RECONSTRUCTION AND EXTENSION OF PART OF THE EXISTING SCHOOL TO PUBLIC KINDERGARTEN (Q102354): Difference between revisions

From EU Knowledge Graph
Jump to navigation Jump to search
(‎Changed label, description and/or aliases in nl, and other parts: Adding Dutch translations)
(‎Changed label, description and/or aliases in it, and other parts: Adding Italian translations)
label / itlabel / it
 
RICOSTRUZIONE ED ESTENSIONE DI PARTE DELLA SCUOLA ESISTENTE IN UN ASILO PUBBLICO
Property / summary
 
L'OGGETTO DEL PROGETTO. SARÀ LO SVILUPPO E LA RICOSTRUZIONE DELL'EDIFICIO ZSO A ZAPOLICACH PER IL FUNZIONAMENTO DI UN ASILO PER 100 BAMBINI. IL PROGETTO CONTRIBUIRÀ ALL'OBIETTIVO DIRETTO DI SVILUPPARE SERVIZI EDUCATIVI. IL RAGGIUNGIMENTO DI QUESTO OBIETTIVO SARÀ POSSIBILE ATTRAVERSO LA REALIZZAZIONE DI LAVORI DI COSTRUZIONE E INSTALLAZIONE CON ATTREZZATURE E ATTREZZATURE E AUSILI DIDATTICI PER IL FUNZIONAMENTO DELL'ASILO. IL PROGETTO DI AMPLIAMENTO E RICOSTRUZIONE DELL'EDIFICIO COMPRENDE UNA STRUTTURA A DUE PIANI NELLA PARTE PROGETTUALE, IN PARTE SEMINTERRATO NELLA PARTE RICOSTRUITA DI UN PIANO. LA SCUOLA ESISTENTE SARÀ AMPLIATA CON UN ASILO PUBBLICO, E NELLA PARTE RICOSTRUITA, CHE SARÀ IL COLLEGAMENTO TRA LA SCUOLA E L'ASILO, LA SALA DEL DIRETTORE, LA STANZA PER IL LAVORO INDIVIDUALE CON I BAMBINI, LA STANZA DEL INTENDENT, IL MAGAZZINO E I SERVIZI IGIENICI, NEL SEMINTERRATO DEL MAGAZZINO, IL MAGAZZINO CON KOTŁOWNIA.NELLA PARTE COSTRUITA AL PIANO TERRA C'È UNA MENSA CON UN NODO DI CUCINA, UNA STANZA DI UN GRUPPO DI ASILO CON UN MAGAZZINO E SERVIZI IGIENICI, GUARDAROBA E STANZE AUSILIARIE. IL LIVELLO DEL PAVIMENTO ZERO DELLA COSTRUZIONE PROGETTATA SARÀ POSTO AL DI SOPRA DI 30CM SOPRA IL LIVELLO DEL TERRENO, AL FINE DI SUPERARE IL DISLIVELLO — GRADINI PROGETTATI E RAMPA PER I DISABILI — ESTERNO. P. INSEGNANTI SI TROVANO SUL PAVIMENTO, POM. SOCIALE, POM. È UN GOSPOD. E TRE CAMERE DI GRUPPI DELL'ASILO CON MAGAZZINI E SERVIZI IGIENICI. L'INTERA AREA E L'EDIFICIO SONO DISPONIBILI PER OS. DISABILI ATTRAVERSO L'USO DI RAMPE ESTERNE E ASCENSORI NELL'EDIFICIO, OS. I DISABILI HANNO LA CAPACITÀ DI METTERSI DA SOLI A TUTTI I LIVELLI PER SODDISFARE LE ESIGENZE DEI BAMBINI CON DISABILITÀ IN G. ZAPOLICE CHE SONO ATTUALMENTE ALL'ETÀ DI 4 ANNI CON UN OBBLIGO DIFFERITO DI STUDIARE A SCUOLA. GRUPPO DESTINATARIO: 100 FIGLI DEL SIGNORE DELLA GUERRA. SONO LODZ. ZADANIA:ZWIĘKSZENIE ACCESSIBILITÀ E QUALITÀ DEI SERVIZI SOCIALI PER RIDURRE LA POVERTÀ E L'ESCLUSIONE SOCIALE (Italian)
