Thermal modernisation of buildings, thermal grid and local boiler room JUNIOR in Miłków (Q95643): Difference between revisions

From EU Knowledge Graph
Jump to navigation Jump to search
(‎Changed label, description and/or aliases in nl, and other parts: Adding Dutch translations)
(‎Changed label, description and/or aliases in it, and other parts: Adding Italian translations)
label / itlabel / it
 
Termomodernizzazione degli edifici, della rete termica e della caldaia locale del JUNIOR Social Welfare House a Miłków
Property / summary
 
Il progetto prevede una completa termomodernizzazione di 3 edifici (n. 1, 3, 6/7), l'ammodernamento delle reti di riscaldamento e riscaldamento e l'ammodernamento del locale caldaia locale (edificio n. 11) di DPS JUNIOR a Miłków con l'uso di fonti energetiche rinnovabili (biomassa e energia solare). Portata del lavoro: Costruzione n. 1 installazione di nuove caldaie a biomassa sul riscaldamento centrale e centrale. Installazione di raccordi a risparmio energetico ai fini del riscaldamento dell'acqua calda del soffitto dell'ultimo piano dell'edificio B riscaldamento del tetto dell'edificio B riscaldando le pareti esterne dell'edificio A e il connettore Edificio n. 3 installazione di raccordi a risparmio energetico nell'installazione del riscaldamento del tetto dell'edificio delle pareti esterne del mattone e delle terrazze di riscaldamento in legno sostituzione di vecchie finestre in legno e falegnameria di porte Costruzione n. 6/7 installazione di raccordi a risparmio energetico nel sistema di riscaldamento dell'edificio del tetto dell'edificio riscaldamento delle pareti esterne che sostituiscono la finestra e la falegnameria della porta Thermal e della rete di acqua calda. — Conversione del locale caldaia a biomassa in trucioli/pellet alimentati a biomassa con una capacità di 400 kW. Lavori di ristrutturazione e ristrutturazione di locali caldaie per la tecnologia a biomassa. Conversione della tecnologia dell'impianto di caldaie a combustibile solido. Installazione di sistemi di alimentazione e controllo dell'alimentazione del carburante. Condotti del camino con il diametro richiesto. Locale caldaia automatica e installazione elettrica. — Impianto fotovoltaico con una potenza di min. 10,2 kWp, con un sistema di accumulo di energia di 4,5 kWh, montato sull'edificio del locale caldaia o accanto al locale caldaia, automazione, installazione elettrica, struttura di montaggio, impianto fulmini. — Installazione di collettori solari con una superficie attiva di 52,56 m², che supporta la produzione di acqua calda per edifici, serbatoi tampone, acqua calda e calda, raccordi, automazione, costruzione freestanding. Attività didattiche degli utenti destinatari (Italian)
Property / summary: Il progetto prevede una completa termomodernizzazione di 3 edifici (n. 1, 3, 6/7), l'ammodernamento delle reti di riscaldamento e riscaldamento e l'ammodernamento del locale caldaia locale (edificio n. 11) di DPS JUNIOR a Miłków con l'uso di fonti energetiche rinnovabili (biomassa e energia solare). Portata del lavoro: Costruzione n. 1 installazione di nuove caldaie a biomassa sul riscaldamento centrale e centrale. Installazione di raccordi a risparmio energetico ai fini del riscaldamento dell'acqua calda del soffitto dell'ultimo piano dell'edificio B riscaldamento del tetto dell'edificio B riscaldando le pareti esterne dell'edificio A e il connettore Edificio n. 3 installazione di raccordi a risparmio energetico nell'installazione del riscaldamento del tetto dell'edificio delle pareti esterne del mattone e delle terrazze di riscaldamento in legno sostituzione di vecchie finestre in legno e falegnameria di porte Costruzione n. 6/7 installazione di raccordi a risparmio energetico nel sistema di riscaldamento dell'edificio del tetto dell'edificio riscaldamento delle pareti esterne che sostituiscono la finestra e la falegnameria della porta Thermal e della rete di acqua calda. — Conversione del locale caldaia a biomassa in trucioli/pellet alimentati a biomassa con una capacità di 400 kW. Lavori di ristrutturazione e ristrutturazione di locali caldaie per la tecnologia a biomassa. Conversione della tecnologia dell'impianto di caldaie a combustibile solido. Installazione di sistemi di alimentazione e controllo dell'alimentazione del carburante. Condotti del camino con il diametro richiesto. Locale caldaia automatica e installazione elettrica. — Impianto fotovoltaico con una potenza di min. 10,2 kWp, con un sistema di accumulo di energia di 4,5 kWh, montato sull'edificio del locale caldaia o accanto al locale caldaia, automazione, installazione elettrica, struttura di montaggio, impianto fulmini. — Installazione di collettori solari con una superficie attiva di 52,56 m², che supporta la produzione di acqua calda per edifici, serbatoi tampone, acqua calda e calda, raccordi, automazione, costruzione freestanding. Attività didattiche degli utenti destinatari (Italian) / rank
 
