Thermal Modernisation of Kindergarten in Buków Śląskia. (Q114866): Difference between revisions
Jump to navigation
Jump to search
(Changed label, description and/or aliases in nl, and other parts: Adding Dutch translations) |
(Changed label, description and/or aliases in it, and other parts: Adding Italian translations) |
||||||||||||||
label / it | label / it | ||||||||||||||
Termomodernizzazione dell'asilo a Buków Śląskia. | |||||||||||||||
Property / summary | |||||||||||||||
Il progetto prevede la realizzazione di lavori finalizzati alla profonda termomodernizzazione di un impianto di pubblica utilità di natura educativa, ossia la sede dell'asilo a Buków Śląskia. L'investimento previsto comprende l'ammodernamento dell'impianto CO e la sostituzione della caldaia con una caldaia ad alta efficienza con combustibili rinnovabili (pellet), l'ammodernamento dell'impianto di acqua calda, l'installazione di pannelli fotovoltaici, il riscaldamento di divisori orizzontali e verticali e la sostituzione di serramenti e porte, nonché la creazione di una parete verde nell'edificio vivaio. L'attuazione del progetto ridurrà in modo significativo le emissioni di inquinanti (principalmente CO2) e ridurrà in modo significativo i costi sostenuti per il riscaldamento dell'impianto. L'approccio tecnologico utilizzato nel progetto è stato adottato sulla base di un audit energetico sviluppato. Va sottolineato che il progetto svolge l'intera portata del lavoro risultante dall'audit, ma allo stesso tempo non prevede altri compiti non raccomandati dall'audit energetico (ad eccezione delle spese per le attività di promozione). Il progetto è inoltre in linea con il Piano di Economia a basse emissioni territorialmente rilevante adottato dal Consiglio del Comune di Pensare. 2016-10-27. L'attuazione del progetto è prevista per ca. 9 mesi nel 2019 (attuazione in natura dal 2019-04-01 al 2019-11-30, fine finanziaria 2019-12-31). L'inizio dell'attuazione dei materiali sarà preceduto dalla selezione del contraente per i lavori di costruzione e assemblaggio. La ricorrente chiede una sovvenzione per un importo di 499 800,00 PLN, che rappresenta l'85,00 % dei costi ammissibili. I prodotti del progetto saranno 1 edificio a trasformazione energetica, con un'area utilizzabile (soggetto a termomodernizzazione) di 594 m², 2 unità di generazione di calore da fonti rinnovabili costruite e 1 fonte di calore sarà modernizzata. (Italian) | |||||||||||||||
Property / summary: Il progetto prevede la realizzazione di lavori finalizzati alla profonda termomodernizzazione di un impianto di pubblica utilità di natura educativa, ossia la sede dell'asilo a Buków Śląskia. L'investimento previsto comprende l'ammodernamento dell'impianto CO e la sostituzione della caldaia con una caldaia ad alta efficienza con combustibili rinnovabili (pellet), l'ammodernamento dell'impianto di acqua calda, l'installazione di pannelli fotovoltaici, il riscaldamento di divisori orizzontali e verticali e la sostituzione di serramenti e porte, nonché la creazione di una parete verde nell'edificio vivaio. L'attuazione del progetto ridurrà in modo significativo le emissioni di inquinanti (principalmente CO2) e ridurrà in modo significativo i costi sostenuti per il riscaldamento dell'impianto. L'approccio tecnologico utilizzato nel progetto è stato adottato sulla base di un audit energetico sviluppato. Va sottolineato che il progetto svolge l'intera portata del lavoro risultante dall'audit, ma allo stesso tempo non prevede altri compiti non raccomandati dall'audit energetico (ad eccezione delle spese per le attività di promozione). Il progetto è inoltre in linea con il Piano di Economia a basse emissioni territorialmente rilevante adottato dal Consiglio del Comune di Pensare. 