Property / summary: L'OGGETTO DEL PROGETTO. SARÀ LO SVILUPPO E LA RICOSTRUZIONE DELL'EDIFICIO ZSO A ZAPOLICACH PER IL FUNZIONAMENTO DI UN ASILO PER 100 BAMBINI. IL PROGETTO CONTRIBUIRÀ ALL'OBIETTIVO DIRETTO DI SVILUPPARE SERVIZI EDUCATIVI. IL RAGGIUNGIMENTO DI QUESTO OBIETTIVO SARÀ POSSIBILE ATTRAVERSO LA REALIZZAZIONE DI LAVORI DI COSTRUZIONE E INSTALLAZIONE CON ATTREZZATURE E ATTREZZATURE E AUSILI DIDATTICI PER IL FUNZIONAMENTO DELL'ASILO. IL PROGETTO DI AMPLIAMENTO E RICOSTRUZIONE DELL'EDIFICIO COMPRENDE UNA STRUTTURA A DUE PIANI NELLA PARTE PROGETTUALE, IN PARTE SEMINTERRATO NELLA PARTE RICOSTRUITA DI UN PIANO. LA SCUOLA ESISTENTE SARÀ AMPLIATA CON UN ASILO PUBBLICO, E NELLA PARTE RICOSTRUITA, CHE SARÀ IL COLLEGAMENTO TRA LA SCUOLA E L'ASILO, LA SALA DEL DIRETTORE, LA STANZA PER IL LAVORO INDIVIDUALE CON I BAMBINI, LA STANZA DEL INTENDENT, IL MAGAZZINO E I SERVIZI IGIENICI, NEL SEMINTERRATO DEL MAGAZZINO, IL MAGAZZINO CON KOTŁOWNIA.NELLA PARTE COSTRUITA AL PIANO TERRA C'È UNA MENSA CON UN NODO DI CUCINA, UNA STANZA DI UN GRUPPO DI ASILO CON UN MAGAZZINO E SERVIZI IGIENICI, GUARDAROBA E STANZE AUSILIARIE. IL LIVELLO DEL PAVIMENTO ZERO DELLA COSTRUZIONE PROGETTATA SARÀ POSTO AL DI SOPRA DI 30CM SOPRA IL LIVELLO DEL TERRENO, AL FINE DI SUPERARE IL DISLIVELLO — GRADINI PROGETTATI E RAMPA PER I DISABILI — ESTERNO. P. INSEGNANTI SI TROVANO SUL PAVIMENTO, POM. SOCIALE, POM. È UN GOSPOD. E TRE CAMERE DI GRUPPI DELL'ASILO CON MAGAZZINI E SERVIZI IGIENICI. L'INTERA AREA E L'EDIFICIO SONO DISPONIBILI PER OS. DISABILI ATTRAVERSO L'USO DI RAMPE ESTERNE E ASCENSORI NELL'EDIFICIO, OS. I DISABILI HANNO LA CAPACITÀ DI METTERSI DA SOLI A TUTTI I LIVELLI PER SODDISFARE LE ESIGENZE DEI BAMBINI CON DISABILITÀ IN G. ZAPOLICE CHE SONO ATTUALMENTE ALL'ETÀ DI 4 ANNI CON UN OBBLIGO DIFFERITO DI STUDIARE A SCUOLA. GRUPPO DESTINATARIO: 100 FIGLI DEL SIGNORE DELLA GUERRA. SONO LODZ. ZADANIA:ZWIĘKSZENIE ACCESSIBILITÀ E QUALITÀ DEI SERVIZI SOCIALI PER RIDURRE LA POVERTÀ E L'ESCLUSIONE SOCIALE (Italian) / rank
 
Normal rank
Property / summary: L'OGGETTO DEL PROGETTO. SARÀ LO SVILUPPO E LA RICOSTRUZIONE DELL'EDIFICIO ZSO A ZAPOLICACH PER IL FUNZIONAMENTO DI UN ASILO PER 100 BAMBINI. IL PROGETTO CONTRIBUIRÀ ALL'OBIETTIVO DIRETTO DI SVILUPPARE SERVIZI EDUCATIVI. IL RAGGIUNGIMENTO DI QUESTO OBIETTIVO SARÀ POSSIBILE ATTRAVERSO LA REALIZZAZIONE DI LAVORI DI COSTRUZIONE E INSTALLAZIONE CON ATTREZZATURE E ATTREZZATURE E AUSILI DIDATTICI PER IL FUNZIONAMENTO DELL'ASILO. IL