokumentacji aplikacyjnej. Realizacja projektu planowana jest na ok.6 miesięcy w 2018r. Projekt nie jest przedsięwzięciem partnerskim. Zakres planowanych prac jest spójny z audytami energetycznymi oraz projektem budowlanym. Produkty, jakie powstaną dzięki realizacji projektu to:1 zmodernizowany energetycznie budynek, 1 wybudowana jednostka wytwarzania energii cieplnej z OZE, 0,0054 MWt dodatkowej zdolności wytwarzania energii cieplnej ze źródeł odnawialnych, 751m2 powierzchni użytkowej budynków poddanych termomoder (Polish)
    0 references
    The project comprises 1 investment tasks, carried out on an existing building. The subject of the project will be a deep energy modernisation of the building of the Primary School No.5 in Namysłów. The scope of work shall include: retrofitting the interior installation c.o., warming the roof of the built attic, warming the ceiling of the terrace, warming the outer walls of the ground floor and making the green wall by planting the western wall with self-catering, I floor and attic, warming the roofs of the interior of the interior of the interior of the interior of the interior of the interior walls of the interior of the interior interior of the floor under the terrace, warming of the ceiling above the ceiling, the incineration of the interior interior walls of the interior interior. It should be emphasised that all the work results from energy audits prepared by persons with the required qualifications (i.e. Mr J. Janeczek, J. Nowak and Andrzej Turowicz). The audit report was prepared on 2017-01-17 and is attached to the application documentation. The project is planned for about 6 months in 2018. The project is not a partnership venture. The scope of the planned works is consistent with energy audits and construction project. The products that will be created by the project are:1 energy-conditioned building, 1 built unit of thermal energy from RES, 0.0054 MWt additional capacity to generate heat from renewable sources, 751 m² of usable space of buildings subjected to thermomoder (English)
    20 October 2020
    0 references
    Le projet comprend un projet d’investissement, réalisé sur un bâtiment existant. Le projet sera axé sur la modernisation énergétique profonde du bâtiment de l’école primaire no 5 à Namysłów. La portée des travaux comprend: modernisation de l’installation interne, réchauffement du toit des chambres greniers encastrés, réchauffement du plafond de la terrasse, réchauffement des murs extérieurs du rez-de-chaussée et exécution d’un mur vert en plantant le mur ouest avec des vignes autocollantes, I planchers et grenier, réchauffement des toits du toit givré recouvert de papier, réchauffement des murs extérieurs du rez-de-chaussée sous la terrasse, réchauffement du plafond au-dessus du grenier, isolation des parois extérieures du sous-sol, exécution d’un système de ventilation mécanique avec récupération de chaleur, réchauffement du toit des locaux greniers existants, remplacement des fenêtres extérieures en PVC, réchauffement des murs extérieurs au sol, réchauffement du plancher au sous-sol, modernisation de l’installation d’eau chaude par l’installation d’un ensemble solaire supplémentaire (RES) basé sur un chauffage bivalent avec l’exécution de distributions d’eau chaude au point de captage, remplacement des portes d’entrée extérieures existantes, remplacement des sources lumineuses et appareils d’éclairage pour l’efficacité énergétique-LED. Il convient de souligner que tous les travaux sont le résultat d’audits énergétiques réalisés par des personnes possédant les qualifications requises (p. ex. M. J. Janeczek, M. J. Nowak et M. Andrzej Turowicz). Le rapport d’audit a été établi le 2017-01-17 et est annexé à la documentation relative à la demande. La mise en œuvre du projet est prévue pour environ 6 mois en 2018. Le projet n’est pas un projet de partenariat. La portée des travaux prévus est compatible avec les audits énergétiques et le projet de construction. Les produits qui seront créés dans le cadre de la mise en œuvre du projet sont: 1 bâtiment modifié en énergie, 1 unité construite pour produire de la chaleur à partir de sources d’énergie renouvelables, 0,0054 MWt de capacité supplémentaire pour produire de la chaleur à partir de sources renouvelables, 751 m² de surface utile pour les bâtiments soumis à Termomoder (French)
    1 December 2021
    0 references
    Das Projekt umfasst 1 Investitionsprojekt, das an einem bestehenden Gebäude durchgeführt wird. Das Projekt wird sich auf die tiefgreifende Energiemodernisierung des Gebäudes der Grundschule Nr. 5 in Namysłów konzentrieren. Der Umfang der Arbeiten umfasst: Modernisierung der internen Installation, Erwärmung des Dachdachs der eingebauten Dachgeschossräume, Erwärmung der Terrassendecke, Erwärmung der Außenwände des Erdgeschosses und Ausführung einer grünen Wand durch Bepflanzung der Westwand mit selbstklebenden Reben, I Böden und Dachboden, Erwärmung der Dächer des mit Papier bedeckten Frostdachs, Erwärmung der Außenwände des Erdgeschosses unter der Terrasse, Erwärmung der Decke über dem Dachboden, Isolierung der Außenwände des Kellers, Ausführung eines mechanischen Lüftungssystems mit Wärmerückgewinnung, Erwärmung des Dachdaches bestehender Dachräume, Austausch von PVC-Außenfenstern, Erwärmung der Außenwände am Boden, Erwärmung des Bodens auf dem Keller, Modernisierung der Warmwasserinstallation durch Installation eines zusätzlichen Solar-Sets (RES) basierend auf einem zweiwertigen Heizgerät mit der Ausführung von Warmwasserverteilungen an den