Normal rank
Property / summary: Il progetto prevede una completa termomodernizzazione di 3 edifici (n. 1, 3, 6/7), l'ammodernamento delle reti di riscaldamento e riscaldamento e l'ammodernamento del locale caldaia locale (edificio n. 11) di DPS JUNIOR a Miłków con l'uso di fonti energetiche rinnovabili (biomassa e energia solare). Portata del lavoro: Costruzione n. 1 installazione di nuove caldaie a biomassa sul riscaldamento centrale e centrale. Installazione di raccordi a risparmio energetico ai fini del riscaldamento dell'acqua calda del soffitto dell'ultimo piano dell'edificio B riscaldamento del tetto dell'edificio B riscaldando le pareti esterne dell'edificio A e il connettore Edificio n. 3 installazione di raccordi a risparmio energetico nell'installazione del riscaldamento del tetto dell'edificio delle pareti esterne del mattone e delle terrazze di riscaldamento in legno sostituzione di vecchie finestre in legno e falegnameria di porte Costruzione n. 6/7 installazione di raccordi a risparmio energetico nel sistema di riscaldamento dell'edificio del tetto dell'edificio riscaldamento delle pareti esterne che sostituiscono la finestra e la falegnameria della porta Thermal e della rete di acqua calda. — Conversione del locale caldaia a biomassa in trucioli/pellet alimentati a biomassa con una capacità di 400 kW. Lavori di ristrutturazione e ristrutturazione di locali caldaie per la tecnologia a biomassa. Conversione della tecnologia dell'impianto di caldaie a combustibile solido. Installazione di sistemi di alimentazione e controllo dell'alimentazione del carburante. Condotti del camino con il diametro richiesto. Locale caldaia automatica e installazione elettrica. — Impianto fotovoltaico con una potenza di min. 10,2 kWp, con un sistema di accumulo di energia di 4,5 kWh, montato sull'edificio del locale caldaia o accanto al locale caldaia, automazione, installazione elettrica, struttura di montaggio, impianto fulmini. — Installazione di collettori solari con una superficie attiva di 52,56 m², che supporta la produzione di acqua calda per edifici, serbatoi tampone, acqua calda e calda, raccordi, automazione, costruzione freestanding. Attività didattiche degli utenti destinatari (Italian) / qualifier
 
point in time: 16 January 2022
Timestamp+2022-01-16T00:00:00Z
Timezone+00:00
CalendarGregorian
Precision1 day
Before0
After0

Revision as of 01:14, 16 January 2022

Project Q95643 in Poland
Language Label Description Also known as
English
Thermal modernisation of buildings, thermal grid and local boiler room JUNIOR in Miłków
Project Q95643 in Poland