PROGETTO DI AMPLIAMENTO E RICOSTRUZIONE DELL'EDIFICIO COMPRENDE UNA STRUTTURA A DUE PIANI NELLA PARTE PROGETTUALE, IN PARTE SEMINTERRATO NELLA PARTE RICOSTRUITA DI UN PIANO. LA SCUOLA ESISTENTE SARÀ AMPLIATA CON UN ASILO PUBBLICO, E NELLA PARTE RICOSTRUITA, CHE SARÀ IL COLLEGAMENTO TRA LA SCUOLA E L'ASILO, LA SALA DEL DIRETTORE, LA STANZA PER IL LAVORO INDIVIDUALE CON I BAMBINI, LA STANZA DEL INTENDENT, IL MAGAZZINO E I SERVIZI IGIENICI, NEL SEMINTERRATO DEL MAGAZZINO, IL MAGAZZINO CON KOTŁOWNIA.NELLA PARTE COSTRUITA AL PIANO TERRA C'È UNA MENSA CON UN NODO DI CUCINA, UNA STANZA DI UN GRUPPO DI ASILO CON UN MAGAZZINO E SERVIZI IGIENICI, GUARDAROBA E STANZE AUSILIARIE. IL LIVELLO DEL PAVIMENTO ZERO DELLA COSTRUZIONE PROGETTATA SARÀ POSTO AL DI SOPRA DI 30CM SOPRA IL LIVELLO DEL TERRENO, AL FINE DI SUPERARE IL DISLIVELLO — GRADINI PROGETTATI E RAMPA PER I DISABILI — ESTERNO. P. INSEGNANTI SI TROVANO SUL PAVIMENTO, POM. SOCIALE, POM. È UN GOSPOD. E TRE CAMERE DI GRUPPI DELL'ASILO CON MAGAZZINI E SERVIZI IGIENICI. L'INTERA AREA E L'EDIFICIO SONO DISPONIBILI PER OS. DISABILI ATTRAVERSO L'USO DI RAMPE ESTERNE E ASCENSORI NELL'EDIFICIO, OS. I DISABILI HANNO LA CAPACITÀ DI METTERSI DA SOLI A TUTTI I LIVELLI PER SODDISFARE LE ESIGENZE DEI BAMBINI CON DISABILITÀ IN G. ZAPOLICE CHE SONO ATTUALMENTE ALL'ETÀ DI 4 ANNI CON UN OBBLIGO DIFFERITO DI STUDIARE A SCUOLA. GRUPPO DESTINATARIO: 100 FIGLI DEL SIGNORE DELLA GUERRA. SONO LODZ. ZADANIA:ZWIĘKSZENIE ACCESSIBILITÀ E QUALITÀ DEI SERVIZI SOCIALI PER RIDURRE LA POVERTÀ E L'ESCLUSIONE SOCIALE (Italian) / qualifier
 
point in time: 15 January 2022
Timestamp+2022-01-15T00:00:00Z
Timezone+00:00
CalendarGregorian
Precision1 day
Before0
After0

Revision as of 08:56, 15 January 2022

Project Q102354 in Poland
Language Label Description Also known as
English
RECONSTRUCTION AND EXTENSION OF PART OF THE EXISTING SCHOOL TO PUBLIC KINDERGARTEN
Project Q102354 in Poland

    Statements

    0 references
    2,923,748.22 zloty
    0 references
    701,699.57 Euro
    13 January 2020
    0 references
    3,439,703.79 zloty
    0 references
    825,528.91 Euro
    13 January 2020
    0 references
    85.0 percent
    0 references
    8 February 2016
    0 references
    31 December 2019
    0 references
    GMINA ZAPOLICE
    0 references

    51°32'27.6"N, 18°52'55.6"E
    0 references
