label / itlabel / it
 
Termomodernizzazione di 5 edifici pubblici situati nel comune di Gościradów
Property / summary
 
L'obiettivo principale dell'investimento previsto è migliorare l'efficienza energetica degli edifici pubblici che rimangono nelle risorse del comune di Gościradów.L'obiettivo previsto sarà raggiunto mediante una completa termomodernizzazione di cinque impianti di pubblica utilità situati nella Duchessa, Liśnik Dużym, Gościeradów Ukazowy, SALOMIN, Wólce Szczecka.Il gruppo destinatario dell'investimento è i residenti del comune di Gościradów.L'ambito dell'investimento obejmuje:Termomodernizację del magazzino e dell'edilizia sociale, 2 edifici del centro sanitario, dell'edificio SENIOR+ e del People's House Building,Elaboration of Energy Audits and Feasibility Study, Investor Supervision,Project Management,Promotion of the Project.Saranno installati anche i seguenti edifici: 2 caldaie a biomassa, 1 pompa aria-acqua e 5 impianti di fototensione con una capacità da 1,50 a 5,00 kWp situati sui tetti degli edifici. Nell'ambito del costo del non cavo, verranno eseguiti lavori per non migliorare l'effetto. energet. oggetti e la parte dei lavori corrispondente alla parte residenziale dell'edificio nel Duchosmeter, Large Linger e Salomin. L'effetto sarà aumentato. energet. dell'edificio del 75, 65 %.Nel quadro dell'investimento, saranno raggiunti i seguenti valori in termini di rezultatu:Dodatk energia elettrificata da fonti energetiche rinnovabili[0.0149MWe];Capacità supplementare per l'energia termica da fonti rinnovabili[MWt],Capacità supplementare per l'energia da fonti rinnovabili (CI30)[0,0750 MW];Quantità di risparmio di energia termica.[2409,85GJ/anno];Quantità di elettrificazione energetica.[24,13 MWh/anno];Prod. elect. da nuova costruzione. Usa l'Inst. RES[14,3040MWhe/anno];Produttore di energia elettrificata da capacità di nuova costruzione/nuova generazione utilizzata. RES[14,3040MWhe/anno];Produrre energia termica. con installazione di nuova costruzione. uso. RES[113,89MWht/anno]; La produzione di energia termica da nuova costruzione/nuova potenza di uscita dell'impianto utilizza. RES[113,89MWht/anno];Riduzione annua stimata delle emissioni di gas di calore.(CI34)[200,18 t CO2/anno];Ridurre il consumo annuo di energia primaria in publ.(CI32)[2 496,71 kWh/anno]. (Italian)
Property / summary: L'obiettivo principale dell'investimento previsto è migliorare l'efficienza energetica degli edifici pubblici che rimangono nelle risorse del comune di Gościradów.L'obiettivo previsto sarà raggiunto mediante una completa termomodernizzazione di cinque impianti di pubblica utilità situati nella Duchessa, Liśnik Dużym, Gościeradów Ukazowy, SALOMIN, Wólce Szczecka.Il gruppo destinatario dell'investimento è i residenti del comune di Gościradów.L'ambito dell'investimento obejmuje:Termomodernizację del magazzino e dell'edilizia sociale, 2 edifici del centro sanitario, dell'edificio SENIOR+ e del People's House Building,Elaboration of Energy Audits and Feasibility Study, Investor Supervision,Project Management,Promotion of the Project.Saranno installati anche i seguenti edifici: 2 caldaie a biomassa, 1 pompa aria-acqua e 5 impianti di fototensione con una capacità da 1,50 a 5,00 kWp situati sui tetti degli edifici. Nell'ambito del costo del non cavo, verranno eseguiti lavori per non migliorare l'effetto. energet. oggetti e la parte dei lavori corrispondente alla parte residenziale dell'edificio nel Duchosmeter, Large Linger e Salomin. L'effetto sarà aumentato. energet. dell'edificio del 75, 65 %.Nel quadro dell'investimento, saranno raggiunti i seguenti valori in termini di rezultatu:Dodatk energia elettrificata da fonti energetiche rinnovabili[0.0149MWe];Capacità supplementare per l'energia termica da fonti rinnovabili[MWt],Capacità supplementare per l'energia da fonti rinnovabili (CI30)[0,0750 MW];Quantità di risparmio di energia termica.[2409,85GJ/anno];Quantità di elettrificazione energetica.[24,13 MWh/anno];Prod. elect. da nuova costruzione. Usa l'Inst. RES[14,3040MWhe/anno];Produttore di energia elettrificata da capacità di nuova costruzione/nuova generazione utilizzata. RES[14,3040MWhe/anno];Produrre energia termica. con installazione di nuova costruzione. uso. RES[113,89MWht/anno]; La produzione di energia termica da nuova costruzione/nuova potenza di uscita dell'impianto utilizza. RES[113,89MWht/anno];Riduzione annua stimata delle emissioni di gas di calore.(CI34)[200,18 t CO2/anno];Ridurre il consumo annuo di energia primaria in publ.(CI32)[2 496,71 kWh/anno]. (Italian) / rank
 