2016-10-27. L'attuazione del progetto è prevista per ca. 9 mesi nel 2019 (attuazione in natura dal 2019-04-01 al 2019-11-30, fine finanziaria 2019-12-31). L'inizio dell'attuazione dei materiali sarà preceduto dalla selezione del contraente per i lavori di costruzione e assemblaggio. La ricorrente chiede una sovvenzione per un importo di 499 800,00 PLN, che rappresenta l'85,00 % dei costi ammissibili. I prodotti del progetto saranno 1 edificio a trasformazione energetica, con un'area utilizzabile (soggetto a termomodernizzazione) di 594 m², 2 unità di generazione di calore da fonti rinnovabili costruite e 1 fonte di calore sarà modernizzata. (Italian) / rank | |||||||||||||||
Normal rank | |||||||||||||||
Property / summary: Il progetto prevede la realizzazione di lavori finalizzati alla profonda termomodernizzazione di un impianto di pubblica utilità di natura educativa, ossia la sede dell'asilo a Buków Śląskia. L'investimento previsto comprende l'ammodernamento dell'impianto CO e la sostituzione della caldaia con una caldaia ad alta efficienza con combustibili rinnovabili (pellet), l'ammodernamento dell'impianto di acqua calda, l'installazione di pannelli fotovoltaici, il riscaldamento di divisori orizzontali e verticali e la sostituzione di serramenti e porte, nonché la creazione di una parete verde nell'edificio vivaio. L'attuazione del progetto ridurrà in modo significativo le emissioni di inquinanti (principalmente CO2) e ridurrà in modo significativo i costi sostenuti per il riscaldamento dell'impianto. L'approccio tecnologico utilizzato nel progetto è stato adottato sulla base di un audit energetico sviluppato. Va sottolineato che il progetto svolge l'intera portata del lavoro risultante dall'audit, ma allo stesso tempo non prevede altri compiti non raccomandati dall'audit energetico (ad eccezione delle spese per le attività di promozione). Il progetto è inoltre in linea con il Piano di Economia a basse emissioni territorialmente rilevante adottato dal Consiglio del Comune di Pensare. 2016-10-27. L'attuazione del progetto è prevista per ca. 9 mesi nel 2019 (attuazione in natura dal 2019-04-01 al 2019-11-30, fine finanziaria 2019-12-31). L'inizio dell'attuazione dei materiali sarà preceduto dalla selezione del contraente per i lavori di costruzione e assemblaggio. La ricorrente chiede una sovvenzione per un importo di 499 800,00 PLN, che rappresenta l'85,00 % dei costi ammissibili. I prodotti del progetto saranno 1 edificio a trasformazione energetica, con un'area utilizzabile (soggetto a termomodernizzazione) di 594 m², 2 unità di generazione di calore da fonti rinnovabili costruite e 1 fonte di calore sarà modernizzata. (Italian) / qualifier | |||||||||||||||
point in time: 15 January 2022
|
Revision as of 11:05, 15 January 2022
Project Q114866 in Poland
Language | Label | Description | Also known as |
---|---|---|---|
English | Thermal Modernisation of Kindergarten in Buków Śląskia. |
Project Q114866 in Poland |
Statements
499,800.0 zloty
0 references
588,000.0 zloty
0 references
85.0 percent
0 references
1 April 2019
0 references
31 December 2019
0 references
GMINA NAMYSŁÓW
0 references
Projekt obejmuje przeprowadzenie prac ukierunkowanych na głęboką termomodernizacje obiektu użyteczności publicznej o charakterze edukacyjnym, tj. siedziby Przedszkola w Bukowie Śląskiej. Planowana inwestycja obejmuje modernizację instalacji CO wraz z wymianą kotła na wysokosprawny kocioł wykorzystujący paliwa odnawialne (pellet), modernizację instalacji c.w.u., wraz z instalacją paneli fotowoltaicznych, docieplenie przegród poziomych i pionowych wraz z wymianą stolarki okiennej i drzwiowej, a także planowane jest utworzenie zielonej ściany w budynku przedszkola. Realizacja projektu przyczyni się do