    PRZEDMIOTEM PROJ. BĘDZIE ROZBUDOWYA I PRZEBUDOWA BUDYNKU ZSO W ZAPOLICACH Z PRZEZNACZENIEM NA FUNKCJONOWANIE PRZEDSZKOLA DLA 100 DZIECI. PROJEKT PRZYCZYNI SIĘ DO OSIĄGNIĘCIA CELU BEZPOŚREDNIEGO, JAKIM JEST ROZWÓJ USŁUG EDUKACYJNYCH. OSIĄGNIĘCIE TEGO CELU BĘDZIE MOŻLIWE DZIĘKI REALIZACJI ROBÓT BUDOWLANO-INSTALACYJNYCH, MONTAŻOWYCH Z WYPOSAŻENIEM I DOPOSAŻENIEM W SPRZĘT I POMOCE DYDAKTYCZNE NA POTRZEBY FUNKCJONOWANIA PRZEDSZKOLA. PROJEKT ROZBUDOWY I PRZEBUDOWY BUDYNKU OBEJMUJE OBIEKT DWUKONDYGNACYJNY W CZĘŚCI PROJEKTOWANEJ, CZĘŚCIOWO PODPIWNICZONY W CZĘŚCI PRZEBUDOWYWANEJ JEDNOKONDYGNACYJNEJ. ISTNIEJĄCA SZKOŁA ZOSTANIE ROZBUDOWANA O PRZEDSZKOLE PUBLICZNE, A W CZĘŚCI PRZEBUDOWYWANEJ, KTÓRA BĘDZIE ŁĄCZNIKIEM POMIĘDZY SZKOŁĄ A PRZEDSZKOLEM ZLOKALIZOWANO POKÓJ DYREKTORA, POMIESZCZENIE DO PRACY INDYWIDUALNEJ Z DZIEĆMI, POKÓJ INTENDENTKI, MAGAZYN I SANITARIATY, W PIWNICY MAGAZYN, MAGAZYN Z KOTŁOWNIĄ.W CZĘŚCI DOBUDOWANEJ NA PARTERZE ZLOKALIZOWANO POMIESZCZENIE STOŁÓWKI Z WĘZŁEM KUCHENNYM, SALĘ GRUPY PRZEDSZKOLNEJ Z MAGAZYNEM I SANITARIATAMI, SZATNIE I POMIESZCZENIA POMOCNICZE. POZIOM ZERO POSADZKI PARTERU PROJEKTOWANEJ BUDOWY POSADOWIONY ZOSTANIE POWYŻEJ 30CM PONAD POZIOM TERENU, DLA POKONANIA RÓŻNICY WYSOKOŚCI – PROJEKTOWANE STOPNIE I POCHYLNIA DLA NIEPEŁNOSPRAWNYCH - ZEWNĘTRZNE. NA PIĘTRZE ZLOKALIZOWANO P. NAUCZYCIELI, POM. SOCJALNE, POM. GOSPOD. ORAZ TRZY SALE GRUP PRZEDSZKOLNYCH Z MAGAZYNAMI I SANITARIATAMI. CAŁY TEREN ORAZ BUDYNEK SĄ DOSTĘPNE DLA OS. NIEPEŁNOSPRAWNYCH POPRZEZ ZASTOSOWANE POCHYLNI ZEWNĘTRZNYCH ORAZ WINDY W BUDYNKU, OS. NIEPEŁNOSPRAWNA MA MOŻLIWOŚĆ DOSTANIA SIĘ SAMODZIELNIE NA WSZYSTKIE POZIOMY CO ZASPOKOI POTRZEBY DZIECI Z NIEPEŁNOSPRAWNOŚCIĄ W G. ZAPOLICE KTÓRE OBECNIE SĄ W WIEKU 4 LAT Z ODROCZONYM OBOWIAZKIEM NAUKI W SZKOLE. GRUPA DOCELOWA: 100 DZIECI WOJ. ŁÓDZKIEGO. ZADANIA:ZWIĘKSZENIE DOSTĘPNOŚCI I JAKOŚCI USŁUG SPOŁECZNYCH OGRANICZAJĄCYCH UBÓSTWO I WYKLUCZENIE SPOŁECZNE (Polish)
    0 references
    THE OBJECT OF THE PROJECT. IT WILL BE REFERRED AND RECONSTRUCTION OF THE ZSO BUILDING IN ZAPOLICACH FOR THE OPERATION OF A KINDERGARTEN FOR 100 CHILDREN. THE PROJECT WILL CONTRIBUTE TO ACHIEVING THE DIRECT OBJECTIVE OF DEVELOPING EDUCATIONAL SERVICES. ACHIEVING THIS GOAL WILL BE POSSIBLE THANKS TO THE IMPLEMENTATION OF CONSTRUCTION AND INSTALLATION WORKS, ASSEMBLY WORKS WITH EQUIPMENT AND EQUIPMENT AND TEACHING AIDS FOR THE OPERATION OF THE KINDERGARTEN. THE EXTENSION AND REBUILDING OF THE BUILDING INCLUDES A TWO-STOREY STRUCTURE IN THE DESIGN PART, PARTIALLY SUBLIMINATED IN A SINGLE-STOREY PART. THE EXISTING SCHOOL WILL BE EXPANDED BY A PUBLIC