Normal rank
Property / summary: L'obiettivo principale dell'investimento previsto è migliorare l'efficienza energetica degli edifici pubblici che rimangono nelle risorse del comune di Gościradów.L'obiettivo previsto sarà raggiunto mediante una completa termomodernizzazione di cinque impianti di pubblica utilità situati nella Duchessa, Liśnik Dużym, Gościeradów Ukazowy, SALOMIN, Wólce Szczecka.Il gruppo destinatario dell'investimento è i residenti del comune di Gościradów.L'ambito dell'investimento obejmuje:Termomodernizację del magazzino e dell'edilizia sociale, 2 edifici del centro sanitario, dell'edificio SENIOR+ e del People's House Building,Elaboration of Energy Audits and Feasibility Study, Investor Supervision,Project Management,Promotion of the Project.Saranno installati anche i seguenti edifici: 2 caldaie a biomassa, 1 pompa aria-acqua e 5 impianti di fototensione con una capacità da 1,50 a 5,00 kWp situati sui tetti degli edifici. Nell'ambito del costo del non cavo, verranno eseguiti lavori per non migliorare l'effetto. energet. oggetti e la parte dei lavori corrispondente alla parte residenziale dell'edificio nel Duchosmeter, Large Linger e Salomin. L'effetto sarà aumentato. energet. dell'edificio del 75, 65 %.Nel quadro dell'investimento, saranno raggiunti i seguenti valori in termini di rezultatu:Dodatk energia elettrificata da fonti energetiche rinnovabili[0.0149MWe];Capacità supplementare per l'energia termica da fonti rinnovabili[MWt],Capacità supplementare per l'energia da fonti rinnovabili (CI30)[0,0750 MW];Quantità di risparmio di energia termica.[2409,85GJ/anno];Quantità di elettrificazione energetica.[24,13 MWh/anno];Prod. elect. da nuova costruzione. Usa l'Inst. RES[14,3040MWhe/anno];Produttore di energia elettrificata da capacità di nuova costruzione/nuova generazione utilizzata. RES[14,3040MWhe/anno];Produrre energia termica. con installazione di nuova costruzione. uso. RES[113,89MWht/anno]; La produzione di energia termica da nuova costruzione/nuova potenza di uscita dell'impianto utilizza. RES[113,89MWht/anno];Riduzione annua stimata delle emissioni di gas di calore.(CI34)[200,18 t CO2/anno];Ridurre il consumo annuo di energia primaria in publ.(CI32)[2 496,71 kWh/anno]. (Italian) / qualifier
 
point in time: 15 January 2022
Timestamp+2022-01-15T00:00:00Z
Timezone+00:00
CalendarGregorian
Precision1 day
Before0
After0

Revision as of 09:30, 15 January 2022

Project Q105362 in Poland
Language Label Description Also known as
English
Thermal modernisation of 5 public buildings located in the Municipality of Guests
Project Q105362 in Poland