Abstraktionspunkt, Ersatz bestehender Außentüren, Austausch von Lichtquellen und Beleuchtungseinrichtungen für energieeffiziente LED. Es sei darauf hingewiesen, dass alle Arbeiten das Ergebnis von Energieaudits sind, die von Personen mit den erforderlichen Qualifikationen (d. h. J. Janeczek, J. Nowak und Andrzej Turowicz). Der Prüfbericht wurde am 1.1.2017 erstellt und ist der Antragsunterlagen als Anlage beigefügt. Die Durchführung des Projekts ist für etwa 6 Monate im Jahr 2018 geplant. Das Projekt ist kein Partnerschaftsprojekt. Der Umfang der geplanten Arbeiten steht im Einklang mit Energieaudits und Bauvorhaben. Die Produkte, die durch die Durchführung des Projekts entstehen werden, sind: 1 energiemodifiziertes Gebäude, 1 gebaute Einheit zur Erzeugung von Wärme aus erneuerbaren Energiequellen, 0,0054 MWt zusätzlicher Kapazität zur Erzeugung von Wärme aus erneuerbaren Quellen, 751 m² Nutzfläche für Gebäude, die Termomoder unterliegen (German)
    7 December 2021
    0 references
    Het project omvat één investeringsproject, uitgevoerd op een bestaand gebouw. Het project zal gericht zijn op de grondige modernisering van de energiesector van de basisschool nr. 5 in Namysłów. Het toepassingsgebied van de werkzaamheden omvat: modernisering van de interne installatie, opwarming van het dak van de ingebouwde zolderkamers, opwarming van het terrasplafond, opwarming van de buitenmuren van de begane grond en uitvoering van een groene muur door het planten van de westelijke muur met zelfklevende wijnstokken, I-vloeren en zolder, het verwarmen van de daken van het berijpte dak bedekt met papier, het verwarmen van de buitenmuren van de begane grond onder het terras; opwarming van het plafond boven de zolder, isolatie van de buitenmuren van de kelder, uitvoering van een mechanisch ventilatiesysteem met warmteterugwinning, opwarming van het dak van bestaande zolderkamers, vervanging van PVC-uitwendige ramen, opwarming van de buitenmuren op de grond, opwarming van de vloer op de kelder, modernisering van de warmwaterinstallatie door de installatie van een extra zonne-energieset (RES) op basis van een bivalente verwarming met de uitvoering van distributies van warm water naar het onttrekkingspunt, vervanging van bestaande externe ingangsdeuren, vervanging van lichtbronnen en verlichtingsarmaturen voor energiezuinig-LED. Er zij op gewezen dat alle werkzaamheden het resultaat zijn van energieaudits die worden uitgevoerd door personen met de vereiste kwalificaties (d.w.z. De heren J. Janeczek, J. Nowak en Andrzej Turowicz). Het auditverslag is opgesteld op 2017-01-17 en is bij de aanvraagdocumentatie gevoegd. De uitvoering van het project is gepland voor ongeveer 6 maanden in 2018. Het project is geen partnerschapsproject. De reikwijdte van de geplande werkzaamheden is consistent met energieaudits en bouwprojecten. De producten die door de uitvoering van het project zullen worden gecreëerd zijn: 1 energiegemodificeerd gebouw, 1 gebouwde eenheid voor het opwekken van warmte uit hernieuwbare energiebronnen, 0,0054 MWt extra capaciteit om warmte op te wekken uit hernieuwbare bronnen, 751 m² bruikbare vloeroppervlakte voor gebouwen die aan Termomoder zijn onderworpen (Dutch)
    17 December 2021
    0 references
    Il progetto comprende 1 progetto di investimento, realizzato su un edificio esistente. Il progetto si concentrerà sulla profonda modernizzazione energetica dell'edificio della scuola primaria n. 5 a Namysłów. L'ambito del lavoro comprende: ammodernamento dell'installazione interna, riscaldamento del tetto dei locali mansarda incorporati, riscaldamento del soffitto della terrazza, riscaldamento delle pareti esterne del piano terra e l'esecuzione di una parete verde piantando la parete occidentale con viti autoadesive, I pavimenti e soffitta, riscaldamento dei tetti del tetto smerigliato coperto di carta, riscaldamento delle pareti esterne del piano terra sotto la terrazza, riscaldamento del soffitto sopra la soffitta, isolamento delle pareti esterne del seminterrato, esecuzione di un sistema di ventilazione meccanica con recupero di calore, riscaldamento del tetto dei locali mansardati esistenti, sostituzione di finestre esterne in PVC, riscaldamento delle pareti esterne a terra, riscaldamento del pavimento al piano interrato, ammodernamento dell'installazione di acqua calda mediante l'installazione di un set solare aggiuntivo (RES) basato su un riscaldatore bivalente con l'esecuzione di distribuzioni di acqua calda al punto di estrazione, sostituzione delle porte d'ingresso esterne esistenti, sostituzione di sorgenti luminose e apparecchi di illuminazione per il LED ad efficienza energetica. Va sottolineato che tutti i lavori sono il risultato di audit energetici effettuati da persone con le qualifiche richieste (ad es. J. Janeczek, J. Nowak e Andrzej Turowicz). La relazione di audit è stata redatta in data 2017-01-17 ed è allegata alla documentazione di candidatura. L'attuazione del progetto è prevista per circa 6 mesi nel 2018. Il progetto non è un progetto di partenariato. La portata dei lavori previsti è coerente con gli audit energetici e i progetti di costruzione. I prodotti che verranno creati attraverso la realizzazione del progetto sono: 1 edificio modificato da energia, 1 unità costruita per la generazione di calore da fonti rinnovabili, 0,0054 MWt di capacità aggiuntiva per generare calore da fonti rinnovabili, 751 m² di superficie utile per gli edifici sottoposti a Termomoder (Italian)
    15 January 2022
    0 references

    Identifiers

    RPOP.03.02.01-16-0024/17