    Statements

    0 references
    2,854,759.36 zloty
    0 references
    685,142.25 Euro
    13 January 2020
    0 references
    3,358,540.43 zloty
    0 references
    806,049.7 Euro
    13 January 2020
    0 references
    85.0 percent
    0 references
    18 December 2015
    0 references
    30 September 2019
    0 references
    POWIAT JELENIOGÓRSKI
    0 references
    Projekt obejmuje kompleksową termomodernizację 3 budynków (nr 1, 3, 6/7), modernizację sieci cieplnej c.o. i c.w.u. oraz modernizację lokalnej kotłowni (budynek nr 11) DPS JUNIOR w Miłkowie z zastosowaniem OZE (biomasa i energia słoneczna). Zakres prac: Budynek nr 1 montaż nowych kotłów na biomasę na c.o. i c.w.u. montaż armatury energooszczędnej na potrzeby c.w.u. ocieplenie stropu ostatniej kondygnacji ocieplenie ścian zewnętrznych budynku B ocieplenie stropodachu docieplenie ścian zewnętrznych budynku A i łącznika Budynek nr 3 montaż armatury energooszczędnej w instalacji c.w.u. ocieplenie dachu budynku ocieplenie ścian zewnętrznych murowanych i drewnianych ocieplenie tarasów wymiana starej drewnianej stolarki okiennej i drzwiowej Budynek nr 6/7 montaż armatury energooszczędnej w instalacji c.w.u. ocieplenie dachu budynku ocieplenie ścian zewnętrznych wymiana stolarki okiennej i drzwiowej Sieć cieplna c.o. i c.w.u. Kompleksowa modernizacja sieci c.o. oraz c.w.u., wraz z wymianą armatury Odłączenie budynku nr 17 od sieci ciepłej wody użytkowej Lokalna kotłownia: - Przebudowa kotłowni olejowej na opalaną biomasą (zamiennie zrębki/pellet) o mocy 400 kW. Roboty remontowe i renowacyjne pomieszczeń kotłowni pod zabudowę technologii na biomasę. Przebudowa technologii kotłowni olejowej na paliwo stałe. Montaż systemów podawania paliwa i sterowania podawaniem paliwa. Przewody kominowe o wymaganej średnicy. Automatyka kotłowni i instalacja elektryczna. - Instalacja fotowoltaiczna o mocy min. 10,2 kWp, z układem magazynowania energii o mocy 4,5 kWh, zamontowane na budynku kotłowni lub obok kotłowni, automatyka, instalacja elektryczna, konstrukcja mocująca, instalacja odgromowa. - Instalacja kolektorów słonecznych o powierzchni czynnej 52,56 m2, wspomagających wytwarzanie ciepłej wody użytkowej dla budynków, zbiorniki buforowe c.o. i c.w.u., armatura, automatyka, konstrukcja wolnostojąca. Działania edukacyjne użytkowników docelowych (Polish)
    0 references
    The project includes a comprehensive thermal modernisation of 3 buildings (No 1, 3, 6/7), modernisation of the central heating network and modernisation of the local boiler room (building no. 11) DPS JUNIOR in Miłków with the use of RES (biomass and solar energy). Scope of work: Building no. 1 mounting of new boilers for biomass on central and central heating. installation of energy-saving fittings for the needs of central heating. warming of the ceiling of the last floor warming of the outer walls of the building B in warming of the ceiling door warming up the outer walls of the building A and the connector Building No. 3 installation of the power-saving armature in the installation of the interior of the building. — Refurbishment of the oil boiler room with biomass (interchangeable chips/pellets) with a power of 400 kW. Repair and renovation works of the boiler room for biomass technology. Conversion of oil boiler room technology into solid fuel. Installation of fuel feed and fuel feed control systems. Chimney cables with the required diameter. Boiler room automation and electrical installation. — Photovoltaic installation with a power min. 10.2 kWp, with an energy storage system of 4.5 kWh, mounted on a boiler room building or next to a boiler room, automation, electrical installation, mounting structure, lightning installation. — Installation of solar collectors with an active area of 52.56 m², supporting the production of hot water for buildings, buffer tanks of central and central heating, fittings, automation, freestanding construction. Educational actions of target users (English)
    15 October 2020
    0 references