znacznego ograniczenia emisji zanieczyszczeń (głównie CO2) oraz istotnego ograniczenia kosztów ponoszonych na ogrzewanie obiektu. Podejście technologiczne zastosowane w projekcie zostało przyjęte na bazie opracowanego audytu energetycznego. Należy podkreślić, że projekt realizuje cały zakres prac wynikający z opracowanego audytu, a jednocześnie nie przewiduje realizacji żadnych innych zadań nie zalecanych przez audyt energetyczny (wyjątkiem są wydatki na działania promocyjne). Projekt jest także zgodny z właściwym terytorialnie Planem Gospodarki Niskoemisyjnej, przyjętym przez Radę Gminy Namysłów w dn. 2016-10-27. Realizacja projektu planowana jest na ok. 9 miesięcy w 2019 r. (realizacja rzeczowa od 2019-04-01 do 2019-11-30, zakończenie finansowe 2019-12-31). Rozpoczęcie rzeczowej realizacji zostanie poprzedzone przeprowadzeniem wyboru wykonawcy prac budowlano-montażowych. Wnioskodawca ubiega się o dofinansowanie w kwocie 499 800,00 zł, co stanowi 85,00% kosztów kwalifikowanych. Produktami projektu będzie zmodernizowany energetycznie 1 budynek, o powierzchnia użytkowej (poddanej termomodernizacji) 594 m2, wybudowane 2 jednostki wytwarzania energii cieplnej z OZE, oraz zmodernizowane zostanie 1 źródeł ciepła. (Polish)
0 references
The project involves carrying out works aimed at deep thermomodernisation of the public utility facility of an educational nature, i.e. the seat of the kindergarten in Buków Śląski. The planned investment includes the modernisation of the CO system with the replacement of the boiler with a high-efficiency boiler using renewable fuels (pellet), the modernisation of the central heating system, the installation of photovoltaic panels, warming of horizontal and vertical partitions together with the replacement of window and door joinery, as well as the creation of a green wall in the kindergarten building. The implementation of the project will significantly reduce pollutant emissions (mainly CO2) and significantly reduce the costs of heating the plant. The technological approach used in the project was adopted on the basis of the developed energy audit. It should be emphasised that the project carries out the whole range of work resulting from the audit, while at the same time it does not provide for any other tasks not recommended by the energy audit (except for expenditure on promotional activities). The project is also in line with the territorially competent Low-Emission Economy Plan, adopted by the Municipal Council of Namysłów on the day. IT’S A 2016-10-27. Implementation of the project is planned for approx. 9 months in 2019 (in kind implementation from 2019-04-01 to 2019-11-30, financial termination 2019-12-31). The commencement of the actual implementation will be preceded by the selection of the contractor for construction and assembly works. The applicant applies for funding in the amount of PLN 499 800.00, which is 85.00 % of eligible costs. The project’s products will be modernised energy 1 building, with a usable area of 594 m² (thermomodernised) of 594 m², built 2 units of heat generation from RES, and 1 heat sources will be modernised. (English)
20 October 2020
0 references
Le projet consiste à réaliser des travaux visant à la thermomodernisation profonde d’une installation d’utilité publique à caractère éducatif, c’est-à-dire le siège de la maternelle à Buków Śląskia. L’investissement prévu comprend la modernisation de l’installation de CO ainsi que le remplacement de la chaudière par une chaudière à haut rendement utilisant des combustibles renouvelables (pellet), la modernisation de l’installation d’eau chaude, l’installation de panneaux photovoltaïques, le réchauffement des cloisons horizontales et verticales ainsi que le remplacement de la menuiserie des