KINDERGARTEN, AND IN THE RECONSTRUCTED PART, WHICH WILL BE A LINK BETWEEN THE SCHOOL AND THE KINDERGARTEN, THE DIRECTOR’S ROOM, THE INDIVIDUAL WORK ROOM WITH CHILDREN, THE INTENDENT’S ROOM, THE WAREHOUSE AND THE SANITARY FACILITIES IN THE BASEMENT.IN THE BUILT-UP PART ON THE GROUND FLOOR THERE WAS A CANTEEN ROOM WITH A KITCHEN KNOT, A PRESCHOOL ROOM WITH A WAREHOUSE AND AN AUXILIARY ROOM. LEVEL ZERO OF THE GROUND FLOOR OF THE DESIGNED CONSTRUCTION WILL BE ABOVE 30CM ABOVE THE GROUND LEVEL, TO OVERCOME THE DIFFERENCE IN HEIGHT – DESIGNED STEPS AND RAMP FOR THE DISABLED – EXTERNAL. ON THE FLOOR ARE LOCATED P. TEACHERS, POM. SOCIAL SERVICES, POM. IT’S A GOSSIP. AND THREE KINDERGARTEN CLASSROOMS WITH WAREHOUSES AND SANITARY FACILITIES. THE WHOLE AREA AND THE BUILDING ARE AVAILABLE FOR OS. DISABLED THROUGH EXTERNAL RAMPS AND ELEVATORS IN THE BUILDING, OS. THE DISABLED HAS THE POSSIBILITY TO GET TO ALL LEVELS ON THEIR OWN, WHICH WILL SATISFY THE NEEDS OF CHILDREN WITH DISABILITIES IN G. ZAPOLIKA, WHO ARE CURRENTLY AT THE AGE OF 4 WITH A POSTPONED SCHOOLING OBLIGATION. TARGET GROUP: 100 CHILDREN OF WAR. I'M FROM LODZ. OBJECTIVES: TO INCREASE THE ACCESSIBILITY AND QUALITY OF SOCIAL SERVICES THAT REDUCE POVERTY AND SOCIAL EXCLUSION (English)
    17 October 2020
    0 references
    L’OBJET DU PROJET. IL S’AGIRA DU DÉVELOPPEMENT ET DE LA RECONSTRUCTION DU BÂTIMENT ZSO À ZAPOLICACH POUR L’EXPLOITATION D’UN JARDIN D’ENFANTS POUR 100 ENFANTS. LE PROJET CONTRIBUERA À LA RÉALISATION DE L’OBJECTIF DIRECT DE DÉVELOPPEMENT DES SERVICES ÉDUCATIFS. LA RÉALISATION DE CET OBJECTIF SERA POSSIBLE GRÂCE À LA MISE EN ŒUVRE DE TRAVAUX DE CONSTRUCTION ET D’INSTALLATION AVEC DES ÉQUIPEMENTS ET ÉQUIPEMENTS ET DES AIDES PÉDAGOGIQUES POUR LE FONCTIONNEMENT DE LA MATERNELLE. LE PROJET D’EXTENSION ET DE RECONSTRUCTION DU BÂTIMENT COMPREND UNE INSTALLATION DE DEUX ÉTAGES DANS LA PARTIE DE CONCEPTION, EN PARTIE SOUS-SOL DANS LA PARTIE RECONSTRUITE D’UN ÉTAGE. L’ÉCOLE EXISTANTE SERA AGRANDIE AVEC UN JARDIN D’ENFANTS PUBLIC, ET DANS LA PARTIE RECONSTRUITE, QUI SERA LE LIEN ENTRE L’ÉCOLE ET LA MATERNELLE, LA SALLE DU DIRECTEUR, LA SALLE DE TRAVAIL INDIVIDUEL AVEC LES ENFANTS, LA CHAMBRE DE L’INTENDANT, L’ENTREPÔT ET LES SANITAIRES, AU SOUS-SOL DE L’ENTREPÔT, L’ENTREPÔT AVEC KOTŁOWNIA.DANS LA PARTIE CONSTRUITE AU REZ-DE-CHAUSSÉE IL Y A UNE SALLE DE CANTINE AVEC UN NŒUD DE CUISINE, UNE SALLE D’UN GROUPE DE MATERNELLES AVEC UN ENTREPÔT ET DES INSTALLATIONS SANITAIRES, DES VESTIAIRES ET