    Le projet comprend la thermomodernisation complète de 3 bâtiments (nos 1, 3, 6/7), la modernisation des réseaux de chauffage et de chauffage et la modernisation de la chaufferie locale (bâtiment no 11) de DPS JUNIOR à Miłków avec l’utilisation des sources d’énergie renouvelables (biomasse et énergie solaire). Portée des travaux: Bâtiment No 1 installation de nouvelles chaudières à biomasse sur le chauffage central et central. Installation de raccords économes en énergie pour les besoins du chauffage de l’eau chaude du plafond du dernier étage du bâtiment B réchauffement du toit du bâtiment B chauffe des murs extérieurs du bâtiment B chauffe des murs extérieurs du bâtiment A et du connecteur Bâtiment no 3 Installation d’équipements économes en énergie dans l’installation du bâtiment réchauffement des murs extérieurs de la brique et du bois terrasses chauffantes remplacement de la vieille fenêtre en bois et de la menuiserie de porte Bâtiment no 6/7 installation d’équipements économes en énergie dans le système de chauffage du bâtiment chauffage du bâtiment chauffage des murs extérieurs remplaçant la fenêtre et la porte joint d’eau Thermal et le réseau d’eau chaude. — Conversion de la chaudière à huile en copeaux/pellets de bois chauffés à la biomasse d’une capacité de 400 kW. Travaux de rénovation et de rénovation des chaufferies pour la technologie de la biomasse. Conversion de la technologie des chaudières à huile en combustible solide. Installation de systèmes d’alimentation et de commande d’alimentation en carburant. Conduits de cheminée ayant le diamètre requis. Chaufferie automatique et installation électrique. — Installation photovoltaïque d’une puissance minimale de 10,2 kWp, avec un système de stockage d’énergie de 4,5 kWh, monté sur le bâtiment de la chaufferie ou à côté de la chaufferie, automatisation, installation électrique, structure de montage, système de foudre. — Installation de capteurs solaires d’une surface active de 52,56 m², soutenant la production d’eau chaude pour les bâtiments, réservoirs tampons, eau chaude et chaude, raccords, automatisation, construction autonome. Activités éducatives des utilisateurs cibles (French)
    1 December 2021
    0 references
    Das Projekt umfasst eine umfassende Thermomodernisierung von 3 Gebäuden (nos 1, 3, 6/7), Modernisierung der Heiz- und Heiznetze sowie Modernisierung des lokalen Kesselraums (Gebäude Nr. 11) von DPS JUNIOR in Miłków mit der Nutzung von RES (Biomasse und Solarenergie). Umfang der Arbeiten: Gebäude Nr. 1 Installation von neuen Biomasse-Kesseln auf Zentral- und Zentralheizung. Installation von energiesparenden Armaturen für die Warmwasserbereitung der Decke des letzten Stockwerks des Gebäudes B Erwärmung des Daches des Gebäudes B Erwärmung der Außenwände des Gebäudes B Erwärmen der Außenwände des Gebäudes A und des Anschlusses Gebäude Nr. 3 Installation von energiesparenden Armaturen in der Installation des Gebäudes Dacherwärmung der Außenwände des Ziegels und Holzwärmer Terrassen Ersatz der alten Holzfenster und Türschließe Gebäude Nr. 6/7 Installation von Energiespararmaturen in der Heizung des Gebäudes Dachheizung der Außenwände des Ziegels und Türschlosses 17 Wärme- und Warmwassernetz. — Umstellung des Ölkesselraums auf mit Biomasse befeuerte Holzschnitzel/Pellets mit einer Leistung von 400 kW. Renovierungs- und Renovierungsarbeiten an Kesselräumen für Biomassetechnik. Umwandlung der Ölkesselanlagentechnologie auf Festbrennstoff. Einbau von Kraftstoffzuführungs- und Fütterungskontrollsystemen. Schornsteinkanäle mit dem erforderlichen Durchmesser. Automatischer Kesselraum und elektrische Installation. — Photovoltaikanlage mit einer Leistung von mindestens 10,2 kWp, mit einem Energiespeicher von 4,5 kWh, montiert am Kesselraumgebäude oder neben dem Kesselraum, Automatisierung, Elektroinstallation, Montagestruktur, Blitzsystem. — Installation von Solarkollektoren mit einer aktiven Fläche von 52,56 m², zur Unterstützung der Produktion von Warmwasser für Gebäude, Puffertanks, Warmwasser, Armaturen, Automatisierung, freistehender Bau. Bildungsaktivitäten der Zielnutzer (German)
    7 December 2021
    0 references