    Statements

    0 references
    1,317,680.75 zloty
    0 references
    316,243.38 Euro
    13 January 2020
    0 references
    1,550,212.66 zloty
    0 references
    372,051.04 Euro
    13 January 2020
    0 references
    85.0 percent
    0 references
    7 January 2019
    0 references
    30 November 2021
    0 references
    GMINA GOŚCIERADÓW
    0 references
    Celem głównym planowanej inwestycji jest poprawa efektywności energetycznej w budynkach użyteczności publicznej pozostających w zasobach Gminy Gościeradów.Planowany cel zostanie osiągnięty dzięki przeprowadzeniu kompleksowej termomodernizacji pięciu obiektów użyteczności publicznej zlokalizowanych w Księżomierzy,Liśniku Dużym,Gościeradowie Ukazowym,Salominie,Wólce Szczeckiej.Grupą docelową inwestycji są mieszkańcy gminy Gościeradów.Zakres inwestycji obejmuje:Termomodernizację budynku magazynowo-socjalnego,2 budynków Ośrodka Zdrowia,budynku SENIOR+ oraz budynku Domu Ludowego,Opracowanie Audytów energetycznych oraz Studium wykonalności,Nadzór inwestorski,Zarządzanie projektem,Promocja projektu.Zainstalowane zostaną także: 2 kotły na biomasę, 1 pompa powietrze-woda oraz 5 instalacji fotowolt. o mocach od 1,50 do 5,00 kWp umiejscowionych na dachach budynków.W ramach kosztów niekwal. wykonane zostaną prace nie mające wpływu na poprawę efekt. energet. obiektów oraz część prac przypadająca na część mieszkalną budynku w Księżomierzy,Liśniku Dużym i Salominie.W ramach inwestycji osiągnięte zostanie zwiększ. efekt. energet. budynku o 75,65%.W ramach inwestycji osiągnięte zostaną następujące wartości wskaźników rezultatu:Dodatk. zdol. wytw. energii elekt. ze źródeł odn.[0,0149MWe];Dodatk. zdol. wytw. energii ciepl. ze źródeł odn.[MWt],Dodat. zdol. wytw. energii ze źródeł odn.(CI30)[0,0750MW];Ilość zaoszcz. energii ciepl.[2409,85GJ/rok];Ilość zaoszcz. energii elekt.[24,13MWh/rok];Prod. energii elekt. z nowo wybudow. Inst. wykorzyst. OZE[14,3040MWhe/rok];Prod. energii elekt. z nowo wybudowanych/nowych mocy wytwórczych inst. wykorzyst. OZE[14,3040MWhe/rok];Prod. energii ciepl. z nowo wybud. instal. wykorzyst. OZE[113,89MWht/rok]; Prod. energii ciepl. z nowo wybudowanych/nowych mocy wytw. instal. wykorzyst. OZE[113,89MWht/rok];Szac. roczny spadek emisji gazów ciepl.(CI34)[200,18t.r. CO2/rok];Zmniejsz. rocznego zużycia energii pierwotnej w bud. publ.(CI32)[2496,71kWh/rok]. (Polish)
    0 references
    The main objective of the planned investment is to improve energy efficiency in public buildings remaining in the resources of the Guests’ commune.The planned goal will be achieved by carrying out a comprehensive thermomodernisation of five public utility facilities located in the Duchy,Liśnik Big, Visitor Visitors, Salomin,Wólce Szczecka.The project aims to target residents of the Municipality of Guests. The energy efficiency of the building will be increased by 75.13 % of energy sources[24.13 % of energy sources[24.13 % of energy sources][24.13 % of energy[24.13 % of energy in 24.13 % of energy.[30th energy efficiency in 0750. Inst. take advantage of it. RES[14,3040MWhe/year];Prod. electricity from newly built/new generation capacity inst. use. RES[14,3040MWhe/year];Prod. thermal energy with newly built instal. use. RES[113,89MWht/year]; Prod. heat energy. from newly built/new power generator. use. RES[113,89MWht/year];According to the annual decrease in greenhouse gas emissions (CI34)[200,18 t. CO2/year];Reduce annual primary energy consumption in the publ.(CI32)[2496.71 kWh/year]. (English)
    20 October 2020
    0 references
    L’objectif principal de l’investissement prévu est d’améliorer l’efficacité énergétique des bâtiments publics restant dans les ressources de la municipalité de Gościradów.L’objectif prévu sera atteint par la réalisation d’une thermomodernisation complète de cinq installations d’utilité publique situées dans la duchesse, Liśnik Dużym, Gościeradów Ukazowy, SALOMIN, Wólce Szczecka.Le groupe cible de l’investissement est les résidents de la municipalité de Gościradów.La portée de l’investissement obejmuje:Termomodernizację de l’entrepôt et du bâtiment social, 2 bâtiments du centre de santé, du bâtiment SENIOR+ et du bâtiment de la maison du peuple,Élaboration d’audits énergétiques et étude de faisabilité,supervision des investisseurs,gestion du projet,promotion du projet. 