DES LOCAUX AUXILIAIRES. LE NIVEAU DE PLANCHER ZÉRO DE LA CONSTRUCTION CONÇUE SERA PLACÉ AU-DESSUS DE 30 CM AU-DESSUS DU NIVEAU DU TERRAIN, AFIN DE SURMONTER LA DIFFÉRENCE DE HAUTEUR — MARCHES ET RAMPES CONÇUES POUR LES HANDICAPÉS — EXTERNE. P. ENSEIGNANTS SONT SITUÉS À L’ÉTAGE, POM. SOCIAL, POM. C’EST UN GOSPODE. ET TROIS CHAMBRES DE GROUPES DE MATERNELLES AVEC ENTREPÔTS ET SANITAIRES. L’ENSEMBLE DE LA ZONE ET LE BÂTIMENT SONT DISPONIBLES POUR OS. HANDICAPÉ PAR L’UTILISATION DE RAMPES ET D’ASCENSEURS EXTERNES DANS LE BÂTIMENT, OS. LES HANDICAPÉS ONT LA POSSIBILITÉ DE SE DÉBROUILLER SEULS À TOUS LES NIVEAUX POUR RÉPONDRE AUX BESOINS DES ENFANTS HANDICAPÉS DE G. ZAPOLICE QUI SONT ACTUELLEMENT ÂGÉS DE 4 ANS AVEC L’OBLIGATION DIFFÉRÉE D’ÉTUDIER À L’ÉCOLE. GROUPE CIBLE: 100 ENFANTS DU SEIGNEUR DE GUERRE. C’EST LODZ. ZADANIA:ZWIĘKSZENIE ACCESSIBILITÉ ET QUALITÉ DES SERVICES SOCIAUX VISANT À RÉDUIRE LA PAUVRETÉ ET L’EXCLUSION SOCIALE (French)
    1 December 2021
    0 references
    GEGENSTAND DES PROJEKTS. ES WIRD DIE ENTWICKLUNG UND DEN WIEDERAUFBAU DES ZSO-GEBÄUDES IN ZAPOLICACH FÜR DEN BETRIEB EINES KINDERGARTENS FÜR 100 KINDER SEIN. DAS PROJEKT WIRD ZUM DIREKTEN ZIEL DER ENTWICKLUNG VON BILDUNGSDIENSTEN BEITRAGEN. DIE VERWIRKLICHUNG DIESES ZIELS WIRD DURCH DIE DURCHFÜHRUNG VON BAU- UND INSTALLATIONSARBEITEN MIT GERÄTEN UND GERÄTEN UND LEHRMITTELN FÜR DEN BETRIEB DES KINDERGARTENS MÖGLICH SEIN. DAS PROJEKT ZUR ERWEITERUNG UND REKONSTRUKTION DES GEBÄUDES UMFASST EINE ZWEISTÖCKIGE ANLAGE IM ENTWURFSTEIL, TEILWEISE KELLER IM REKONSTRUIERTEN EINSTÖCKIGEN TEIL. DIE BESTEHENDE SCHULE WIRD UM EINEN ÖFFENTLICHEN KINDERGARTEN ERWEITERT, UND IM UMGEBAUTEN TEIL, DER DIE VERBINDUNG ZWISCHEN SCHULE UND KINDERGARTEN, DEM DIREKTORSZIMMER, DEM RAUM FÜR DIE INDIVIDUELLE ARBEIT MIT KINDERN, DEM ZIMMER DES INDIVIDUUMS, DEM LAGERHAUS UND DEN SANITÄRANLAGEN, IM KELLER DES LAGERHAUSES, DEM LAGERHAUS MIT KOTŁOWNIA SEIN WIRD.IN DEM IM ERDGESCHOSS GEBAUTEN TEIL BEFINDET SICH EIN KANTINERAUM MIT KÜCHENKNOTEN, EIN RAUM EINER KINDERGARTENGRUPPE MIT LAGER- UND SANITÄRANLAGEN, GARDEROBEN UND NEBENRÄUMEN. DIE HÖHE DES NULLBODENBODENS DER ENTWORFENEN KONSTRUKTION WIRD ÜBER 30CM ÜBER DEM NIVEAU DES GELÄNDES PLATZIERT, UM DEN UNTERSCHIED IN DER HÖHE – ENTWORFENE STUFEN UND RAMPE FÜR BEHINDERTE – AUSSEN ZU ÜBERWINDEN. P. LEHRER BEFINDEN SICH AUF DEM BODEN, POM. SOZIALES, POM. DAS IST EIN MISTKERL. UND DREI RÄUME VON KINDERGARTENGRUPPEN MIT LAGERHÄUSERN UND SANITÄREN