    Het project omvat een uitgebreide thermomodernisering van 3 gebouwen (nrs. 1, 3, 6/7), modernisering van verwarmings- en verwarmingsnetwerken en modernisering van de lokale ketelruimte (gebouw nr. 11) van DPS JUNIOR in Miłków met het gebruik van hernieuwbare energiebronnen (biomassa en zonne-energie). Reikwijdte van de werkzaamheden: Gebouw nr. 1 installatie van nieuwe biomassa ketels op centrale en centrale verwarming. Installatie van energiebesparende fittingen ten behoeve van de warmwaterverwarming van het plafond van de laatste verdieping van gebouw B warming van het dak van het gebouw B opwarmen van de buitenmuren van gebouw A en de connector Gebouw nr. 6/7 installatie van energiebesparende fittingen in de installatie van het gebouw dak verwarmen van de buitenmuren van de baksteen en houten opwarming terrassen vervanging van oude houten raam en deur schrijnwerk Gebouw nr. 6/7 installatie van energiebesparende fittingen in het verwarmingssysteem van het gebouw dak verwarmen van buitenmuren ter vervanging van ramen en deur schrijnwerk Thermische en warmwaternetwerk. Uitgebreide modernisering van de centrale verwarming. — Omzetting van de olieketelruimte in met biomassa gestookte houtsnippers/pellets met een capaciteit van 400 kW. Renovatie- en renovatiewerkzaamheden van ketelruimten voor biomassatechnologie. Omzetting van olie ketel installatie technologie naar vaste brandstof. Installatie van brandstoftoevoer- en voercontrolesystemen. Schoorsteenkanalen met de vereiste diameter. Automatische ketelruimte en elektrische installatie. Fotovoltaïsche installatie met een vermogen van min. 10,2 kWp, met een energieopslagsysteem van 4,5 kWh, gemonteerd op de ketelruimte of naast de ketelruimte, automatisering, elektrische installatie, montagestructuur, bliksemsysteem. — Installatie van zonnecollectoren met een actief gebied van 52,56 m², ter ondersteuning van de productie van warm water voor gebouwen, buffertanks, warm en warm water, fittingen, automatisering, vrijstaande bouw. Educatieve activiteiten van de doelgebruikers (Dutch)
    16 December 2021
    0 references
    Il progetto prevede una completa termomodernizzazione di 3 edifici (n. 1, 3, 6/7), l'ammodernamento delle reti di riscaldamento e riscaldamento e l'ammodernamento del locale caldaia locale (edificio n. 11) di DPS JUNIOR a Miłków con l'uso di fonti energetiche rinnovabili (biomassa e energia solare). Portata del lavoro: Costruzione n. 1 installazione di nuove caldaie a biomassa sul riscaldamento centrale e centrale. Installazione di raccordi a risparmio energetico ai fini del riscaldamento dell'acqua calda del soffitto dell'ultimo piano dell'edificio B riscaldamento del tetto dell'edificio B riscaldando le pareti esterne dell'edificio A e il connettore Edificio n. 3 installazione di raccordi a risparmio energetico nell'installazione del riscaldamento del tetto dell'edificio delle pareti esterne del mattone e delle terrazze di riscaldamento in legno sostituzione di vecchie finestre in legno e falegnameria di porte Costruzione n. 6/7 installazione di raccordi a risparmio energetico nel sistema di riscaldamento dell'edificio del tetto dell'edificio riscaldamento delle pareti esterne che sostituiscono la finestra e la falegnameria della porta Thermal e della rete di acqua calda. — Conversione del locale caldaia a biomassa in trucioli/pellet alimentati a biomassa con una capacità di 400 kW. Lavori di ristrutturazione e ristrutturazione di locali caldaie per la tecnologia a biomassa. Conversione della tecnologia dell'impianto di caldaie a combustibile solido. Installazione di sistemi di alimentazione e controllo dell'alimentazione del carburante. Condotti del camino con il diametro richiesto. Locale caldaia automatica e installazione elettrica. — Impianto fotovoltaico con una potenza di min. 10,2 kWp, con un sistema di accumulo di energia di 4,5 kWh, montato sull'edificio del locale caldaia o accanto al locale caldaia, automazione, installazione elettrica, struttura di montaggio, impianto fulmini. — Installazione di collettori solari con una superficie attiva di 52,56 m², che supporta la produzione di acqua calda per edifici, serbatoi tampone, acqua calda e calda, raccordi, automazione, costruzione freestanding. Attività didattiche degli utenti destinatari (Italian)
    16 January 2022
    0 references

    Identifiers

    RPDS.03.03.03-02-0004/16
    0 references