2 chaudières à biomasse, 1 pompe à air-eau et 5 installations photovoltaïques d’une capacité de 1,50 à 5,00 kWp situées sur les toits des bâtiments.Dans le cadre du coût de la non-câble, des travaux seront effectués pour ne pas améliorer l’effet. energet. objets et la partie des travaux correspondant à la partie résidentielle du bâtiment dans le Duchosmeter, Grand Linger et Salomin.Dans le cadre de l’investissement, L’effet sera augmenté. Energet. du bâtiment de 75,65 %.Dans le cadre de l’investissement, les valeurs suivantes seront atteintes en termes de rezultatu:Dodatk énergie électrifiée produite à partir de sources d’énergie renouvelables[0,0149MWe];Capacité supplémentaire pour l’énergie thermique produite à partir de sources renouvelables[MWt],Capacité supplémentaire pour l’énergie produite à partir de sources renouvelables (CI30)[0,0750 MW];Quantité d’économies d’énergie thermique[2409,85GJ/an];Quantité d’électrification énergétique.[24,13 MWh/an];Prod. électr. Utilisez l’Inst. RES[14,3040MWhe/an];Producteur d’énergie électrifiée à partir de la nouvelle capacité de production utilisée. RES[14,3040MWhe/an];Produire de l’énergie thermique. avec installation nouvellement construite. utilisation. RES[113,89MWht/an]; La production d’énergie thermique à partir de la production d’énergie nouvellement construite/nouvelle puissance des utilisations de l’installation. RES[113,89MWht/an];Réduction annuelle estimée des émissions de gaz de chauffage.(CI34)[200,18 t CO2/an];Réduction de la consommation annuelle d’énergie primaire dans le secteur du gaz de chauffage (CI32)[2 496,71 kWh/an]. (French)
    1 December 2021
    0 references
    Das Hauptziel der geplanten Investition ist die Verbesserung der Energieeffizienz in öffentlichen Gebäuden, die in den Ressourcen der Gemeinde Gościradów verbleiben.Das geplante Ziel wird durch die Durchführung einer umfassenden Thermomodernisierung von fünf öffentlichen Versorgungseinrichtungen in der Herzogin, Liśnik Dużym, Gościeradów Ukazowy, SALOMIN, Wólce Szczecka erreicht.Zielgruppe der Investition sind die Bewohner der Gemeinde Gościradów.Der Umfang der Investition obejmuje:Termomodernizację des Lager- und Sozialgebäudes, 2 Gebäude des Gesundheitszentrums, des SENIOR±Gebäudes und des Volkshausgebäudes, Ausarbeitung von Energieaudits und Machbarkeitsstudie,Investor-Überwachung,Projektmanagement,Projektförderung. 2 Biomassekessel, 1 Luft-Wasserpumpe und 5 Photovoltaikanlagen mit einer Leistung von 1,50 bis 5,00 kWp auf den Dächern von Gebäuden.Im Rahmen der Kosten für nicht kabelgebundene Arbeiten werden Arbeiten durchgeführt, um die Wirkung nicht zu verbessern. energet. Objekte und der Teil der Arbeiten, die dem Wohnteil des Gebäudes im Duchosmeter, Large Linger und Salomin entsprechen. der Effekt wird erhöht. energet. des Gebäudes um 75, 65 %.Im Rahmen der Investition werden die folgenden Werte erreicht werden in Bezug auf rezultatu:Dodatk elektrifizierte Energie aus erneuerbaren Energiequellen[0.0149MWe];Zusätzliche Kapazität für thermische Energie aus erneuerbaren Quellen[MWt],Zusätzliche Kapazität für Energie aus erneuerbaren Quellen (CI30)[0,0750 MW];Anzahl der thermischen Energieeinsparungen.[2409,85GJ/Jahr];Quantität der Energieelektrifizierung.[24,13 MWh/Jahr];Prod. Wahl aus Neubau. Benutze die Inst. RES[14.3040MWhe/Jahr]; Erzeuger von elektrifizierter Energie aus neu gebauter/neuer Erzeugungskapazität. RES[14.3040MWhe/Jahr];Erzeugt Wärmeenergie. mit neu gebauter Installation. Verwendung. RES[113,89MWht/Jahr]; Die Erzeugung von thermischer Energie aus neu gebauter/neuer Leistung der Anlage. RES[113,89MWht/Jahr];Schätzter jährlicher Rückgang der Wärmegasemissionen (CI34)[200,18 t CO2/Jahr];Verringern Sie den jährlichen Primärenergieverbrauch in Publ.(CI32)[2 496,71 kWh/Jahr]. (German)
    7 December 2021
    0 references