fenêtres et des portes, ainsi que la création d’un mur vert dans le bâtiment de la pépinière. La mise en œuvre du projet permettra de réduire considérablement les émissions de polluants (principalement le CO2) et les coûts de chauffage de l’installation. L’approche technologique utilisée dans le projet a été adoptée sur la base d’un audit énergétique développé. Il convient de souligner que le projet exécute l’ensemble des travaux résultant de l’audit, mais qu’il ne prévoit en même temps aucune autre tâche non recommandée par l’audit énergétique (à l’exception des dépenses relatives aux activités de promotion). Le projet est également conforme au plan territorial d’économie à faibles émissions adopté par le Conseil de la municipalité de réflexion. 2016-10-27. La mise en œuvre du projet est prévue pour environ. 9 mois en 2019 (mise en œuvre en nature de 2019-04-01 à 2019-11-30, fin 2019-12-31). Le début de la mise en œuvre des matériaux sera précédé de la sélection du contractant pour les travaux de construction et d’assemblage. Le demandeur demande une subvention d’un montant de 499 800,00 PLN, ce qui représente 85,00 % des coûts éligibles. Les produits du projet seront un bâtiment modifié en énergie, avec une surface utilisable (sous réserve de thermomodernisation) de 594 m², 2 unités de production de chaleur à partir de SER construites, et une source de chaleur modernisée. (French)
1 December 2021
0 references
Das Projekt umfasst die Durchführung von Arbeiten zur tiefen Thermomodernisierung einer öffentlichen Versorgungsanlage pädagogischer Natur, d. h. des Sitzes des Kindergartens in Buków Śląskia. Die geplante Investition umfasst die Modernisierung der CO-Anlage zusammen mit dem Austausch des Kessels durch einen hocheffizienten Kessel mit erneuerbaren Brennstoffen (Pelle), die Modernisierung der Warmwasseranlage sowie die Installation von Photovoltaik-Panels, die Erwärmung von horizontalen und vertikalen Trennwänden sowie den Austausch von Fenster- und Türtischwerken sowie die Schaffung einer grünen Wand im Kindergartengebäude. Durch die Durchführung des Projekts werden die Emissionen von Schadstoffen (hauptsächlich CO2) deutlich reduziert und die Kosten für die Beheizung der Anlage erheblich gesenkt. Der technologische Ansatz des Projekts wurde auf der Grundlage eines entwickelten Energieaudits verfolgt. Es sei darauf hingewiesen, dass das Projekt den gesamten Tätigkeitsbereich der Prüfung durchführt, aber gleichzeitig keine anderen Aufgaben vorsieht, die vom Energieaudit nicht empfohlen werden (mit Ausnahme der Ausgaben für Absatzförderungsmaßnahmen). Das Projekt steht auch im Einklang mit dem territorial relevanten Plan für emissionsarme Wirtschaft, der vom Rat der Gemeinde Thinks angenommen wurde. 2016-10-27. Die Durchführung des Projekts ist für ca. 9 Monate im Jahr 2019 (in Sachumsetzung von 2019-04-01 bis 2019-11-30, Finanzende 2019-12-31). Dem Beginn der Materialausführung geht die Auswahl des Auftragnehmers für die Bau- und Montagearbeiten voraus. Der Antragsteller beantragt einen Zuschuss in Höhe von 499 800,00 PLN, was 85,00 % der förderfähigen Kosten entspricht. Die Produkte des Projekts werden ein energiemodifiziertes 1 Gebäude sein, mit einer nutzbaren Fläche (vorbehaltlich der Thermomodernisierung) von 594 m², 2 Einheiten der Wärmeerzeugung aus erneuerbaren Energiequellen und 1 Wärmequelle modernisiert. (German)
7 December 2021
0 references