EINRICHTUNGEN. DER GESAMTE BEREICH UND DAS GEBÄUDE STEHEN FÜR OS ZUR VERFÜGUNG. BEHINDERT DURCH DEN EINSATZ VON EXTERNEN RAMPEN UND AUFZÜGEN IM GEBÄUDE, OS. DIE BEHINDERTEN HABEN DIE FÄHIGKEIT, AUF ALLEN EBENEN AUF ALLEN EBENEN ZU GELANGEN, UM DEN BEDÜRFNISSEN VON KINDERN MIT BEHINDERUNGEN IN G. ZAPOLICE GERECHT ZU WERDEN, DIE DERZEIT IM ALTER VON 4 JAHREN MIT EINER AUFGESCHOBENEN PFLICHT ZUM STUDIUM AN DER SCHULE SIND. ZIELGRUPPE: 100 KINDER DES KRIEGSHERRN. ES IST LODZ. ZADANIA:ZWIĘKSZENIE ZUGÄNGLICHKEIT UND QUALITÄT SOZIALER DIENSTLEISTUNGEN ZUR VERRINGERUNG VON ARMUT UND SOZIALER AUSGRENZUNG (German)
    7 December 2021
    0 references
    HET ONDERWERP VAN HET PROJECT. HET GAAT OM DE ONTWIKKELING EN WEDEROPBOUW VAN HET ZSO-GEBOUW IN ZAPOLICACH VOOR DE EXPLOITATIE VAN EEN KLEUTERSCHOOL VOOR 100 KINDEREN. HET PROJECT ZAL BIJDRAGEN TOT DE DIRECTE DOELSTELLING VAN DE ONTWIKKELING VAN ONDERWIJSDIENSTEN. DE VERWEZENLIJKING VAN DIT DOEL ZAL MOGELIJK ZIJN DOOR DE UITVOERING VAN BOUW- EN INSTALLATIEWERKZAAMHEDEN MET APPARATUUR EN APPARATUUR EN ONDERWIJSHULPMIDDELEN VOOR DE WERKING VAN DE KLEUTERSCHOOL. HET PROJECT VOOR DE UITBREIDING EN WEDEROPBOUW VAN HET GEBOUW OMVAT EEN TWEE VERDIEPINGEN TELLENDE FACILITEIT IN HET ONTWERPGEDEELTE, DEELS KELDER IN HET GERECONSTRUEERDE DEEL VAN EEN VERDIEPING. DE BESTAANDE SCHOOL ZAL WORDEN UITGEBREID MET EEN OPENBARE KLEUTERSCHOOL, EN IN HET HERBOUWDE DEEL, DAT DE VERBINDING ZAL ZIJN TUSSEN DE SCHOOL EN DE KLEUTERSCHOOL, DE DIRECTEURSKAMER, DE RUIMTE VOOR INDIVIDUEEL WERK MET KINDEREN, DE INTENTIEKAMER, HET MAGAZIJN EN SANITAIRE VOORZIENINGEN, IN DE KELDER VAN HET MAGAZIJN, HET MAGAZIJN MET KOTŁOWNIA.IN HET DEEL DAT OP DE BEGANE GROND IS GEBOUWD, IS ER EEN KANTINERUIMTE MET EEN KEUKENKNOOPPUNT, EEN KAMER VAN EEN KLEUTERSCHOOLGROEP MET EEN MAGAZIJN EN SANITAIRE VOORZIENINGEN, GARDEROBE EN HULPKAMERS. HET NIVEAU VAN DE NULVLOERVLOER VAN DE ONTWORPEN CONSTRUCTIE ZAL BOVEN 30 CM BOVEN HET NIVEAU VAN HET TERREIN WORDEN GEPLAATST, OM HET VERSCHIL IN HOOGTE — ONTWORPEN TREDEN EN HELLING VOOR GEHANDICAPTEN — EXTERN TE OVERWINNEN. P. LERAREN BEVINDEN ZICH OP DE VLOER, POM. SOCIAAL, POM. HET IS EEN GOSPOD. EN DRIE KAMERS VAN KLEUTERSCHOLEN GROEPEN MET MAGAZIJNEN EN SANITAIRE VOORZIENINGEN. HET HELE GEBIED EN HET GEBOUW ZIJN BESCHIKBAAR VOOR OS. UITGESCHAKELD DOOR HET GEBRUIK VAN EXTERNE HELLINGEN EN LIFTEN IN HET GEBOUW, OS. GEHANDICAPTEN HEBBEN DE MOGELIJKHEID OM OP ALLE NIVEAUS OP ZICHZELF TE KOMEN OM TEGEMOET TE KOMEN AAN DE BEHOEFTEN VAN KINDEREN MET EEN HANDICAP IN G. ZAPOLICE DIE MOMENTEEL OP DE LEEFTIJD VAN 4 JAAR ZIJN, MET EEN UITGESTELDE VERPLICHTING OM OP SCHOOL TE STUDEREN. DOELGROEP: 100 KINDEREN VAN DE KRIJGSHEER. HET IS LODZ. ZADANIA:ZWIĘKSZENIE TOEGANKELIJKHEID EN KWALITEIT VAN SOCIALE DIENSTEN TER BESTRIJDING VAN ARMOEDE EN SOCIALE UITSLUITING (Dutch)