    De belangrijkste doelstelling van de geplande investering is het verbeteren van de energie-efficiëntie in openbare gebouwen die in de middelen van de gemeente Gościradów blijven.Het beoogde doel zal worden bereikt door een uitgebreide thermomodernisering van vijf openbare nutsvoorzieningen in de hertogin, Liśnik Dużym, Gościeradów Ukazowy, SALOMIN, Wólce Szczecka.De doelgroep van de investering is de inwoners van de gemeente Gościradów.De omvang van de investering obejmuje:Termomodernizację van het warehousing- en sociaal gebouw, 2 gebouwen van het Gezondheidscentrum, het SENIOR±gebouw en het Volkshuisgebouw, Uitwerking van energieaudits en haalbaarheidsstudie, Investor Supervision,Project Management, Promotie van het Project.Het volgende zal ook worden geïnstalleerd: 2 biomassaketels, 1 lucht-waterpomp en 5 fotospanningsinstallaties met een capaciteit van 1,50 tot 5,00 kWp op de daken van gebouwen.Als onderdeel van de kosten van niet-kabel worden werkzaamheden uitgevoerd om het effect niet te verbeteren. energet. objecten en het deel van de werken dat overeenkomt met het woongedeelte van het gebouw in de Duchosmeter, Large Linger en Salomin.Als onderdeel van de investering, het effect zal worden verhoogd. energet. van het gebouw met 75, 65 %.In het kader van de investering zullen de volgende waarden worden bereikt in termen van rezultatu:Dodatk elektrische energie uit hernieuwbare energiebronnen[0,0149MWe];Aanvullende capaciteit voor thermische energie uit hernieuwbare bronnen[MWt],Aanvullende capaciteit voor energie uit hernieuwbare bronnen (CI30)[0,0750 MW];Kwantiteit van thermische energiebesparing.[2409,85GJ/jaar];Kwantiteit van energieelektrificatie.[24,13 MWh/jaar];Prod. elect. uit nieuw gebouwd. Gebruik de Inst. RES[14,3040MWhe/jaar];Producer van geëlektrificeerde energie uit nieuw gebouwde/nieuwe productiecapaciteit gebruikt. RES[14,3040MWhe/year]; Vervaardig warmte-energie. met nieuw gebouwde installatie. gebruik. RES[113,89MWht/jaar]; De productie van thermische energie uit nieuw gebouwd/nieuw uitgangsvermogen van de installatie. RES[113,89MWht/jaar]; Geraamde jaarlijkse daling van de warmtegasemissies.(CI34)[200,18 t CO2/jaar];Verminder het jaarlijkse primaire energieverbruik in publ.(CI32)[2 496,71 kWh/jaar]. (Dutch)
    17 December 2021
    0 references
    L'obiettivo principale dell'investimento previsto è migliorare l'efficienza energetica degli edifici pubblici che rimangono nelle risorse del comune di Gościradów.L'obiettivo previsto sarà raggiunto mediante una completa termomodernizzazione di cinque impianti di pubblica utilità situati nella Duchessa, Liśnik Dużym, Gościeradów Ukazowy, SALOMIN, Wólce Szczecka.Il gruppo destinatario dell'investimento è i residenti del comune di Gościradów.L'ambito dell'investimento obejmuje:Termomodernizację del magazzino e dell'edilizia sociale, 2 edifici del centro sanitario, dell'edificio SENIOR+ e del People's House Building,Elaboration of Energy Audits and Feasibility Study, Investor Supervision,Project Management,Promotion of the Project.Saranno installati anche i seguenti edifici: 2 caldaie a biomassa, 1 pompa aria-acqua e 5 impianti di fototensione con una capacità da 1,50 a 5,00 kWp situati sui tetti degli edifici. Nell'ambito del costo del non cavo, verranno eseguiti lavori per non migliorare l'effetto. energet. oggetti e la parte dei lavori corrispondente alla parte residenziale dell'edificio nel Duchosmeter, Large Linger e Salomin. L'effetto sarà aumentato. energet. dell'edificio del 75, 65 %.Nel quadro dell'investimento, saranno raggiunti i seguenti valori in termini di rezultatu:Dodatk energia elettrificata da fonti energetiche rinnovabili[0.0149MWe];Capacità supplementare per l'energia termica da fonti rinnovabili[MWt],Capacità supplementare per l'energia da fonti rinnovabili (CI30)[0,0750 MW];Quantità di risparmio di energia termica.[2409,85GJ/anno];Quantità di elettrificazione energetica.[24,13 MWh/anno];Prod. elect. da nuova costruzione. Usa l'Inst. RES[14,3040MWhe/anno];Produttore di energia elettrificata da capacità di nuova costruzione/nuova generazione utilizzata. RES[14,3040MWhe/anno];Produrre energia termica. con installazione di nuova costruzione. uso. RES[113,89MWht/anno]; La produzione di energia termica da nuova costruzione/nuova potenza di uscita dell'impianto utilizza. RES[113,89MWht/anno];Riduzione annua stimata delle emissioni di gas di calore.(CI34)[200,18 t CO2/anno];Ridurre il consumo annuo di energia primaria in publ.(CI32)[2 496,71 kWh/anno]. (Italian)
    15 January 2022
    0 references

    Identifiers

    RPLU.05.02.00-06-0065/19
    0 references