Het project omvat de uitvoering van werken die gericht zijn op een grondige thermomodernisering van een openbare nutsvoorziening van educatieve aard, d.w.z. het hoofdkantoor van de kleuterschool in Buków Śląskia. De geplande investering omvat de modernisering van de CO-installatie samen met de vervanging van de ketel door een hoogrenderende ketel die gebruik maakt van hernieuwbare brandstoffen (pellet), modernisering van de warmwaterinstallatie, samen met de installatie van fotovoltaïsche panelen, het verwarmen van horizontale en verticale scheidingswanden samen met de vervanging van raam- en deurschrijnwerk, alsmede het creëren van een groene muur in het kwekerijgebouw. De uitvoering van het project zal de uitstoot van verontreinigende stoffen (voornamelijk CO2) aanzienlijk verminderen en de kosten voor het verwarmen van de installatie aanzienlijk verminderen. De in het project gebruikte technologische aanpak werd gekozen op basis van een ontwikkelde energieaudit. Er zij op gewezen dat het project het volledige werkterrein van de audit uitvoert, maar tegelijkertijd niet voorziet in andere taken die niet door de energieaudit worden aanbevolen (met uitzondering van uitgaven voor afzetbevorderingsactiviteiten). Het project is ook in overeenstemming met het territoriaal relevante plan voor een emissiearme economie dat is goedgekeurd door de Raad van de Gemeente van Denken over. 2016-10-27. De uitvoering van het project is gepland voor ca. 9 maanden in 2019 (uitvoering in natura vanaf 2019-04-01 tot 2019-11-30, financieel einde 2019-12-31). De aanvang van de materiaaluitvoering wordt voorafgegaan door de selectie van de aannemer voor de bouw- en montagewerkzaamheden. De aanvrager vraagt een subsidie van 499 800,00 PLN aan, wat neerkomt op 85,00 % van de subsidiabele kosten. De producten van het project zijn een energiegemodificeerd 1 gebouw, met een bruikbare oppervlakte (onder voorbehoud van thermomodernisering) van 594 m², 2 eenheden warmteopwekking uit RES gebouwd, en 1 warmtebron zal worden gemoderniseerd. (Dutch)
17 December 2021
0 references
Il progetto prevede la realizzazione di lavori finalizzati alla profonda termomodernizzazione di un impianto di pubblica utilità di natura educativa, ossia la sede dell'asilo a Buków Śląskia. L'investimento previsto comprende l'ammodernamento dell'impianto CO e la sostituzione della caldaia con una caldaia ad alta efficienza con combustibili rinnovabili (pellet), l'ammodernamento dell'impianto di acqua calda, l'installazione di pannelli fotovoltaici, il riscaldamento di divisori orizzontali e verticali e la sostituzione di serramenti e porte, nonché la creazione di una parete verde nell'edificio vivaio. L'attuazione del progetto ridurrà in modo significativo le emissioni di inquinanti (principalmente CO2) e ridurrà in modo significativo i costi sostenuti per il riscaldamento dell'impianto. L'approccio tecnologico utilizzato nel progetto è stato adottato sulla base di un audit energetico sviluppato. Va sottolineato che il progetto svolge l'intera portata del lavoro risultante dall'audit, ma allo stesso tempo non prevede altri compiti non raccomandati dall'audit energetico (ad eccezione delle spese per le attività di promozione). Il progetto è inoltre in linea con il Piano di Economia a basse emissioni territorialmente rilevante adottato dal Consiglio del Comune di Pensare. 2016-10-27. L'attuazione del progetto è prevista per ca. 9 mesi nel 2019 (attuazione in natura dal 2019-04-01 al 2019-11-30, fine finanziaria 2019-12-31). L'inizio dell'attuazione dei materiali sarà preceduto dalla selezione del contraente per i lavori di costruzione e assemblaggio. La ricorrente chiede una sovvenzione per un importo di 499 800,00 PLN, che rappresenta l'85,00 % dei costi ammissibili. I prodotti del progetto saranno 1 edificio a trasformazione energetica, con un'area utilizzabile (soggetto a termomodernizzazione) di 594 m², 2 unità di generazione di calore da fonti rinnovabili costruite e 1 fonte di calore sarà modernizzata. (Italian)
15 January 2022
0 references
Identifiers
RPOP.03.02.01-16-0009/18
0 references