    17 December 2021
    0 references
    L'OGGETTO DEL PROGETTO. SARÀ LO SVILUPPO E LA RICOSTRUZIONE DELL'EDIFICIO ZSO A ZAPOLICACH PER IL FUNZIONAMENTO DI UN ASILO PER 100 BAMBINI. IL PROGETTO CONTRIBUIRÀ ALL'OBIETTIVO DIRETTO DI SVILUPPARE SERVIZI EDUCATIVI. IL RAGGIUNGIMENTO DI QUESTO OBIETTIVO SARÀ POSSIBILE ATTRAVERSO LA REALIZZAZIONE DI LAVORI DI COSTRUZIONE E INSTALLAZIONE CON ATTREZZATURE E ATTREZZATURE E AUSILI DIDATTICI PER IL FUNZIONAMENTO DELL'ASILO. IL PROGETTO DI AMPLIAMENTO E RICOSTRUZIONE DELL'EDIFICIO COMPRENDE UNA STRUTTURA A DUE PIANI NELLA PARTE PROGETTUALE, IN PARTE SEMINTERRATO NELLA PARTE RICOSTRUITA DI UN PIANO. LA SCUOLA ESISTENTE SARÀ AMPLIATA CON UN ASILO PUBBLICO, E NELLA PARTE RICOSTRUITA, CHE SARÀ IL COLLEGAMENTO TRA LA SCUOLA E L'ASILO, LA SALA DEL DIRETTORE, LA STANZA PER IL LAVORO INDIVIDUALE CON I BAMBINI, LA STANZA DEL INTENDENT, IL MAGAZZINO E I SERVIZI IGIENICI, NEL SEMINTERRATO DEL MAGAZZINO, IL MAGAZZINO CON KOTŁOWNIA.NELLA PARTE COSTRUITA AL PIANO TERRA C'È UNA MENSA CON UN NODO DI CUCINA, UNA STANZA DI UN GRUPPO DI ASILO CON UN MAGAZZINO E SERVIZI IGIENICI, GUARDAROBA E STANZE AUSILIARIE. IL LIVELLO DEL PAVIMENTO ZERO DELLA COSTRUZIONE PROGETTATA SARÀ POSTO AL DI SOPRA DI 30CM SOPRA IL LIVELLO DEL TERRENO, AL FINE DI SUPERARE IL DISLIVELLO — GRADINI PROGETTATI E RAMPA PER I DISABILI — ESTERNO. P. INSEGNANTI SI TROVANO SUL PAVIMENTO, POM. SOCIALE, POM. È UN GOSPOD. E TRE CAMERE DI GRUPPI DELL'ASILO CON MAGAZZINI E SERVIZI IGIENICI. L'INTERA AREA E L'EDIFICIO SONO DISPONIBILI PER OS. DISABILI ATTRAVERSO L'USO DI RAMPE ESTERNE E ASCENSORI NELL'EDIFICIO, OS. I DISABILI HANNO LA CAPACITÀ DI METTERSI DA SOLI A TUTTI I LIVELLI PER SODDISFARE LE ESIGENZE DEI BAMBINI CON DISABILITÀ IN G. ZAPOLICE CHE SONO ATTUALMENTE ALL'ETÀ DI 4 ANNI CON UN OBBLIGO DIFFERITO DI STUDIARE A SCUOLA. GRUPPO DESTINATARIO: 100 FIGLI DEL SIGNORE DELLA GUERRA. SONO LODZ. ZADANIA:ZWIĘKSZENIE ACCESSIBILITÀ E QUALITÀ DEI SERVIZI SOCIALI PER RIDURRE LA POVERTÀ E L'ESCLUSIONE SOCIALE (Italian)
    15 January 2022
    0 references

    Identifiers

    RPLD.07.04.02-10-0018/16
    0 references